APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | M/s Avadh Sugar & Energy Limited, (Hargaon Distillery) has proposed the expansion project of existing molasses based distillery from 100.0 KLD to 150.0 KLD (AA/ENA/Ethanol) along with expansion of power from 3.0 MW to 6.5 co-generation of Power. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/UP/IND2/88602/2018 | Project Cost | cr | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | the expansion project of existing molasses based distillery from 100.0 KLD to 150.0 KLD (AA/ENA/Ethanol) along with expansion of power from 3.0 MW to 6.5 co-generation of Power. Increase in capacity: 1. 50 KLD INCREASE IN DISTILLERY CAPACITY 2. 3.5 MW INCREASE IN POWER GENERATION ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/UP/IND2/88601/2006 | MoEFCC file number(Previous EC) | J11011/265/2006-IA(II)I | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 20.23 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Village Surjipara ,Hargaon , Tehsil and District Sitapur, U.P. | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | unit will use existing 50 Acre land for proposed expansion. | Town / Village | Village Surjipara ,Hargaon , Tehsil and District Sitapur, U.P. | State of the project | Uttar Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Uttar Pradesh | Sitapur | Sitapur | | 10. | |
Nearest railway station along with distance in kms | Hargaon Railway Station, 1.68 km | Nearest airport along with distance in kms | Lucknow Airport, 113 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Sitapur District , 22.31 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village Surjipara ,Hargaon , Tehsil and District Sitapur, U.P. | | 13. | Name of the Applicant | Rakesh | | 14. | Registered Address | village surjipara, Tehsil Hargaon, District Sitapur | | 15. | |
Address for correspondance: | Name of the Company | AVADH SUGAR & ENERGY LIMITED, (HARGAON DISTILLERY) | Name of the Applicant | Rakesh | Designation (Owner/ Partner/ CEO) | Vice President | Pin code | 224941 | E-mail | avadhsugar123@gmail.com | Telephone No. | 215-224941 | Fax No. | 215- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The proposed plant is proposed in existing unit
area. Hence, No change in land use.
The land is already under the
possession of M/s Avadh Sugar & Energy Limited,(Hargaon Distillery),. After
installation of the plant, about 35%
of the total project area will be
covered under green belt/
plantation, which will contribute to
increase the aesthetic beauty of the
area and reduction of pollution. | 1.2 | Clearance of existing land, vegetation and buildings? | No | The proposed project site is flat and
no leveling of ground will be
required. | 1.3 | Creation of new land uses? | No | Proposed land is already having
industrial builtup land use. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | expansion will be done with the existing distillery site. | 1.5 | Construction works? | Yes | Construction will be done for
installation of various components,
raw material and product storage,
production process areas etc. | 1.6 | Demolition works? | No | Not required. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | UNIT WILL USE EXISTING AREA FOR PEREMPTORY WORKERS. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | There will be above ground
construction of structures for the
said proposal including excavation,
cut & fill etc. | 1.9 | Underground works including mining or tunnelling? | No | No underground works including
mining or tunneling is required. | 1.10 | Reclamation works? | No | No reclamation work is required. | 1.11 | Dredging? | No | No dredging is involved | 1.12 | Offshore structures? | No | Not Applicable. | 1.13 | Production and manufacturing processes? | Yes | Production From Molasses : 1.
Molasses Dilution 2. Yeast
Propagation 3. Fermentation 4. Multi
Pressure Distillation 5. Multi Effect
Evaporation 6. Incineration Boiler 7.
Alcohol daily receivers & bulk
storage. Co Generation Power Plant
(6.5 MW): 1. Multi fuel based Boiler
will be used as fuel for generation of
steam. 2. Steam from boiler will be
utilized for generation of power &
also in distillation process. 3. Power
generation will be through steam
turbine. | 1.14 | Facilities for storage of goods or materials? | Yes | Adequate storage facilities for raw
material and finished product will be
provided within the proposed expansion project
site. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | For Spent Wash Treatment:
MEE + Incineration
(Slop fired Boiler)
For Other Effluent
(Condensate, Leese , Floor washing , Blow downs) Secondary Treatment Plant shall be installed upto tertiary level to achieve the ZERO DISCHARGE. | 1.16 | Facilities for long term housing of operational workers? | No | shift wise workers | 1.17 | New road, rail or sea traffic during construction or operation? | No | No new road, rail or traffic
during construction or operation will
be required. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Only small additional road traffic for
transportation of plant equipment,
construction material, raw material
and finished goods will be required
within premises of proposed expansion of
Distillery Plant. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements will be required. | 1.20 | New or diverted transmission lines or pipelines? | No | No New or diverted transmission
lines or pipelines will be required. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There will be no impoundment,
damming, culverting, realignment or
other changes to the hydrology of
watercourses or aquifers. | 1.22 | Stream crossings? | No | No stream crossing is envisaged. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | 1050.0 KLD@7.0 KL/KL of Alcohol for industrial use, and 20.0 KLD for domestic purposes.
