APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Petrochemical Complex by adding Polypropylene unit at Pata, District Auraiya, Uttar Pradesh by M/s GAIL (India) Limited
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/UP/IND2/113956/2019
Project Cost 75145 lacs
2.
S. No. in the schedule5(c) Petro-chemical complexes (industries based on processing of
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 60 KTPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/UP/IND2/113955/2010
MoEFCC file number(Previous EC)J-11011/595/2010-IA II (I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 585 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPata
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.834M, 905, 941M, 1008, 1094, 1140
Town / VillagePATA
State of the projectUttar Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Uttar PradeshAuraiyaBidhuna
10.
Nearest railway station along with distance in kms Phaphund, 8.6 km
Nearest airport along with distance in kms Kanpur, 100 km
11. Nearest Town/City/District Headquarters along with distance in kms Dibiyapur , 4.5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Pata Panchayat,Bidhuna Tehsil, Pin code-206244
13. Name of the Applicant Santanu
14. Registered Address GAIL PATA
15.
Address for correspondance:
Name of the Company GAIL INDIA LIMITED PATA
Name of the Applicant Santanu
Designation (Owner/ Partner/ CEO) GM
Pin code 110066
E-mail s.patatunda@gail.co.in
Telephone No. 11-26180151
Fax No. 11-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed project is coming within existing Petrochemical complex. Temporary change in land use is envisaged.
1.2 Clearance of existing land, vegetation and buildings? No Not Applicable
1.3 Creation of new land uses? No Not Applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing shall be carried out
1.5 Construction works? Yes Construction will be carried out at proposed site
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? Yes A temporary site near to proposed project area will be suitably created for workers with all adequate infrastructure facilities like potable water, temporary housing, sanitation facilities etc.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Construction of Warehouse & PP unit will be constructed which will require civil construction including excavation.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes Brief process description and capacities of the proposed project is given in PFR attached separately.
1.14 Facilities for storage of goods or materials? Yes Storage facilities will be provided.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes All guidelines of MoEFCC/CPCB would be complied for disposal/recycle/reclamation of solid waste which is spent catalyst. Additional 0.5 m3/hr effluents shall be generated and routed to existing Effluent Treatment Plant.
1.16 Facilities for long term housing of operational workers? Yes Township and associated facilities shall be extended to the operational workers.
1.17 New road, rail or sea traffic during construction or operation? Yes Internal roads will be developed as per project layout plan during construction phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes No abstraction of ground water is envisaged.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes There will be some increase in transport of materials during Construction and Operational phases.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Marginal Increase in influx of people during construction period.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Additional proposed land is partly undeveloped.
2.2 Water (expected source & competing users) unit: KLD Yes No additional fresh water demand is envisaged for proposed project. The allocated fresh water (2040 m3/hr) for existing petrochemical complex is sufficient to meet the demand of proposed project. Existing fresh water is sourced from Etawah Branch of Lower Ganga Canal system through Burhadana Distributory
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Minimal as it is mostly mechanical erection. Soil for site grading shall be used from the plot area.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Additional 3 MW power is required for the proposed project and will be sourced from State Grid.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Catalyst and chemicals will be used in the proposed project.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes During the construction phase, indirect employment will be generated temporarily which will help in welfare of local people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Soil, overburden generated during excavation will be used for refilling of low lying area and back filling.
4.2 Municipal waste (domestic and or commercial wastes) No There shall be no generation of domestic and commercial waste.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes All statutory rules/guidelines of MoEFCC/CPCB will be complied prior to recycle, reclamation, sale and suitable disposal of catalyst.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product Yes All products will be marketed.
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from the existing ETP Plant will be disposed to TSDF site following the guidelines prescribed by the State authorities.
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes Yes Metal scraps generated during Construction phase will be sold.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes SO2 emissions due to the proposed project shall be negligible. Total SOx emission from the petrochemical complex shall be within MoEFCC prescribed limit.
5.2 Emissions from production processes Yes Refer 5.1.
5.3 Emissions from materials handling including storage or transport Yes Marginal emissions due to vehicular movement for transportation and storage which is reversible.
5.4 Emissions from construction activities including plant and equipment Yes Marginal increase in vehicular emissions which shall be local, marginal and limited to construction period.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust due to construction activities will be localized in nature within the complex.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes All equipment’s are designed to comply with OSHA requirements. Noise level at the battery limit shall comply with stipulated norms.
6.2 From industrial or similar processes Yes The noise levels from all industrial activities would be within permissible limits. Protective gears will be used by the occupational workers.
6.3 From construction or demolition Yes Construction or demolition activities shall be carried out within the complex. Noise level at the battery limit shall comply with stipulated norms.
6.4 From blasting or piling Yes Piling activities shall be carried out as per project requirement.Noise level at the battery limit shall comply with stipulated norms.
6.5 From construction or operational traffic Yes There will be marginal increase in noise due to traffic movement in the project area due to transportation of materials and machine.
6.6 From lighting or cooling systems Yes All equipment’s shall meet the OSHA requirement. Noise level at the battery limit shall comply with stipulated norms.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No All materials and chemicals will be handled as per best safety practices and in accordance with the applicable rules. All necessary precautions shall be in place to prevent any spill/ contamination. The same shall be addressed during design & engineering stage.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes The industrial liquid effluent expected from the proposed project shall be routed to ETP for treatment, complying with MoEFCC/CPCB norms. Discharge from ETP will be recycled and minimal quantity of effluent shall be discharged into Sengar River.
7.3 By deposition of pollutants emitted to air into the land or into water Yes All emissions from proposed project shall comply with the applicable regulatory standards. Emissions/ Discharges of pollutants shall be minimized by adopting best available technology and engineering practices.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes A well developed Disaster Management Plan (DMP) will be prepared for the complex. Risk Assessment for the complex will be carried out and the recommended risk mitigation measures shall be complied.
8.2 From any other causes Yes All safety measures/standards will be followed. Adequate training shall be imparted to construction workers.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Design & engineering of the project will take consideration of all such eventualities. Proposed Complex will be constructed in Seismic Zone II of earthquake zone.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Development of adjoining area to the complex is envisaged.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes Downstream Industries are envisaged.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes There are roads used by the public surrounding the project site.
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes Dibiyapur is 4.5 km from the project site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Small temples, schools and primary health centre also exist.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The proposed site falls under Seismic Zone-II.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSantanu
DesignationGM
Name of Company (Applicant Name should not be given here)GAIL INDIA LIMITED PATA
AddressGAIL PATA