APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed expansion of Polyurethane Foam (PU Foam) manufacturing plant at S.F. No. 88, 89/1 & 89/2, Komaranapalli village, Denkanikottai Taluk, Krishnagiri District, Tamil Nadu | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/TN/IND2/110170/2019 | Project Cost | 1526 lacs | |
| 2. | |
S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Polyurethane Foam – 1500 TPM Chipping & Bonding Foam – 200 TPM ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/TN/IND2/110169/1990 | MoEFCC file number(Previous EC) | 0000 | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 300 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | Yes | d) | Inter-State boundaries and international boundaries | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | S.F. No. 88, 89/1 & 89/2, Komaranapalli village, Denkanikottai Taluk, Krishnagiri District, Tamil Nadu | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 88, 89/1 & 89/2 | Town / Village | Komaranapalli | State of the project | Tamil Nadu | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Tamil Nadu | Krishnagiri | Hosur | | 10. | |
Nearest railway station along with distance in kms | Anekal Road, 4.1 km | Nearest airport along with distance in kms | Bengaluru International Airport, 29 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Hosur , 10 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Thali Panchayat Union
Denkanikottai Taluk
Krishnagiri Dist – 635118
Ph - 04347234226 | | 13. | Name of the Applicant | Jomi | | 14. | Registered Address | SF No. 88, Hosur - Anekal Road, Komaranapalli Village, Denkanikottai Taluk, Krishnagiri, Dist | | 15. | |
Address for correspondance: | Name of the Company | DUROFLEX PRIVATE LIMITED | Name of the Applicant | Jomi | Designation (Owner/ Partner/ CEO) | GMOperations | Pin code | 635114 | E-mail | duroflex.ec@gmail.com | Telephone No. | 080-29785510 | Fax No. | 080- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Proposed expansion will take place within the existing premises. Area required for setting up additional equipments are available within the existing premises. | 1.2 | Clearance of existing land, vegetation and buildings? | No | No clearance of existing vegetation and buildings required for the project as the expansion will take place within the existing premises. | 1.3 | Creation of new land uses? | No | No changes in existing land use. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Proposed expansion will take place within the existing premises. | 1.5 | Construction works? | Yes | Construction of new buildings will require expansion project. | 1.6 | Demolition works? | No | Not required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not required | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Additional units will be installed within the site premises for proposed production of expanded production capacity. | 1.9 | Underground works including mining or tunnelling? | No | Not required | 1.10 | Reclamation works? | No | Not required | 1.11 | Dredging? | No | Not required | 1.12 | Offshore structures? | No | Not required | 1.13 | Production and manufacturing processes? | Yes | Manufacturing process details are provided in PFR report. | 1.14 | Facilities for storage of goods or materials? | Yes | Additional storage area will be constructed as the existing storage facilities are not sufficient for after the proposed expansion of production capacity. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | No trade effluent generates from the unit. Sewage will be treated through proposed STP and used for green belt development. Cutting Foam is reused as raw materials for manufacturing of chipping & Bonding foam. | 1.16 | Facilities for long term housing of operational workers? | No | Not proposed | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not required | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not required | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not required | 1.20 | New or diverted transmission lines or pipelines? | No | Not required | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not required | 1.22 | Stream crossings? | No | Nil | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water will be sourced through private water tankers. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Raw materials & finished products are transported through road | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not required | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not required | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Not expected | 1.29 | Introduction of alien species? | No | Nil | 1.30 | Loss of native species or genetic diversity? | No | Nil | 1.31 | Any other actions? | No | Nil | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Existing land of 4.55 ha will be utilized for the proposed expansion project. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The total water requirement after the proposed expansion will increase from 5.5 KLD to 21 KLD which will be sourced from private water tankers. | 2.3 | Minerals (MT) | No | Not required | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material will be sourced from local vendors for new buildings. | 2.5 | Forests and timber (source – MT) | No | Not required | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Energy: 310 KVA (After Expansion)
DG sets : (250 KVA, 125 KVA & 82.5 KVA) (After Expansion)
Fuel: Diesel – 220 lit/day | 2.7 | Any other natural resources (use appropriate standard units) | No | Not required | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Hazardous materials like TDI (Toluene Di-isocyanate) and Amine are stored in confined
location with all safety provisions. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not Applicable | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Bio degradable waste is handed over to municipality for disposal and food waste from canteen is sent to piggery as feed and non-biodegradable & scraps are disposed through authorized venders/recyclers. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Discarded containers from purchase of hazardous materials and spent oil from DG set are disposed to authorized recyclers and Residue containing oil is being disposed to common TSDF. | 4.4 | Other industrial process wastes | Yes | Trimmed waste generated during cutting operations will be reused in manufacturing of Cutting & Bonding Foam | 4.5 | Surplus product | No | Will not arise | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | STP sludge will be used as manure in green belt development. | 4.7 | Construction or demolition wastes | No | Will not arise | 4.8 | Redundant machinery or equipment | No | Will not arise | 4.9 | Contaminated soils or other materials | No | Will not arise | 4.10 | Agricultural wastes | No | Will not arise | 4.11 | Other solid wastes | No | Will not arise | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions will arise from both,
