APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Moradabad Waste to Energy Plant | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/UP/THE/98859/2019 | Project Cost | 212500 lacs | |
| 2. | |
S. No. in the schedule | 1(d) Thermal Power Plants
| Project Sector | Thermal Projects | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 250 MWh ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Ramnagar Mazra Ahatmali, Moradabad,Uttar Pradesh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 1,3; 192/02; 193/ 02; 495;497 | Town / Village | Ramnagar mazra Ahatmali,Moradabad Uttar pradesh | State of the project | Uttar Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Uttar Pradesh | Moradabad | Moradabad | | 10. | |
Nearest railway station along with distance in kms | - Moradabad Junction, 7.8 km, NW km | Nearest airport along with distance in kms | - IGI International Airport, Delhi, 4.5 km, SW km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | - SH - 78 , 19 km, East km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Moradabad Municipal Corporation Town Hall, Pat Pat Sarai Mohalla, Moradabad, 244001, Uttar Pradesh, 9105900600
Moradabad Zila Panchayat, Civil Lines, Moradabad-244001, Uttar Pradesh, 9105900600 | | 13. | Name of the Applicant | Ajay | | 14. | Registered Address | B-2, Dhawan Deep Building, 6 Jantar Mantar Road | | 15. | |
Address for correspondance: | Name of the Company | A.G. DAUTERS WASTE PROCESSING PRIVATE LIMITED | Name of the Applicant | Ajay | Designation (Owner/ Partner/ CEO) | ManagingDirector | Pin code | 110001 | E-mail | ajay@agdauters.com | Telephone No. | 011-40254386 | Fax No. | 011- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | There would be no change in land use. The land is designated for solid waste disposal / sanitary landfill, composting and WtE plant. Now, a part of existing landfill/ municipal solid waste dump site has been allotted by Moradabad Municipal Corporation (MMC) for setting up of proposed project. | 1.2 | Clearance of existing land, vegetation and buildings? | No | There are no building or, distinct vegetation at site except few bushes. hence, no clearance of existing land is required from forest angle or, permission for tree cutting. | 1.3 | Creation of new land uses? | No | The land is earmarked for Solid Waste to Energy Facility by MMC. There will be no change in land use as landfill site designated for solid waste disposal, composting and Solid Waste to Energy facility by MMC. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Pre- construction activities, i.e. soil investigation shall be carried out. | 1.5 | Construction works? | Yes | Construction work is required for setting up of ‘Solid Waste to Energy’ facility which will have office building, plant area, unloading & handling of MSW, etc as per approved plan. | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Construction labour will be hired from nearby areas so housing for construction workers will not be required. Only temporary sanitation facilities will be provided at site. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | As per Building Plan (during the construction phase), excavation may be required for laying the foundations for boundary & building. The excavated soil will be used for backfilling and landscaping. | 1.9 | Underground works including mining or tunnelling? | No | Not applicable | 1.10 | Reclamation works? | No | Not applicable | 1.11 | Dredging? | No | Not applicable | 1.12 | Offshore structures? | No | Not applicable | 1.13 | Production and manufacturing processes? | Yes | By processing 500 tonnes solid waste and 850 KLD wastewater products , such as, 250 MWh green power, 112 KLD purified water and 112 KLD zero carbon fuel will be produced. | 1.14 | Facilities for storage of goods or materials? | No | Temporary sheds will be used for storage of goods or construction materials before commissioning of plant (during soil investigation, construction, errection, etc). | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | The proposed project itself is a facility for treatment of 500 tonnes waste per day. The waste shall be processed for generation of green power, potable water and zero carbon fuel. There could be generation of 5- 10 kg/day of MSW by workers and staff which will be collected and processed within the facility itself. Wastewater generated from domestic use by staff and workers will be fed in the process. No other wastewater will be generated from the process. Only p | 1.16 | Facilities for long term housing of operational workers? | No | No housing facilities is proposed. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not applicable. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable. | 1.20 | New or diverted transmission lines or pipelines? | No | 1. Pipeline will be laid for pumping wastewater from Nala to WtE plant.
2. Electricity evacuation line will be laid between WtE plant and nearest grid station for evacuation of power | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable. | 1.22 | Stream crossings? | No | No stream is crossing at the project site. | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Wastewater requirement for the project is around 850 KLD. 10 KLD of drinking water is required which will be met through Municipal Water Supply. 850 KLD of wastewater from nearby nala will be pumped. 10 KLD of in-house generated purified water will be used for landscaping and miscellaneous purposes. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | None envisaged | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Materials during construction phase shall be transported by truck, trolley etc. Construction materials like steel, aggregates, sand and cement will be sourced through local retailers and transported by road. Scaffolding, suttering and left over construction material will be transported by road for decommissioning of construction activity. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | None envisaged | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During Construction Phase
Temporary influx of people in the form of labour would occur. Approx. 150 no of local labour shall be employed.
