APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Increase in production capacity of Asbestos Corrugated Sheets from 1,44,000 TPA to 1,95,000 TPA and installation of pre-coloured galvanized MS profile sheet plant (non-asbestos) of 25000 TPA of M/s U.P. Asbestos Ltd., Mohanlalganj, Lucknow
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/UP/IND/89104/2018
Project Cost 529 lacs
2.
S. No. in the schedule4(c) Asbestos milling and asbestos based products
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 195000 metric tonne Asbestos Corrugated Sheets & 25000 TPA Pre-coloured galvanized MS profile sheet (non-asbestos) ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/UP/IND/89102/2011
MoEFCC file number(Previous EC)J-11011
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 144000 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot no.-Series 8, 6/2 and 9/2, Village-Mau, Tehsil-Mohanlalganj, District-Lucknow, State-Uttar Pradesh
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Series 8 ,6/2 and 9/2
Town / VillageMau
State of the projectUttar Pradesh
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraAurangabadPaithan
(2.)Uttar PradeshLucknowMohanlalganj
10.
Nearest railway station along with distance in kms Mohanlalganj, 1 km
Nearest airport along with distance in kms Chaudhary Charan Singh International Airport, 18 km
11. Nearest Town/City/District Headquarters along with distance in kms Mohanlalganj , 1.5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayat – Mohanlal ganj, Pradhan – Smt Sandhya Pandey, Vill. - Mau, Tehsil-Mohanlalganj, Dist.: Lucknow Mobile:09415005562 Jila Panchyat- Shri Sunil Gautam,Vill.:Raibhankeda,Tehsil -Mohanlalganj, Dist: Lucknow
13. Name of the Applicant Sunil
14. Registered Address Mahmoodabad Estate Building, Hazratganj, Lucknow
15.
Address for correspondance:
Name of the Company U.P. ASBESTOS LTD.
Name of the Applicant Sunil
Designation (Owner/ Partner/ CEO) CommercialManager
Pin code 226001
E-mail upasbestos@upasbestos.com
Telephone No. 0522-2622905
Fax No. 0522-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There will be no change in land use except cotton rag pulp plant of capacity 2000 TPA and pre-coloured galvanized MS profile sheet plant (non-asbestos) of 25000 TPA capacity.
1.2 Clearance of existing land, vegetation and buildings? No Nil
1.3 Creation of new land uses? No Nil
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Nil
1.5 Construction works? No Nil
1.6 Demolition works? No Nil
1.7 Temporary sites used for construction works or housing of construction workers? No Nil
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Nil
1.9 Underground works including mining or tunnelling? No Nil
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Nil
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes 144000 mt/year (Existing) and 195000 mt/year (proposed). Hatscheck process shall be continued for AC sheets. AC sheets, pulp and profile sheet plant details described in the prefeasibility report.
1.14 Facilities for storage of goods or materials? Yes Already available
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Major part of solid waste and liquid effluents waste is recycled back to the process. Only a small part of sludge filled in empty cement bags are dispatched to the authorized T.S.D.F i.e. U.P. Waste Management project, situated at Kanpur Dehat (U.P.). Negligible waste (approx. 45 kg per month) would be generated in profile sheet plant which will be sold off.
1.16 Facilities for long term housing of operational workers? Yes All the workers employed are locals. Though a small colony provided earlier is not required now. There is a proposal for demolition of the colony for further utilization in future.
1.17 New road, rail or sea traffic during construction or operation? No Not Applicable
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No There is no proposal for construction of new road, rail route.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No The factory does not involve any diversion of existing transport routes or infrastructure leading to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No The plant does not involve any new or diversion of transmission lines or pipeline
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No No stream crossings are involved.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Total water requirement is 570 KLD (existing) drawn from underground for process, drinking, domestic, plantation etc. Out of which 342 KLD is the makeup water. Proposed water consumption will be 352 KLD, out of which 317 KLD will be makeup water to be extracted from bore well (s).
