APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Integrated Steel Plant; MS Billet (from 330000 MTPA to 653400 MTPA), Captive power (from 53 MW to 80.5 MW), Sponge Iron (from 297000 MTPA to 594000 MTPA) and New Pellet plant establishment-792000 MTPA at AL-5 Sector 23 GIDA Industrial Area, Sahjanwa, District – Gorakhpur Uttar Pradesh – 273209 of M/s Gallantt Ispat Limited
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/UP/IND/93041/2019
Project Cost 602.53 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 45.9 ha, Integrated Steel Plant; MS Billet (653400 MTPA), Captive power (80.5 MW), Sponge Iron (594000 MTPA) and New Pellet plant establishment-792000 MTPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/UP/IND/55089/2016
MoEFCC file number(Previous EC)J-11011/229/2008-IA.II(I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 40.5 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot No. AL – 5, Sector No. 23, GIDA,
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot No. AL – 5, Sector No. 23, GIDA,
Town / VillageSahjanwa / Sahbajganj & Domharmaphi
State of the projectUttar Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Uttar PradeshGorakhpurSahjanwa
10.
Nearest railway station along with distance in kms Gorakhpur Railway Station, 18.06 km
Nearest airport along with distance in kms Gorakhpur Airport, 25.016 km
11. Nearest Town/City/District Headquarters along with distance in kms Gorakhpur , 13.876 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gorakhpur Nagar Nigam Town Hall, Gorakhpur, Uttar Pradesh 273001
13. Name of the Applicant Navneet
14. Registered Address Plot No. AL – 5, Sector No. 23, GIDA Industrial estate, Vill- Sahbajganj & Domharmaphi Tehsil – Sahajanwa District- Gorakhpur (U.P)
15.
Address for correspondance:
Name of the Company GALLANTT ISPAT LIMITED
Name of the Applicant Navneet
Designation (Owner/ Partner/ CEO) Manager Commercial
Pin code 273209
E-mail gallanttispatlimited1@gmail.com
Telephone No. 00-000
Fax No. 00-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Land is already industrial. Additional 5.90 Hectare land will be proposed for expansion which is already under possession and industrial in land use.
1.2 Clearance of existing land, vegetation and buildings? No Land is already industrial. Additional 5.90 Hectare land will be proposed for expansion which is already under possession and industrial in land use.
1.3 Creation of new land uses? No Land is already industrial.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Raw Water Characteristics: pH:7.5; Total dissolved solids (TDS): 242.8 mg/l.
1.5 Construction works? Yes Foundation of Plant and Machinery, Sheds, utilities , Plant and Building etc.
1.6 Demolition works? No Not required for proposed expansion
1.7 Temporary sites used for construction works or housing of construction workers? Yes Construction workers shall be housed temporarily at the proposed site, for which temporary shelters shall be created.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Cut , fill or excavation will be done making for Sheds, Utilities & Plant netc.
1.9 Underground works including mining or tunnelling? No Only Foundation
1.10 Reclamation works? No None
1.11 Dredging? No None
1.12 Offshore structures? No None
1.13 Production and manufacturing processes? Yes It is an Integrated Steel plant kindly refer Detailed Project Report and PFR.
1.14 Facilities for storage of goods or materials? Yes Sheds are Available, for expansion additional will be constructed.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Industrial Waste water : Will be treated in ETP and 100 % recycling shall be done. Domestic Waste water: is being treated in STP and after expansion, same will be utilized. Solid waste : Fly ash shall be used in road making and sold to the cement industry. Municipal Solid waste : 350 kg / Day will be treated and disposed through Organic waste converter.
1.16 Facilities for long term housing of operational workers? Yes Housing facilities are available for long term housing of operational workers.
1.17 New road, rail or sea traffic during construction or operation? No Not required
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not required
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not required
1.20 New or diverted transmission lines or pipelines? No Not required
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not required
1.22 Stream crossings? No Not required
1.23 Abstraction or transfers of water from ground or surface waters? Yes Total water requirement after proposed expansion is 6776.0 m3/Day which will meet out through existing and proposed bore well . Industrial Requirement : 6626 m3/Day Domestic Requirment : 150 m3/Day
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No Change
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Most of the personnel shall reside within the plant premises. Construction material shall be transported by road. Raw material shall be transported by road and Railways. Part of raw material required during operation shall be generated in the plant itself during the manufacturing process.
1.26 Long-term dismantling or decommissioning or restoration works? No NA
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No NA
1.28 Influx of people to an area in either temporarily or permanently? Yes For expansion additional 405 Persons will be required.
1.29 Introduction of alien species? No NA
1.30 Loss of native species or genetic diversity? No NA
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed expansion will be done in the existing industry. Additional 5.9 Hectare land is industrial as per revenue record.
2.2 Water (expected source & competing users) unit: KLD Yes Industrial requirement : 6626 m3/day Domestic requirement : 150 m3/day Total Water requirement after expansion :6776.0 m3/day. All water requirement will be meet out from existing and proposed bore wells .
2.3 Minerals (MT) Yes Iron Ore (For Sponge Iron) :66528 MTPA , Iroon Ore Fines : 883872 MTPA, Dolomite : 33660 MTPA Ferro Alloy : 7841 MTPA Coal : 578160 MTPA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Material from excavation at project site shall be used for construction. Additional construction materials like stone, aggregate, sand shall be procured from nearby areas.
