APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Technical Grade Pesticide Manufacturing Unit | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/UP/IND2/113916/2019 | Project Cost | 700 lacs | |
| 2. | |
S. No. in the schedule | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Plant Capacity: 1150 TPA (Herbicides- 650 TPA, Fungicides- 200 TPA, Insecticides- 300 TPA) ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | B-16,17, UPSIDC Industrial Area, Salempur, Hathras, Uttar Pradesh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | B-16, 17 | Town / Village | Salempur | State of the project | Uttar Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Uttar Pradesh | Hathras | Hathras | | 10. | |
Nearest railway station along with distance in kms | Hathras Junction, 10.87 km | Nearest airport along with distance in kms | Agra Airport, 61.92 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | NH-91 , 12.08 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Hathras | | 13. | Name of the Applicant | Pradeep | | 14. | Registered Address | B 16-17 UPSIDC INDUSTRIAL AREA SALAMPUR HATHARAS | | 15. | |
Address for correspondance: | Name of the Company | EXCEL PHOSPHATES PVT LTD | Name of the Applicant | Pradeep | Designation (Owner/ Partner/ CEO) | Director | Pin code | 250103 | E-mail | excel2011phosphate@gmail.com | Telephone No. | 121-2441970 | Fax No. | 121-01212441970 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The unit will be situated within the designated notified industrial area promoted by UPSIDC. The land area has been allotted in favour of M/s Excel Phosphates Private Limited by UPSIDC. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Presently, the proposed project land 6080 sqm is a vacant land with few shrubs and bushes which shall be cleared before the installation of the project. | 1.3 | Creation of new land uses? | No | - | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not required | 1.5 | Construction works? | Yes | Construction work will be done for plants/sheds/warehouses. | 1.6 | Demolition works? | No | Nor required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not required | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | It will be as per the plant design. | 1.9 | Underground works including mining or tunnelling? | Yes | Underground works maybe required for UG storage tanks & foundation work for sheds, lab, office building etc. | 1.10 | Reclamation works? | No | Not applicable | 1.11 | Dredging? | No | Not applicable | 1.12 | Offshore structures? | No | Not applicable | 1.13 | Production and manufacturing processes? | Yes | Industry will manufacture Herbicides, Fungicides, Insecticides. Details are given in Pre-feasiblity Report. | 1.14 | Facilities for storage of goods or materials? | Yes | The raw material storage and handling yard will be located within the project site and separated by enclosures. All Solids (Raw Materials) will be stored in warehouse and taken to manufacturing area in closed containers. All the liquid (Raw Materials) will be stored in leak proof MS/SS/PP/FRP tanks at a secured and contained location with proper safety measures. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Municipal Solid waste: 7 kg/day out of which 3 kg/day of bio degradable waste will be given to authorized vendor and 4 kg/day shall be given to authorized vendor. ETP slude and MEE salt (15 MT/year). spend catalyst (10 MT/year) & process resudue (40 MT/year) shall be disposed off to TSDF sites. | 1.16 | Facilities for long term housing of operational workers? | No | The workers will be available from nearby local areas thus there will be no need of housing for staff. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing transportation facilities will be used. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not required | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No such closure or diversion of existing transport is required. | 1.20 | New or diverted transmission lines or pipelines? | No | No new or diversion of transmission lines or pipelines will be done. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | 1.22 | Stream crossings? | No | Not applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Water shall be supplied by municipal supply. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Surrounding water bodies and land use will not be affected due to water consumption. The unit will be established in notified UPSIDC industrial area itself. Water will be sourced from municipal supply.Sewage & Industrial effluent will be treated in the Effluent Treatment Plant followed by RO & MEE. It will be a zero-discharge complex. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | All raw materials will be transported using road trucks from various parts of India and imported raw materials will be transported using ship and then road trucks. All the finished products will be transported using road trucks to various parts of India and ship for exports. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | There will be temporary influx of 25 nos. per day of labor for installing the unit.