Total water requirement:1070 KLD. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There will be no change in water
bodies or the land surface affecting
drainage or runoff | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transportation of raw materials &
products will be done by road. | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | No Long term dismantling or
decommissioning or restoration
works is required. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | Yes | Fugitive dust emission will occur due
to transport and excavation of soil.
Water sprinkling will be done during
construction phase. | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | 20 persons | 1.29 | Introduction of alien species? | No | nil | 1.30 | Loss of native species or genetic diversity? | No | no any | 1.31 | Any other actions? | No | . | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | expansion will be done with the existing distillery premises. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Fresh water requirement will be
meet out through Ground water
(Tube well).
1050.0 KLD@7.0 KL/KL of Alcohol for industrial use, and 20.0 KLD for domestic purposes.
Total water requirement:1070 KLD. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Locally available building material
will be utilized. More of the work will
be fabrication work. Some
equipments and machineries will be
installed. | 2.5 | Forests and timber (source – MT) | No | No Forests and timber will be used
during construction / operation of
the project activity. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | FUEL REQUIREMENT:
Bagasse = 280 TPD
+
Slop =320 m3/day | 2.7 | Any other natural resources (use appropriate standard units) | No | NIL | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No hazardous substances will be
used in the proposed distillery
project except a little quantity of
spent oil which will be generally
consumed in lubricating external
parts of machineries. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | No effect is envisaged | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | There will be positive impact of the
project in the area as follows : 1.
Direct & Indirect employment
opportunities will rise, thusimproving the economic status of
the villagers. 2. Communication &
transport facilities will be improved.
3. Education facilities will be
improved. 4. Community health care
programmes provide better health
and medical facilities not only to the
employees but also to the villagers. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No effect envisaged | 3.5 | Any other causes | No | . | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal solid waste generated
from plant will be collected,
segregated and disposed off
scientifically. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used oil will be carefully stored in
HDPE drums in isolated covered
facility. The used oil will be sold to
CPCB authorized vendors. Suitable
care will be taken to avoid the
spills/leaks of used oil. | 4.4 | Other industrial process wastes | Yes | Total Ash Generated : 18.0 TPD
Fermenter sludge: 10.0 TPD
Use: Total Ash & sludge shall be used as manure. | 4.5 | Surplus product | No | There will be no Surplus Product. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Septic tank and soak pit will be
provided for domestic sewage
Sludge. | 4.7 | Construction or demolition wastes | Yes | Construction waste like soil, brick
bats, etc. will be utilized in leveling
of land and construction of roads. | 4.8 | Redundant machinery or equipment | No | There will not be any redundant
machinery or equipment. | 4.9 | Contaminated soils or other materials | No | There will be no contamination of
soil or any other material. | 4.10 | Agricultural wastes | No | There will not be any agricultural
waste | 4.11 | Other solid wastes | No | There will not be any other solid
waste except the above mentioned. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | No fossil fuel will be used as fuel in
the proposed industry. Emission
from fuel (Bagasse + SLOP/ Bagasse
) burning, which consists of
pollutants like PM, would be
discharged into atmosphere through
APCS/ stacks of suitable height. The
emissions will be limited &
mitigation measures will be taken
for the proposed expansion project. | 5.2 | Emissions from production processes | Yes | CO2 approx - 68.0 MT/Day will be
generated during fermentation
process which will be collected and
sold to vendors. | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust generated near raw material
handling and transfer points will
prevented by suppression through
water. Hence there will not be any
fugitive dust emissions due to raw
material handling. Proposed road
will be capable of absorbing this
additional traffic. Hence there will
not be any adverse effect due to
transportation and Storage of raw
materials. | 5.4 | Emissions from construction activities including plant and equipment | No | The emissions are negligible which
will be only due to transportation
activities. The construction activities
will also involve negligible
emissions, as most of the work will
be of fabrication and erection of
structures only and mitigation
measures would be taken to reduce
it further. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | During loading & unloading of raw
material dust is likely to be
generated during construction
phase. Water will be sprinkled and
covers will be provided for
construction materials to reduce
dust emission. Odour problems will
be controlled at source by good
operational practices, including
physical and management control
measures. | 5.6 | Emissions from incineration of waste | Yes | SLOP will be fired in Slop fired
boiler.