2.5 Forests and timber (source – MT) No NA
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total Power requirement after expansion: 81 MW which will meet through in-house power production and State Power Corporation (for Emergency) . Fuel: Diesel : 500 Lit/Day (DG Backup Only), Coal : 214500 MTPA, Rice Husk :35244 MTPA, Char : 80190 MTPA
2.7 Any other natural resources (use appropriate standard units) No NA
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Spent oil, Used oil and oily waste shall be provided to authorized recyclers/ reprocessors.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Nil
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project shall have a positive impact, the welfare of people by generating employment opportunities.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No NA
3.5 Any other causes No NA
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable.
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic waste will be collected and Disposed of by Local Municipal Authority.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Spent oil, Used oil and oily waste shall be provided to authorized recyclers/ reprocessors.
4.4 Other industrial process wastes Yes •Dolo char (243 TPD) will be reused as raw material within the plant for power generation through AFBC boiler. •Slag (198 TPD) will be used in filling of Low lying area and in Road Making. • Total ash (350 TPD) from the Boiler and APCS will be sold for Cement manufacturing. •Total ash (20 TPD) from the Palletisation will be sold for Cement manufacturing.
4.5 Surplus product No NIL
4.6 Sewage sludge or other sludge from effluent treatment No Domestic waste water is being treated in STP of adequate capacity. After expansion same STP will be utilised.
4.7 Construction or demolition wastes No Nil
4.8 Redundant machinery or equipment No Nil
4.9 Contaminated soils or other materials No Nil
4.10 Agricultural wastes No Nil
4.11 Other solid wastes Yes •Dolo char (243 TPD) will be reused as raw material within the plant for power generation through AFBC boiler. •Slag (198 TPD) will be used in filling of Low lying area and in Road Making. • Total ash (350 TPD) from the Boiler and APCS will be sold for Cement manufacturing. •Total ash (20 TPD) from the Palletisation will be sold for Cement manufacturing.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes DRI & CPP Boiler operations shall result in emissions. With existing five stack, additional 06 stack will be constructed for expansion. Stack attach to DRI and CPP, SMS will be attached to online stack monitoring devices. Emission from the Existing as well proposed stack will be within CPCB norms. Details of Existing and Proposed Stach attached with PFR.
5.2 Emissions from production processes Yes PM10,PM 2.5, SO2, Nox, CO etc.
5.3 Emissions from materials handling including storage or transport Yes Dust emissions and fugitive emissions shall arise from raw material storage, handling and transport. The control measures shall include concrete/asphalt road construction, water sprinkling, tarpaulin cover on trucks carrying raw materials.
5.4 Emissions from construction activities including plant and equipment Yes Dust shall be generated during civil construction and movement of vehicles.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust shall be generated during civil construction and movement of vehicles. These activities shall be for a short duration and their impact shall be minimised by taking the following measures: •Water sprinkling • Use of dust arresting panels/ sheets • Regular removal of construction waste material • Proper storage of construction material • Use of cover on trucks • Speed limit for vehicles • Sewage will be treated in STP.
5.6 Emissions from incineration of waste No NA
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No NA
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise shall be generated during construction phase by construction and material handling equipment. During operation phase, noise shall be generated by the operation of machinery and Handling of raw material and finished product. Persons working in the high noise area will be provided the required earplugs & earmuffs.
6.2 From industrial or similar processes Yes During operation phase, noise shall be generated by the operation of machinery and Handling of raw material and finished product.Persons working in the high noise area will be provided the required earplugs & earmuffs. Effective Mitigation Measures shall be built in .
6.3 From construction or demolition No Noise shall be generated during construction phase by construction and material handling equipment. This shall largely be localised. Effective mitigation measures like barrier sheets, earplugs for labour etc. shall be provided.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes There will be marginal additional traffic which may not lead to any increase in the noise levels.
6.6 From lighting or cooling systems No No equipment shall be permitted to be installed in proposed expansion which generates noise level exceeding the permissible standards.
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Spent oil, Used oil and oily waste shall be provided to authorized recyclers/ reprocessors. Hazardous material will be stored in 200 Liter Drum.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage will be treated in STP and Same will be utilised. Industrial effluent: It is ZERO discharge based industry . 100 % recycling shall be Done .
7.3 By deposition of pollutants emitted to air into the land or into water No Adequate Stack height provided to all existing and proposed Stack , ESP and Bagfilter has been installed as air Pollution Control Device . Therefore No such deposition will occur. Details given in PFR.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Nil
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Adequate safety measures will be followed to control of fire. As per applicable safety regulations.
8.2 From any other causes Yes All standard safety measures shall be taken during establishment.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Zone IV Seismic Area. All necessary design considerations for earthquake resistant structures shall be incorporated in the design of the project.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The project shall lead to development and prosperity of the area by generating additional employment opportunities. Green belt development and other such activities undertaken by project proponents shall have a positive impact on the ecology of the area.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments Yes Good EHS practices and energy efficient operations.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No NA
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NIL
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes River Rapti : 4.29 km in East Direction, Other Many small pond available within 10.0 Km radius.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil
4 Inland, coastal, marine or underground waters No Nil
5 State, National boundaries No Nil
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil
7 Defence installations No Nil
8 Densely populated or built-up area Yes Sahjanwa : 2.0 Km, Gorakhpur : 20 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are many school, college, Hospital are present within 15.0 Km radius as site is near to Sahjanwa town area and Gorakhpur.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Proposed expansion site is present in high quality water source area , ground water level in the area is from 3.5 m to 5.0 m .
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Zone IV Seismic Area. All necessary design considerations for earthquake resistant structures shall be incorporated in the design of the project.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantNavneet
DesignationManager Commercial
Name of Company (Applicant Name should not be given here)GALLANTT ISPAT LIMITED
AddressPlot No. AL – 5, Sector No. 23, GIDA Industrial estate, Vill- Sahbajganj & Domharmaphi Tehsil – Sahajanwa District- Gorakhpur (U.P)
Print