APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s GALWALIA ISPAT UDYOG PVT LTD.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/UK/IND/93400/2019
Project Cost 4121 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 1051840 MTPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/UK/IND/93396/2019
MoEFCC file number(Previous EC)121
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 529760 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectNarain Nagar Industrial Estate, Bazpur Road, Kashipur, Udham Singh Nagar, Uttarkhand
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.29 acres land in notified industrial area (Notified by Govt. of Uttarakhand vide letter no. 1052/ID/07 – Industry/2004-05 dated 15 January 2005)
Town / VillageNarain Nagar Industrial Estate, Bazpur Road,
State of the projectUttarakhand
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)UttarakhandUdham Singh NagarKashipur
10.
Nearest railway station along with distance in kms Kashipur Railway Station, 5.5 km
Nearest airport along with distance in kms Pant Nagar Airport, 49.71 km
11. Nearest Town/City/District Headquarters along with distance in kms Kashipur , 4.53 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Tehsil Kashipur, Zilla Parishad Udham Singh Nagar
13. Name of the Applicant B
14. Registered Address Narain nagar, Industrial estate, Bazpur road, Kashipur
15.
Address for correspondance:
Name of the Company GALWALIA ISPAT UDYOG ( P ) LTD.
Name of the Applicant B
Designation (Owner/ Partner/ CEO) Director
Pin code 244713
E-mail ispatgalwalia@gmail.com
Telephone No. 0120-4151183
Fax No. 0120-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The land use of the site is industrial. Notification was issued vide order no. 1052/ID/07-Industry/ 2004-05 Dated 15.01.2005 and Order No. 817/VII-2/2015/26-Industry – 2016 Dated 27.09.2016 by Govt. of Uttarakhand respectively and Red Category industry has been allowed to be operated.
1.2 Clearance of existing land, vegetation and buildings? No Land is already available in plant premises for capacity enhancement.
1.3 Creation of new land uses? No Not applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not applicable
1.5 Construction works? Yes Drawing for additional construction work is under process.
1.6 Demolition works? No Not required
1.7 Temporary sites used for construction works or housing of construction workers? Yes The employee rest rooms are provided within the plant premises. During construction period, the manpower would be hired from nearby areas.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Proposed construction shall be carried out above ground including some excavation. Entire surplus earth shall be used within premises for leveling and development of lawns or road.
1.9 Underground works including mining or tunnelling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Proposed Capacity Enhancement Billet/Ingot 5,61,000 MTPA HSDS Bar 4,20,000 MTPA Hot Rolled Section 1,80000 MTPA Wire Rod 4,20,000 MTPA
1.14 Facilities for storage of goods or materials? Yes Company has sufficient provision for storage of raw material & finished goods.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Treatment and disposal of solid and liquid waste will be done
1.16 Facilities for long term housing of operational workers? No No facilities for long term housing of operational workers will be required
1.17 New road, rail or sea traffic during construction or operation? No Not applicable
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No The project site is already being provided with power transmission lines and water pipelines. No new diverted lines and pipelines are being proposed due to the existing project
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable, as there are no running streams across the site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes The Company is having sufficient arrangement for water requirement for drinking, sanitary, cooling tower etc. through bore well for the purpose.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During construction phase, transportation of personnel as well as well as construction materials will be involved.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Existing employment is 347 person, after proposed expansion the total direct employment potential of the existing industry would be about 500 person
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Developed Industrial Land
2.2 Water (expected source & competing users) unit: KLD Yes 400 KLD, Source–Ground Water,Bore well .
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Stone ,Aggregate ,sand construction materials
2.5 Forests and timber (source – MT) No Not applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Energy :- Existing Power Load – 41.5 MW Proposed for Expansion – 28.5 MW Total Demand - 70 MW which will met from UPCL. Standby power back (not for production) Existing DG set - 1010 KVA (1 No) Proposed DG Set – 500 KVA (2Nos) D.G. Sets to serve as an alternative source of power supply (for essential services) to this unit during emergency in case of power failure.