1. Point source – DG sets operation & Foaming section.
2. Fugitive source – Vehicle movements. | 5.2 | Emissions from production processes | Yes | Emissions like VOCs will arise during production process which is being controlled by Activated Carbon filter. | 5.3 | Emissions from materials handling including storage or transport | Yes | During transfer of materials, spillages are avoided and garland drains were constructed to avoid mixing of accidental spillages with domestic waste and storm drains.
For control the fugitive emissions and VOCs, closed handling system are provided for chemicals. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Emissions (primarily dust / PM) will arise during construction. Construction activities will be confined within the plant area and spread of PM is not expected because of developed greenbelt. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Odour generated from process will be controlled by providing activated carbon filter. | 5.6 | Emissions from incineration of waste | No | No incineration proposed. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Nil | 5.8 | Emissions from any other sources | No | Nil | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Adequate measures are already in place to curtail the spread of noise. The same practice will be followed during the expansion activity. | 6.2 | From industrial or similar processes | No | Production process do not generate any noise that exceeds the Ambient Noise Standards. Acoustic enclosures are provided for DG sets | 6.3 | From construction or demolition | Yes | Commissioning works will generate noise. However, the spread of noise will be restricted through barriers. | 6.4 | From blasting or piling | No | Will not be required | 6.5 | From construction or operational traffic | Yes | There is continual movement of trucks in & out of the site. Adequate mitigation measure i.e. greenbelt & avenue plantation has been provided within the site. | 6.6 | From lighting or cooling systems | No | Will not arise | 6.7 | From any other sources | No | Will not arise | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | During transfer of materials, spillages are avoided and garland drains were constructed to avoid mixing of accidental spillages with domestic waste and storm drains.
For control the fugitive emissions and VOCs, closed handling system are provided for chemicals. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Sewage is treated in STP and used for greenbelt development. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Emissions from process division are subject to treatment with Activate carbon filter followed by stack with adequate height. All DG sets are fitted with stacks of adequate height to disperse pollutants. | 7.4 | From any other sources | No | No other sources | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Adequate containment measures have been provided. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Fire safety equipments & systems have been provided in the premises which are under periodical care & maintenance. Fire fighting trained personnel is available in the premises to operate the equipment. A centralized Fire Hydrant system has been installed for fire preparedness. The factory has been issued Fire Service License under Tamil Nadu Fire Service Rules (1990). An Emergency Preparedness and Response Manual has been prepared and put into effect within the premises. | 8.2 | From any other causes | No | Not expected to arise | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The project site is located in Seismic Zone III. Adequate safety precautions & emergency preparedness plans are already in place. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | Nil | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Nil | 9.3 | Set a precedent for later developments | No | Nil | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Nil | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Nil | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Anekal lake - 4.4 km (W)
Muthyalamaduvu - 7 km (W)
Tali Extension RF - 7.5 km (W) | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Nil | 4 | Inland, coastal, marine or underground waters | Yes | Anekal lake - 6 km (NW) | 5 | State, National boundaries | No | Karnataka – Tamil Nadu state boundary - Adjacent | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Nil | 7 | Defence installations | No | Nil | 8 | Densely populated or built-up area | Yes | Anekal - 3 km (NW) | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Government Hospital, Hosur - 9.95 km (SE)
New Baldwin International school - 3.0 km (NW)
Anekal Public school - 3.7 km (NW) | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Nil | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Nil | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project site is located in Seismic Zone III. Adequate safety precautions & emergency preparedness plans are already in place. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 22 Jul 2019 | 2. | NA | Kindly submit pre-feasibility report (PFR) of the project.
Please also inform whether SPCB has issued any show cause notice to the existing unit. | 17 Jul 2019 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Jomi | Designation | GMOperations | Name of Company (Applicant Name should not be given here) | DUROFLEX PRIVATE LIMITED | Address | SF No. 88, Hosur - Anekal Road, Komaranapalli Village, Denkanikottai Taluk, Krishnagiri, Dist |
|
|