During operational phase, there will be influx of approx. 47 people including management, staff & workers. | 1.29 | Introduction of alien species? | No | There is no alien species at the proposed site. | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity. | 1.31 | Any other actions? | No | No additional action will be implemented. | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Site is under notified area for industries developed by Uttar Pradesh State Industrial Development Corporation (UPSIDC). | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Source of Water: Municipal supply
Total water required will be 30.5 KLD out of which 14.5 KLD will be met from recycled treated water and 16 KLD will be from Municipal Supply | 2.3 | Minerals (MT) | Yes | Iron, Steel, Aluminium and Glass etc. will be used for construction as per the requirements & shall be bought from local market. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Cement, Stone, Steel etc. will be used for construction activities as per the requirements & shall be sourced from local market. | 2.5 | Forests and timber (source – MT) | Yes | No forest products will be used for construction work as well as during the operational phase. Timber may be used for office furniture only | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity- 125 kVA
Source: UPPCL
DG set- 1 x 125 kVA
Fuel: 0.5 TPH Coal/ Wood for Boiler
HSD for backup DG sets | 2.7 | Any other natural resources (use appropriate standard units) | No | None | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Storage of all chemicals shall not exceed their threshold limit, wherever threshold is exceeded Clearance shall be obtained as per MSIHC Rules, 1989.
Details of material used and their threshold limit given in PFR report. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable drainage and waste management measures shall be adopted. This restricts stagnation of water or accumulation of water. No occurrence of Diseases is anticipated. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | The project affects the nearby people in positive ways through employment generation. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No vulnerable group of people will be affected by the project. | 3.5 | Any other causes | No | None | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal solid waste: Total 7 kg/day Municipal solid waste will be generated out of which 3 kg/day of Bio-Degradable waste will be given to authorized vendor, Recyclable Waste of 4 kg/day shall be given to Authorized Recycler. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Hazardous Wastes generated from the processes and manufacturing operations shall be disposed to approved TSDF facility of UPPCB.
ETP sludge & MEE salt 15 MT/year, spent catalyst 10 MT/year and Process residue (40 MT/Year) shall be generated and disposed to TSDF site | 4.4 | Other industrial process wastes | Yes | Industrial Non-hazardous process wastes and residues shall be treated and disposed off through in-house mini incinerator. | 4.5 | Surplus product | Yes | Only in extenuating circumstances; Off specification production/ excess product etc. shall be incinerated or disposed as hazardous waste as the case maybe. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | ETP sludge & MEE salt 15 MT/year, spent catalyst 10 MT/year and Process residue (40 MT/Year) shall be generated which shall be disposed to TSDF site. | 4.7 | Construction or demolition wastes | No | Not required | 4.8 | Redundant machinery or equipment | No | Not applicable | 4.9 | Contaminated soils or other materials | No | Not applicable | 4.10 | Agricultural wastes | No | Not applicable | 4.11 | Other solid wastes | Yes | Discarded Containers will be generated and used for packing of ETP sludge & in case of excess it will be sold to approved recycler or traders. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Major air pollutants sources: Boiler: Use of Coal in proposed one steam Boiler 1 TPH. 30 m chimney shall be provided with cyclone dust collector followed by Bag House Filter. Mini- Incinerator: Mini- Incinerator for disposal of process residue shall be provided with alkali scrubber with adequate stack.Process Reactors: Process reactor shall be channelized and provided with wet scrubber for the removal of gaseous pollutants DG sets: HSD in DG sets (125 kVA) | 5.2 | Emissions from production processes | Yes | Flue gases shall be generated in the production processes of different products and by-product which contain Hydrogen Sulfide (H2S), Hydrochloric acid (HCl), Sulphur Dioxide (SO2) and Total Particulate Matter (TPM). For control of emissions from various processes, Air Pollution Control Devices shall be installed based on pollution load and suitability with contaminant. | 5.3 | Emissions from materials handling including storage or transport | No | Not applicable | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust is likely to be generated from materials handling including transportation. Water sprinkling will be used for dust suppression. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | There will be generation of particulate matters due to construction activities. However, care will be taken to make it minimum.
Domestic waste water along with effluent will be treated in effluent treatment plant and ventilation shall be provided to ensure minimum malodour.
Plant manufacturing area will be neat and clean. All the reactions will be carried out in closed vessels. | 5.6 | Emissions from incineration of waste | No | None | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | None | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Source of noise pollution from the plant will be pumps & motors, machineries, cooling tower, DG set, etc. Adequate sound enclosures will be provided to all equipment and machineries generating high noise & ear protecting devices will be provided to the workers working in such areas where noise levels will be high.