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Spent oil and APCS Dust are the hazardous waste generated. Spent oil shall be stored and disposed through authorized vendors.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures will be adopted in both the construction as well as operational phase. This will effectively restrict the reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Project will generate employment
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Sewage sludge
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes It will be spent oil from D.G. set (approx. 1MT/yr) which will be sold to registered recycler.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No The production will be carried out keeping in view the market demand.
4.6 Sewage sludge or other sludge from effluent treatment Yes -
4.7 Construction or demolition wastes No Not applicable
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be emission from D.G. set, transportation, and Reheating furnace. The operation of proposed project does not envisage any major air pollutant generating sources except D.G sets and vehicular movement.
5.2 Emissions from production processes Yes The main point source in the unit will be furnaces only. A compartment type bag house having 8 to 10 compartments with polyester felt filter bags is installed to comply with the emission norm from the Induction Furnace. The flue gas from furnace is being drawn through an interconnecting ductwork by induced draft fan & exhaust to the chimney. The system will meet the emission standards during operation of the plant and ensure clean plant operation. The fume exhaust hood with duct provided around
5.3 Emissions from materials handling including storage or transport Yes The fugitive emissions will be from vehicular traffic and material handling. Storage and Handing There will be insignificant fugitive emission from the storage and handling of material. Emission during the Transportation Particulate emissions occur whenever vehicles travel over a paved or unpaved road. The travel of the emission depends upon the condition of the road Exhaust gas from the vehicles During the transportation of the material, exhaust gas also contributed in the air po
5.4 Emissions from construction activities including plant and equipment Yes Only fugitive emissions will take place while carrying out the excavations. This will be minimized by spraying the water.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes This will be minimized by spraying the water.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes All equipments will be regularly lubricated and obsolete machinery / equipments will be taken out of use to minimize the noise pollution.
6.2 From industrial or similar processes Yes Major sources of noise pollution will be induction furnaces, reheating furnace, magnetic crane, & handling of product and raw material etc.
6.3 From construction or demolition Yes Some amount of noise will be generated from vehicular movement during construction and operational phase.
6.4 From blasting or piling No No blasting involved
6.5 From construction or operational traffic Yes Some amount of noise will be generated from vehicular movement during construction and operational phase. During post construction phase, to and fro movement of loading trucks and vehicles of employ will be source of noise.
6.6 From lighting or cooling systems Yes The cooling tower for cooling of induction furnace will be a source of noise during operation phase
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No There is no use of hazardous chemicals in the production process, however for power backup HSD will be required which is being stored and handle as per rules.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Waste water will not be discharged in any water body or any land depression. Waste water will be treated properly through STP and sludge will be reused within the site for plantation.
7.3 By deposition of pollutants emitted to air into the land or into water No Not applicable
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Area is earthquake prone so entire structure has been designed according to urban development ministry and National Building Code to resist the earth quake.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The Project will promote more development of the nearby area.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments No Not applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No There are some small industries operating adjoining to this industry, but their impact will be minimal.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters No Not applicable
5 State, National boundaries No The inter-state boundary (Uttarakhand- Uttar Pradesh) is 2.75 km aerially towards North from the project site
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No tourist place within the 15 Km area.
7 Defence installations No Not applicable
8 Densely populated or built-up area Yes Kashipur main city
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Radhey Hari Government P.G. College, Chandrawati Tewari Girls P. G. College, Sriram Institute of Management and Technology and Kashipur college of Education within the radius of 2 km of the project site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The area under study fall in seismic zone – IV There are no possibilities of the proposed project site getting flooded as per records available but earthquake prone.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantB
DesignationDirector
Name of Company (Applicant Name should not be given here)GALWALIA ISPAT UDYOG ( P ) LTD.
AddressNarain nagar, Industrial estate, Bazpur road, Kashipur
Print