1 No. of additional stack is proposed of 72.0 Meters Height with ESP to control the emissions within the norms. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | There will be no emissions from any
other sources | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | In the plant, noise from operation of
equipments will be generated. Noise
level will be kept below the limit
prescribed by CPCB. Noise
abatement measures will be taken
and persons working close to
machines will be provided with
personal protective equipments viz.
Ear plugs/Ear muffs etc. for further
protection. | 6.2 | From industrial or similar processes | Yes | The noise generation from
machinery will be low and limited as
the entire process will be in a closed
circuit. There will be some noise
generation due to the working
motors only. The details of noise
effect are same as explained at item
6.1 above. | 6.3 | From construction or demolition | No | The construction work involves more of
the fabrication work. | 6.4 | From blasting or piling | No | NIL | 6.5 | From construction or operational traffic | Yes | The noise generated from
construction activities will be of
temporary nature and maintained
within the prescribed Noise
standards. | 6.6 | From lighting or cooling systems | Yes | Some noise will be generated from
Cooling Towers but the same will be
maintained within the prescribed
limit. | 6.7 | From any other sources | No | There will be no other sources for
noise generation. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | No use / handling of hazardous
material except during annual oil
change period, which shall be
handled in closed containers. Also
care will be taken during its use for
lubrication of external part of
equipment, that nothing spills on
ground to contaminate soil. Suitable maintenance of equipments will be
done to keep them leakage free. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The proposed distillery is based on
the concept of “Zero Liquid
Discharge” hence no sewage or
other effluent will be discharged
outside the plant premises. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Adequate stack height (72 METERS) along with
ESP shall be provided for the
boile. Pollution control management
will be followed. All necessary
pollution control devices will be
installed in order to keep the
emissions under control. | 7.4 | From any other sources | No | NIL | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Likelihood of such an event is not
foreseen and suitable measures will
be adopted so that there will be no
such risk in the coming future. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Possibility of accident on account of
explosion, spillages, fire or
hazardous substances etc. is very
less. Maintenance, operation and
leakage proof condition of
machinery eliminates possibilities of
fire. Fire extinguishers will be made
available near all machines and all
persons would be trained to quench
the fire at source itself. No other
major risks will be involved. | 8.2 | From any other causes | No | NIL | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The area falls in Zone IV (High),
according to the Indian Standard
Seismic Zoning Map. Suitable
seismic coefficients in horizontal and
vertical directions respectively, will
be adopted while designing the
structure | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Management will provide
appropriate contribution towards
improvement of Medical and
educational facilities for rural
population in the vicinity. •The
industry will help in promoting the
activities related to environmental
awareness in nearby villages.
•Trained operators and workers in
various aspects of EHS
(Environment, Health and Safety)
will be employed. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Negligible impact is envisaged on
air, noise and aesthetic parameters
due to the proposed project. | 9.3 | Set a precedent for later developments | Yes | A better after use scenario, which is
likely to increase aesthetic beauty of
area and greenery, should set
precedence for subsequent
entrepreneurs who venture such
projects. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | There will be no environmental
effects or the potential for
cumulative impacts with other
existing or planned activities in the
locality. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | NIL | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | • Sarayan River located 6.41 Km in South West Direction from the project site.
• Kheri Branch Sharda Canal located 3.17 Km in East Direction from the project site
• Khairabad Distributary is located 1.83 km in North West direction from the project site. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | There are no areas used by
protected, important or sensitive
species of flora or fauna for
breeding, nesting, foraging,
resting, over wintering, migration
within 15 km radius of the project
boundary. | 4 | Inland, coastal, marine or underground waters | No | NIL | 5 | State, National boundaries | No | NO ANY | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NO ANY | 7 | Defence installations | No | NO ANY | 8 | Densely populated or built-up area | Yes | Hargaon is located 1.68 Km in south West Direction | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Many number of primary schools,
dispensaries, small hospitals,
places of worship, within 15 km
from the plant site | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None in close proximity of site to
have any effect. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | There is no critically polluted area
in 15 km radius of the plant site. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The plant site falls in Seismic Zone
IV (High) as per IS: 1893 (PartI):
2002. All necessary design
consideration for earthquake
resistant structure shall be
incorporated in the design of the
project. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 12 Jan 2019 | 2. | NA | Please refer our earlier observations, kindly submit proposal in parivesh portal for transfer of EC and then resubmit the proposal for ToR | 31 Dec 2018 | 3. | NA | The correction have been made as per the instruction received | 21 Dec 2018 | 4. | NA | Kindly also submit a proposal for transfer of EC in favour of new company. | 17 Dec 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Rakesh | Designation | Vice President | Name of Company (Applicant Name should not be given here) | AVADH SUGAR & ENERGY LIMITED, (HARGAON DISTILLERY) | Address | village surjipara, Tehsil Hargaon, District Sitapur |
|
|