APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Expansion of Petrochemical Complex by adding Polypropylene unit at Pata, District Auraiya, Uttar Pradesh by M/s GAIL (India) Limited | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/UP/IND2/113956/2019 | Project Cost | 75145 lacs | |
| 2. | |
S. No. in the schedule | 5(c) Petro-chemical complexes (industries based on processing of
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 60 KTPA ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/UP/IND2/113955/2010 | MoEFCC file number(Previous EC) | J-11011/595/2010-IA II (I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 585 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Pata | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 834M, 905, 941M, 1008, 1094, 1140 | Town / Village | PATA | State of the project | Uttar Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Uttar Pradesh | Auraiya | Bidhuna | | 10. | |
Nearest railway station along with distance in kms | Phaphund, 8.6 km | Nearest airport along with distance in kms | Kanpur, 100 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Dibiyapur , 4.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Pata Panchayat,Bidhuna Tehsil,
Pin code-206244 | | 13. | Name of the Applicant | Santanu | | 14. | Registered Address | GAIL PATA | | 15. | |
Address for correspondance: | Name of the Company | GAIL INDIA LIMITED PATA | Name of the Applicant | Santanu | Designation (Owner/ Partner/ CEO) | GM | Pin code | 110066 | E-mail | s.patatunda@gail.co.in | Telephone No. | 11-26180151 | Fax No. | 11- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The proposed project is coming within existing Petrochemical complex. Temporary change in land use is envisaged. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not Applicable | 1.3 | Creation of new land uses? | No | Not Applicable | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil testing shall be carried out | 1.5 | Construction works? | Yes | Construction will be carried out at proposed site | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | A temporary site near to proposed project area will be suitably created for workers with all adequate infrastructure facilities like potable water, temporary housing, sanitation facilities etc. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction of Warehouse & PP unit will be constructed which will require civil construction including excavation. | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Brief process description and capacities of the proposed project is given in PFR attached separately. | 1.14 | Facilities for storage of goods or materials? | Yes | Storage facilities will be provided. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | All guidelines of MoEFCC/CPCB would be complied for disposal/recycle/reclamation of solid waste which is spent catalyst. Additional 0.5 m3/hr effluents shall be generated and routed to existing Effluent Treatment Plant. | 1.16 | Facilities for long term housing of operational workers? | Yes | Township and associated facilities shall be extended to the operational workers. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Internal roads will be developed as per project layout plan during construction phase. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | No abstraction of ground water is envisaged. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | There will be some increase in transport of materials during Construction and Operational phases. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Marginal Increase in influx of people during construction period. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Additional proposed land is partly undeveloped. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | No additional fresh water demand is envisaged for proposed project. The allocated fresh water (2040 m3/hr) for existing petrochemical complex is sufficient to meet the demand of proposed project. Existing fresh water is sourced from Etawah Branch of Lower Ganga Canal system through Burhadana Distributory | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Minimal as it is mostly mechanical erection. Soil for site grading shall be used from the plot area. | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Additional 3 MW power is required for the proposed project and will be sourced from State Grid. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Catalyst and chemicals will be used in the proposed project. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | During the construction phase, indirect employment will be generated temporarily which will help in welfare of local people. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | Soil, overburden generated during excavation will be used for refilling of low lying area and back filling. | 4.2 | Municipal waste (domestic and or commercial wastes) | No | There shall be no generation of domestic and commercial waste. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | All statutory rules/guidelines of MoEFCC/CPCB will be complied prior to recycle, reclamation, sale and suitable disposal of catalyst. | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | Yes | All products will be marketed. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from the existing ETP Plant will be disposed to TSDF site following the guidelines prescribed by the State authorities. | 4.7 | Construction or demolition wastes | No | Not Applicable | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | Yes | Metal scraps generated during Construction phase will be sold. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | SO2 emissions due to the proposed project shall be negligible. Total SOx emission from the petrochemical complex shall be within MoEFCC prescribed limit. | 5.2 | Emissions from production processes | Yes | Refer 5.1. | 5.3 | Emissions from materials handling including storage or transport | Yes | Marginal emissions due to vehicular movement for transportation and storage which is reversible. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Marginal increase in vehicular emissions which shall be local, marginal and limited to construction period. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust due to construction activities will be localized in nature within the complex. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | All equipment’s are designed to comply with OSHA requirements. Noise level at the battery limit shall comply with stipulated norms. | 6.2 | From industrial or similar processes | Yes | The noise levels from all industrial activities would be within permissible limits. Protective gears will be used by the occupational workers. | 6.3 | From construction or demolition | Yes | Construction or demolition activities shall be carried out within the complex. Noise level at the battery limit shall comply with stipulated norms. | 6.4 | From blasting or piling | Yes | Piling activities shall be carried out as per project requirement.Noise level at the battery limit shall comply with stipulated norms. | 6.5 | From construction or operational traffic | Yes | There will be marginal increase in noise due to traffic movement in the project area due to transportation of materials and machine. | 6.6 | From lighting or cooling systems | Yes | All equipment’s shall meet the OSHA requirement. Noise level at the battery limit shall comply with stipulated norms. | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | All materials and chemicals will be handled as per best safety practices and in accordance with the applicable rules. All necessary precautions shall be in place to prevent any spill/ contamination. The same shall be addressed during design & engineering stage. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | The industrial liquid effluent expected from the proposed project shall be routed to ETP for treatment, complying with MoEFCC/CPCB norms. Discharge from ETP will be recycled and minimal quantity of effluent shall be discharged into Sengar River. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | All emissions from proposed project shall comply with the applicable regulatory standards. Emissions/ Discharges of pollutants shall be minimized by adopting best available technology and engineering practices. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | A well developed Disaster Management Plan (DMP) will be prepared for the complex. Risk Assessment for the complex will be carried out and the recommended risk mitigation measures shall be complied. | 8.2 | From any other causes | Yes | All safety measures/standards will be followed. Adequate training shall be imparted to construction workers. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Design & engineering of the project will take consideration of all such eventualities. Proposed Complex will be constructed in Seismic Zone II of earthquake zone. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Development of adjoining area to the complex is envisaged. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | Yes | Downstream Industries are envisaged. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not Applicable | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | There are roads used by the public surrounding the project site. | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | Dibiyapur is 4.5 km from the project site. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Small temples, schools and primary health centre also exist. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The proposed site falls under Seismic Zone-II. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Santanu | Designation | GM | Name of Company (Applicant Name should not be given here) | GAIL INDIA LIMITED PATA | Address | GAIL PATA |
| |
|