During Operational Phase
During operation of the facility, 37 no. of staff and workers shall be hired. A majority of them will be local. | 1.29 | Introduction of alien species? | No | None envisaged | 1.30 | Loss of native species or genetic diversity? | No | None envisaged | 1.31 | Any other actions? | No | None | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The land is designated for solid waste disposal i.e., landfill site. Now, a part of existing landfill / Solid Waste Dump site has been allotted by Moradabad Municipal Corporation to project proponent for setting up proposed project.
The land where the plant is proposed is part of sanitary landfill. It is not agriculture land. Proposed Solid Waste to Energy Facility will be converting waste into green power, purified water and zero carbon fuel. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water requirement for the project is around 850 KLD. 10 KLD of fresh water is required which will be met through Moradabad Municipal Corporation. 850 KLD of wastewater will be lifted from nearby nala. 10 KLD of in-house generated purified water will be used for landscaping and miscellaneous purposes. | 2.3 | Minerals (MT) | No | Not applicable. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials like stone, aggregates, steel and cement will be sourced through local retailers. | 2.5 | Forests and timber (source – MT) | No | Not envisaged. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power will be required during construction phase. Power for commissioning of plant will not be required. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not envisaged. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not applicable. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Occurrence of disease in vicinity of plant will be reduced considerably since, there would be negligible storage of Fresh Solid Waste in future and legacy waste will be slowly processed reducing it to Zero Storage. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Commissioning of plant will reduce the probability of adverse effects on people due to solid waste disposal and sanitary landfill. It will improve living conditions in the vicinity and Moradabad City. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable | 3.5 | Any other causes | No | None | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Proposed project is for processing the municipal solid waste hence, whatever municipal solid waste generated by workers ( 5 to 10 kg/day) will be collected and processed within the plant for generation of power, water and fuel. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Not applicable. | 4.4 | Other industrial process wastes | No | Non envisaged | 4.5 | Surplus product | No | Will be returned to suppliers | 4.6 | Sewage sludge or other sludge from effluent treatment | No | Not applicable | 4.7 | Construction or demolition wastes | Yes | Construction waste generated will be reused to the extent possible. Rest of the waste will be used for filling of plot. | 4.8 | Redundant machinery or equipment | No | Not applicable | 4.9 | Contaminated soils or other materials | No | Existing legacy solid waste will be removed to a heap and will be processed in the proposed WtE Plant. | 4.10 | Agricultural wastes | No | There is no agricultural activity proposed as part of project.
Tree droppings, grass cuttings and plant treamings from green belt area will be fed in the proposed WtE plant | 4.11 | Other solid wastes | Yes | Generation of solid waste/ ash not envisaged | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | It is a Cold Plasma Gasification process, Emissions- Nil | 5.2 | Emissions from production processes | No | None, exhaust air along with water vapor at 35 ? C will be released in atmosphere | 5.3 | Emissions from materials handling including storage or transport | Yes | All vehicles including JCBs, trucks and compactors would be PUC certificate system compliant. Sand and Cement will be transported with due care to avoid dust emission. Water will be sprinkled on sand during storage. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust emission is likely to be generated during construction phase which will be reduced by water sprinkling at specific time intervals & timely maintenance schedule for construction machinery. Dust control measures will be adopted to contain dust. All machinery, equipments and vehicles will be State of Art, available in market in conformity with prevalent Government regulation. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | During loading & unloading of construction material, dust is likely to be generated during construction phase. Water will be sprinkled and tarpaulin cover will be provided over stored raw material to reduce dust emission.
Sewage will be collected in septic tank of appropriate size.