Greenbelt will be developed to abate the noise levels. | 6.2 | From industrial or similar processes | Yes | Sources of noise pollution from the plant will be Pumps & Motors, Machineries, Cooling Tower, D.G. set etc. | 6.3 | From construction or demolition | Yes | Noise generated from the construction activities will be mitigated by use of adequate PPE and noise barriers shall be proposed if required. | 6.4 | From blasting or piling | No | No blasting or piling will be done. | 6.5 | From construction or operational traffic | Yes | Noise will be generated from vehicular movement in the installation/construction and operational phase which will be within permissible limit. Green belt developed at the periphery of the project site will act as barrier to noise. | 6.6 | From lighting or cooling systems | No | Not applicable | 6.7 | From any other sources | No | Not applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Industry will provide adequate storage area for the safe storage of products, raw materials and hazardous chemicals.
Proper care shall be taken to avoid any spillage.
Proper care for handling of hazardous material will be taken as per the MSIHC rules & HW management Rules, 2016. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Sewage & generated effluent will be treated in Effluent Treatment Plant & it will be a Zero Liquid Discharge unit. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | No major impact is anticipated by deposition of pollutants emitted to air, into the land or into water due to all the necessary air pollution control measures to be adopted for controlling the air pollution within the norms specified by Central/State Pollution Control Board. | 7.4 | From any other sources | No | None | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | Yes | No major impact is anticipated due to fact that all necessary steps will be provided to control air pollution, water pollution and noise levels within the Central/State Pollution Control Board Norms. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | During the construction work no hazardous substances will be used, handled and stored. Therefore, no risk of accidents is anticipated due to hazardous substances.
Industry will carry out a detailed risk assessment study/ disaster management plan and all recommended safety measures will be incorporated in the plant. | 8.2 | From any other causes | No | None | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | May effect by earthquakes because industry will be located in seismic zone-IV. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | No impact on the surrounding environment is envisaged | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | No | Not Applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None within 15 km radius | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Siktara Distributary: Adjacent N
Pond Near Nagla Kanch: 1.29 km SE
Harduaganj Distributary: 1.33 Km SWW
Siktra Minor: 1.44 Km SW
Todh Minor: 1.45 Km SW
Sengar Nadi: 3.75 Km SW
Sidhamai Drain: 3.85 km SW
Etawah Branch (upper Ganga Canal): 4.09 Km NE
Pond Near Jauinayatpur: 4.13 Km E
Pond Near Chhitupur: 4.52 Km SE
Sohawali Distributary: 4.88 Km NE
Nagla Adhu Drain: 5.29 km SWW
Pond Near Barhad: 6.13 Km NW
Pond Near Haidaipur: 6.36 Km SE
Band Abdullahapur | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | No | None | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Road
SH33: 0.14 km S
NH-91: 12.08 km NE
Railway Station
Rati ka Nagla Railway Station: 1.81 km E
Hathras Railway Junction: 10.87 km SWW
Airport
Agra Airport: 61.92 km SW
Indira Gandhi International Airport: 147.82 km NNW | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | Yes | Nagla Kanch: 0.25 km SE | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospital
Hospital Near Chhitupur5.69 km SE
Government Hospital Hathras Junction9.85 km SWW
Govt. Ayurvedic Hospital Sokhna (Hathras) 18.09 km SWW
Gulati Nursing Home19.34 km SWW
Post Office
Post Office Thulai4.77 km W
Post Office Bastoi5.87 km NEE
Post Office Near Hasayan6.22 km SE
Post Office Khera Tikari6.34 km NW
Post Office Kailora7.81 km SWW
Place of Worship
Shiva Temple (Nagendra) 3.65 km NNE
Pathvari Mata temple5.68 km SSE
Shri Hanuman Temple6.18 km SSE
Masjid—Fasahati Mosq | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project area falls in seismic zone –IV according to seismic zone map of India. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 20 Aug 2019 | 2. | NA | Please refer our earlier observations, please inform whether the project is located in a polluted area | 14 Aug 2019 | 3. | NA | The correction have been made as per the instruction received | 13 Aug 2019 | 4. | NA | Please confirm that the project site is not falling in critically polluted area/severely polluted area | 13 Aug 2019 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Pradeep | Designation | Director | Name of Company (Applicant Name should not be given here) | EXCEL PHOSPHATES PVT LTD | Address | B 16-17 UPSIDC INDUSTRIAL AREA SALAMPUR HATHARAS |
|
|