APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Increase in production capacity of Asbestos Corrugated Sheets from 1,44,000 TPA to 1,95,000 TPA and installation of pre-coloured galvanized MS profile sheet plant (non-asbestos) of 25000 TPA of M/s U.P. Asbestos Ltd., Mohanlalganj, Lucknow | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/UP/IND/89104/2018 | Project Cost | 529 lacs | |
| 2. | |
S. No. in the schedule | 4(c) Asbestos milling and asbestos based products
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 195000 metric tonne Asbestos Corrugated Sheets & 25000 TPA Pre-coloured galvanized MS profile sheet (non-asbestos) ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/UP/IND/89102/2011 | MoEFCC file number(Previous EC) | J-11011 | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 144000 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Plot no.-Series 8, 6/2 and 9/2, Village-Mau, Tehsil-Mohanlalganj, District-Lucknow, State-Uttar Pradesh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Series 8 ,6/2 and 9/2 | Town / Village | Mau | State of the project | Uttar Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Aurangabad | Paithan | (2.) | Uttar Pradesh | Lucknow | Mohanlalganj | | 10. | |
Nearest railway station along with distance in kms | Mohanlalganj, 1 km | Nearest airport along with distance in kms | Chaudhary Charan Singh International Airport, 18 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Mohanlalganj , 1.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village Panchayat – Mohanlal ganj, Pradhan – Smt Sandhya Pandey, Vill. - Mau, Tehsil-Mohanlalganj, Dist.: Lucknow
Mobile:09415005562
Jila Panchyat- Shri Sunil Gautam,Vill.:Raibhankeda,Tehsil -Mohanlalganj, Dist: Lucknow | | 13. | Name of the Applicant | Sunil | | 14. | Registered Address | Mahmoodabad Estate Building, Hazratganj, Lucknow | | 15. | |
Address for correspondance: | Name of the Company | U.P. ASBESTOS LTD. | Name of the Applicant | Sunil | Designation (Owner/ Partner/ CEO) | CommercialManager | Pin code | 226001 | E-mail | upasbestos@upasbestos.com | Telephone No. | 0522-2622905 | Fax No. | 0522- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | There will be no change in land use except cotton rag pulp plant of capacity 2000 TPA and pre-coloured galvanized MS profile sheet plant (non-asbestos) of 25000 TPA capacity. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Nil | 1.3 | Creation of new land uses? | No | Nil | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Nil | 1.5 | Construction works? | No | Nil | 1.6 | Demolition works? | No | Nil | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Nil | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Nil | 1.9 | Underground works including mining or tunnelling? | No | Nil | 1.10 | Reclamation works? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | 144000 mt/year (Existing) and 195000 mt/year (proposed). Hatscheck process shall be continued for AC sheets. AC sheets, pulp and profile sheet plant details described in the prefeasibility report. | 1.14 | Facilities for storage of goods or materials? | Yes | Already available | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Major part of solid waste and liquid effluents waste is recycled back to the process. Only a small part of sludge filled in empty cement bags are dispatched to the authorized T.S.D.F i.e. U.P. Waste Management project, situated at Kanpur Dehat (U.P.). Negligible waste (approx. 45 kg per month) would be generated in profile sheet plant which will be sold off. | 1.16 | Facilities for long term housing of operational workers? | Yes | All the workers employed are locals. Though a small colony provided earlier is not required now. There is a proposal for demolition of the colony for further utilization in future. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | There is no proposal for construction of new road, rail route. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | The factory does not involve any diversion of existing transport routes or infrastructure leading to changes in traffic movements. | 1.20 | New or diverted transmission lines or pipelines? | No | The plant does not involve any new or diversion of transmission lines or pipeline | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | No stream crossings are involved. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total water requirement is 570 KLD (existing) drawn from underground for process, drinking, domestic, plantation etc. Out of which 342 KLD is the makeup water. Proposed water consumption will be 352 KLD, out of which 317 KLD will be makeup water to be extracted from bore well (s). | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There will be no effect on drainage or runoff. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | There will be increase in transport for raw material and finished product. More nos. of trucks per day will be required. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Nil | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | No | At present a total of 380 (230 direct & 150 indirect) workers including staff are employed by. U.P. Asbestos Limited. This will increase to a total of 410 (230 direct & 180 indirect). In addition there will be an increase of 5 skilled and 10 unskilled manpower for profile sheet plant making the total manpower to 425. | 1.29 | Introduction of alien species? | No | Nil | 1.30 | Loss of native species or genetic diversity? | No | Nil | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | No further land is required. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Source of water is bore wells. No other industries exist in the vicinity. | 2.3 | Minerals (MT) | No | Not applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | Nil | 2.5 | Forests and timber (source – MT) | No | Nil | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The earlier installed Steam turbine of 1.25 MW (rice husk based) shall be dismantled. Power connection from LESA for 1350 KVA has been taken. Solar power plant of 1.1 MW has been commissioned. Power required for proposed profile sheet plant and pulp processing plant would be 22.4 KW and 111.86 KW respectively which is included in the above.