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no effect on drainage or runoff.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes There will be increase in transport for raw material and finished product. More nos. of trucks per day will be required.
1.26 Long-term dismantling or decommissioning or restoration works? No Nil
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? No At present a total of 380 (230 direct & 150 indirect) workers including staff are employed by. U.P. Asbestos Limited. This will increase to a total of 410 (230 direct & 180 indirect). In addition there will be an increase of 5 skilled and 10 unskilled manpower for profile sheet plant making the total manpower to 425.
1.29 Introduction of alien species? No Nil
1.30 Loss of native species or genetic diversity? No Nil
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No No further land is required.
2.2 Water (expected source & competing users) unit: KLD Yes Source of water is bore wells. No other industries exist in the vicinity.
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Nil
2.5 Forests and timber (source – MT) No Nil
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The earlier installed Steam turbine of 1.25 MW (rice husk based) shall be dismantled. Power connection from LESA for 1350 KVA has been taken. Solar power plant of 1.1 MW has been commissioned. Power required for proposed profile sheet plant and pulp processing plant would be 22.4 KW and 111.86 KW respectively which is included in the above. DG sets of 1250 KVA, 625 KVA and 200 KVA are available as stand by arrangement.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Chrysotile Asbestos fibres, however there will be no increase in Chrysotile Asbestos Fibres. There will be increase in Ragpulp.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Yes Lungs and related types diseases
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Socio Economic Development
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Nil
4.2 Municipal waste (domestic and or commercial wastes) No Nil
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes All the provisions of the Hazardous and Other Wastes (Management and Trans-boundary Movement) Rules, 2016 and its amendments are followed.
4.4 Other industrial process wastes Yes Sludge, Solids are re-used through the recycling for manufacturing of AC sheets.
4.5 Surplus product Yes Is stacked at one place and then dispatched to the consumers.
4.6 Sewage sludge or other sludge from effluent treatment Yes Only a small part of the sludge generated at the time of processing is disposed through T.S.D.F, U.P. Waste Management Project situated at Kanpur Dehat (U.P.)
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Nil
4.10 Agricultural wastes No Nil
4.11 Other solid wastes No Nil
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Use of Diesel for running of DG sets; due to plying of trucks, tractors , etc.
5.2 Emissions from production processes No Nil
5.3 Emissions from materials handling including storage or transport Yes Dust & Asbestos Fiber emission can be anticipated from handling and transportation.
5.4 Emissions from construction activities including plant and equipment No Not applicable
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust emission due to handling of material
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Some noise can be anticipated.
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition No Not Applicable
6.4 From blasting or piling No No blasting is proposed.
6.5 From construction or operational traffic Yes Due to playing of more trucks
6.6 From lighting or cooling systems Yes Negligible
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes APCS are installed. A small quantity of the sludge generated is disposed through authorized T.S.D.F.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Nil
7.3 By deposition of pollutants emitted to air into the land or into water Yes Industrial vacuum cleaner and wet mopping is used for cleaning.
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Nil
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Nil
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Possibility is minimal. Production is affected during the rains.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes • Improve socio-economic status of villages around the factory. • Benefit local people due to employment. • Improvement in educational facilities. • Improve water conservation.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments Yes Systematic timely monitoring and adoption of corrective action will avoid environmental degradation.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Nil
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Gomti river-13.5 km, North
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil
4 Inland, coastal, marine or underground waters No Nil
5 State, National boundaries No Nil
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil
7 Defence installations No Nil
8 Densely populated or built-up area Yes Mohanlalganj-1.5 Km.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are many primary schools, dispensaries, Hospitals, places of worship within 15km from the project site such as SGPGI (0.6 Km.), Pankaha Primary School (0.3 km), Surya Engineering College (0.4 km) etc.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Nil
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project lies in Seismic zone III, which is least active.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Undertaking
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSunil
DesignationCommercialManager
Name of Company (Applicant Name should not be given here)U.P. ASBESTOS LTD.
AddressMahmoodabad Estate Building, Hazratganj, Lucknow