Construction waste will be filled in to raise the plinth level of plot. | 5.6 | Emissions from incineration of waste | No | There will be no incineration of waste. It is a incineration free technology. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Open burning of biomass/ other material will not be practiced. | 5.8 | Emissions from any other sources | No | Not applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | It is a State of Art WtE plant without boiler/ incineration process. Turbines are of latest design and would be with proper acoustic enclosures. Noise standards within battery limits/ work zone will be complied with as per the Factories Act, 1948 while, noise limits at the boundary of plant will be complied with as per Noise Pollution (Regulation and Control) Rules, 2000. | 6.2 | From industrial or similar processes | Yes | It is a State of Art WtE plant. Noise limits in work zone environment will be complied with as per the Factories Act, 1948.Workers will be provided with earmuffs and other safety gadgets in work zone. | 6.3 | From construction or demolition | Yes | Demolition of structure is not envisaged. State of Art construction equipments, machinery and vehicles will be used at the site. Maintenance schedule for equipments, machinery and vehicles will be adhered to for proper upkeep. | 6.4 | From blasting or piling | No | Blasting will not be undertaken at site. Latest technique will be employed for laying the foundation, as per design. | 6.5 | From construction or operational traffic | Yes | No significant contribution of traffic due to operation of the project is envisaged as the proposed project will be developed within the existing landfill. However, a slight addition can occur during construction phase from movement of construction materials and labour apart from staff during the operation phase. | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | No | None | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | No hazardous substance will be manufactured, stored or, used at the plant. No hazardous waste will be generated at the plant using Cold Plasma Gasification process. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The source of wastewater is from domestic use and sewage so generated will be fed in the plant / process along with wastewater from floor washing. It may not exceed 8-10 m3/ day. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Emission from the facility is not envisaged. Turbine exhaust air along with water vapour will be vented | 7.4 | From any other sources | No | None envisaged | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Since, there will be no emission from the plant, there is no risk of short term or long term build up of pollutants in the environment. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Since, There will be no storage, handling, use or production of hazardous substances at the plant during construction or production, zero risk due to hazardous substances is envisaged. However, proper risk assessment will be done during EIA study and on-site Emergency Management Plan (EMP) will be drawn. | 8.2 | From any other causes | No | None | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The plant area under reference falls under Zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively will be adopted while designing the structure. There is no possibility of landslide in the area. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | All supporting infrastructure, workforce, labour, housing, etc, exists near site i.e., within municipal limit of Moradabad, a district headquarter.
All supporting infrastructure exists near site.
There would be no need for additional land for sanitary landfills after commissioning of the project in future. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | There would be positive impact of the project since no additional land would be needed for sanitary landfill at Moradabad in future. | 9.3 | Set a precedent for later developments | Yes | The proposed Solid Waste to Energy plant, a State of Art facility. Once start operating will set a precedent for later developments. Socio- economic conditions will improve leading to improvement in living standards in the vicinity of plant and Moradabad city. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | The proposed WtE plant which would set an example for Solid Waste to Energy facilities at upcoming metro cities in the country. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No Such area is involved
Hastinapur Wildlife Sanctuary - 146 km, NE
Dudhwa National Park - 226 km, SE
Jim Corbett National park - 76 km, NE
There is no Ramsar site or wetland of International importance within 10 km radius of Moradabad landfill site/ proposed site | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Brij Ghat to Narora barrage Stretch of Ganga river: a Ramsar Site- 80 km, S/SW
Ramganga river - 1.5 km in West
Dhela River - 38.0 km , NE | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | No protected or sensitive area is located within 10 km radius of the proposed project. There is an Eco Park for Dear within 3 km radius. | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | No | None | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | SH- 78, 19 km, East
SH-49, 6.0 km, SW
NH-9, 5.0 km ,NE
NH-509/SH-43, 14.8 km, SW | 7 | Defence installations | No | There is no defence installation within 10 km radius of project site except, CSD Military Canteen at a distance of 9.7 kms in the city | 8 | Densely populated or built-up area | No | The project site is in the vicinity of moderately built up area/ villagers: Ramnagar Mazra Ahatmali, Mustafabad, Mustafabad Ahatmali, etc | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | School
Kendriya Vidyalaya, Railway Harthala colony, 10.5 km, NE
Vivekanand Inter Collage, Rampur Road, 27.5 km, NE
KCM School, Opposite Meston Park , 9.5 km, NE
Gandhi Nagar Public School, DPS, 6 Mile Stone, Moradabad, 25.7 km, West
Maharaja Agrasen Inter Collage, 10.5 km, NE
Arya Kanya Inter Collage, 8.9 km, NE
Hospitals
Mr. Lohia Hospital , Lagpat Nagar, 5.8 km, West
City Hospital Adarsh Nagar, 7.2 km , West
Photon Hospital, 5.0 km, NW
District Hos | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Surface Water Resources: Watercourses-
Ramganga river , 1.5 km, West
Dhela River, 38.0 km - NE | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Rmnagar Mazra Ahatmali Landfill Site. It is a Sanitary landfill area. There will be no adverse impact from proposed project. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The plant area under reference falls under Zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively will be adopted while designing the structure. There is no possibility of landslide in the area. | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
| | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | Therefore, as all the projects are based on same technology and until the decision on 55 MW WtE Project is decided, Committee opined that all other proposals shall be deferred.
| 11 Apr 2019 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Ajay | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | A.G. DAUTERS WASTE PROCESSING PRIVATE LIMITED | Address | B-2, Dhawan Deep Building, 6 Jantar Mantar Road |
|
|