DG sets of 1250 KVA, 625 KVA and 200 KVA are available as stand by arrangement. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Chrysotile Asbestos fibres, however there will be no increase in Chrysotile Asbestos Fibres. There will be increase in Ragpulp. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | Yes | Lungs and related types diseases | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Socio Economic Development | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Nil | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Nil | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | All the provisions of the Hazardous and Other Wastes (Management and Trans-boundary Movement) Rules, 2016 and its amendments are followed. | 4.4 | Other industrial process wastes | Yes | Sludge, Solids are re-used through the recycling for manufacturing of AC sheets. | 4.5 | Surplus product | Yes | Is stacked at one place and then dispatched to the consumers. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Only a small part of the sludge generated at the time of processing is disposed through T.S.D.F, U.P. Waste Management Project situated at Kanpur Dehat (U.P.) | 4.7 | Construction or demolition wastes | No | Not Applicable | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Nil | 4.10 | Agricultural wastes | No | Nil | 4.11 | Other solid wastes | No | Nil | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Use of Diesel for running of DG sets; due to plying of trucks, tractors , etc. | 5.2 | Emissions from production processes | No | Nil | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust & Asbestos Fiber emission can be anticipated from handling and transportation. | 5.4 | Emissions from construction activities including plant and equipment | No | Not applicable | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust emission due to handling of material | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Some noise can be anticipated. | 6.2 | From industrial or similar processes | No | Not Applicable | 6.3 | From construction or demolition | No | Not Applicable | 6.4 | From blasting or piling | No | No blasting is proposed. | 6.5 | From construction or operational traffic | Yes | Due to playing of more trucks | 6.6 | From lighting or cooling systems | Yes | Negligible | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | APCS are installed. A small quantity of the sludge generated is disposed through authorized T.S.D.F. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Nil | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Industrial vacuum cleaner and wet mopping is used for cleaning. | 7.4 | From any other sources | No | Nil | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Nil | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Nil | 8.2 | From any other causes | No | Nil | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Possibility is minimal.
Production is affected during the rains. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | • Improve socio-economic status of villages around the factory.
• Benefit local people due to employment.
• Improvement in educational facilities.
• Improve water conservation. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable | 9.3 | Set a precedent for later developments | Yes | Systematic timely monitoring and adoption of corrective action will avoid environmental degradation. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Nil | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Gomti river-13.5 km, North | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Nil | 4 | Inland, coastal, marine or underground waters | No | Nil | 5 | State, National boundaries | No | Nil | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Nil | 7 | Defence installations | No | Nil | 8 | Densely populated or built-up area | Yes | Mohanlalganj-1.5 Km. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | There are many primary schools, dispensaries, Hospitals, places of worship within 15km from the project site such as SGPGI (0.6 Km.), Pankaha Primary School (0.3 km), Surya Engineering College (0.4 km) etc. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Nil | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Nil | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The project lies in Seismic zone III, which is least active. | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
Undertaking |
| | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Sunil | Designation | CommercialManager | Name of Company (Applicant Name should not be given here) | U.P. ASBESTOS LTD. | Address | Mahmoodabad Estate Building, Hazratganj, Lucknow |
| |
|