APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Change in Product Mix of Surfactants and Pigments
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TN/IND2/100455/2019
Project Cost 100 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled S. No Products Capacity (MT/Month) Existing Proposed 1. Ultramarine Blue 200 100 300 2. Linear Alkyl Benzene Sulphonic acid – LABSA 1350 -350 1000 3. Alpha olefin Sulphonate – AOS 1000 Nil 1000 4. Synthetic detergents 4000 -2000 2000 5. Mixed Metal Oxide Pigments -- 50 50 6. Bismuth Vanadate pigments -- 50 50 7. Sodium Lauryl Ether Sulphate (SLES) or Sodium Lauryl Sulphate (SLS) -- 1500 1500 8. Specialty surfactants -- 500 500 Total 6550 -150 6400 ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 6550 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
b) Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time
8.
Does it attract the specific condition? If yes, please specify Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous typeof industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries includingproposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
(a) i. Status of the Environmental Clearance to the ProjectEC application yet to be submitted
9.
Location of the projectRanipet
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.52 & 846
Town / VillageKarai
State of the projectTamil Nadu
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Tamil NaduVelloreWallajah
10.
Nearest railway station along with distance in kms Mukundarayapuram RS, ~3.94 km towards NW direction. km
Nearest airport along with distance in kms Vellore Airport, ~27.48km km
11. Nearest Town/City/District Headquarters along with distance in kms Ranipet , 1.54 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Ranipet Municipality, Ranipet, Tamil Nadu 632401
13. Name of the Applicant Vaithyalingam
14. Registered Address Survey No: 52 & 846 Village: Karai Taluka: Walahaj District: Vellore
15.
Address for correspondance:
Name of the Company M/S. ULTRAMARINE AND PIGMENTS LIMITED
Name of the Applicant Vaithyalingam
Designation (Owner/ Partner/ CEO) FM
Pin code 632403
E-mail fm@ultramarinepigments.net
Telephone No. 04172-27850028
Fax No. 04172-278529
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There will be no change in land use as the existing land is used for industrial purpose.
1.2 Clearance of existing land, vegetation and buildings? No The proposal does not involve any additional construction or building. No, Clearance of land and vegetation.
1.3 Creation of new land uses? No There is no creation of new land uses.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not applicable
1.5 Construction works? No No construction works
1.6 Demolition works? No Nil
1.7 Temporary sites used for construction works or housing of construction workers? No Nil
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Nil
1.9 Underground works including mining or tunnelling? No Nil
1.10 Reclamation works? No Nil
1.11 Dredging? No Nil
1.12 Offshore structures? No Nil
1.13 Production and manufacturing processes? Yes The industry is involved in manufacturing of a wide range of inorganic pigments and surfactants.
1.14 Facilities for storage of goods or materials? Yes Raw materials will be stored in available storage tanks and in barrels based on the requirement.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes 1. Solid waste management S. No Waste Quantity (kg/day) Treatment / disposal method Existing Proposed After Expansion 1 Organic 45 -- 45 Vermi compositing 2 Packing materials 5 -- 5 Sent to TNPCB authorized recyclers Total 50 50 Existing man power: 250 No additional man power is proposed for the project. 2. Non Hazardous Solid waste: S. No Waste Quantity (MT/Month) Treatment / disposal method Existing Proposed After Expansion 1 Sodium Sulphate 50.7 -20.62 30.08 Reused i
1.16 Facilities for long term housing of operational workers? No Nil
1.17 New road, rail or sea traffic during construction or operation? No No new road or rail traffic is envisaged.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Nil
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Nil
1.20 New or diverted transmission lines or pipelines? No No such activities are involved in the proposed project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No such activities are involved in the proposed project.
1.22 Stream crossings? No Nil
1.23 Abstraction or transfers of water from ground or surface waters? No Existing Facility: The total water requirement is 168.4 KLD. The fresh water requirement for the existing facility is 106.9 KLD. After Expansion: The total water requirement will be 412.8. The fresh water requirement will be 329.5 Source of water: SIPCOT (Surface water)
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Nil
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes • The workforce is sourced locally who come to the factory in their own transport arrangements by road. • Raw materials and finished products are transported through trucks by road.
1.26 Long-term dismantling or decommissioning or restoration works? No Nil
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Nil
1.28 Influx of people to an area in either temporarily or permanently? No Nil
1.29 Introduction of alien species? No Nil
1.30 Loss of native species or genetic diversity? No Nil
1.31 Any other actions? No Nil
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The industry is in operation since 1975. The land document is attached as Annexure 1.
2.2 Water (expected source & competing users) unit: KLD Yes Water consumption details are given below: The existing fresh water requirement is of 106.9 KLD and the total water requirement is 168.4 KLD. After proposed expansion, the fresh water requirement is 329.5 KLD and the total water requirement is 412.8 KLD.
2.3 Minerals (MT) No Nil
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Nil No construction activities are proposed.
2.5 Forests and timber (source – MT) No Nil
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power Requirements: Details Existing Proposed After expansion Source Power requirement (KVA) 1425 - 1425 TANGEDCO D.G. back up (KVA) 725 x 2 No - 725 x 2 No -- D.G. sets will be used in case of emergency during the power failure. Fuel requirement: Details Point of use Unit Existing Proposed After expansion Coal Pigment process MT/Day 1.2 -- 1.2 Coke Pigment process 3 -- 3 SKO Pigment process Lit/Day 1200 -600 600 LPG Pigment & spray Tower Process Kg/Day 400 850 1250 H
2.7 Any other natural resources (use appropriate standard units) No Nil
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Separate storage facility is provided for the storage of raw materials and products. Chemicals are handled as per MSDS. (MSDS of Raw Materials are given as Annexure 5 and Products MSDS are given as Annexure 6).
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Nil
3.3 Affect the welfare of people e.g. by changing living conditions? No Proposed project will take place within the existing facility. Employment is provided to local people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Nil
3.5 Any other causes No Nil
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Solid Waste Generation & Management: S. No Waste Quantity (kg/day) Treatment / disposal method Existing Proposed After Expansion 1 Organic 45 -- 45 Vermi composting 2 Packing materials 5 -- 5 Sent to TNPCB authorized recyclers 3 STP sludge 0.05 - 0.05 Used as manure in green belt
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes S. N Category Type of the Hazardous waste Quantity Mode of Disposal Existing Proposed After Expansion 1 5.1 Used/ Spent oil 4.5 -- 4.5 Recover and Reuse- CPCB Authorized recyclers 2 5.2 Wastes/ residues containing oil 1.2 -- 1.2 TSDF 3 17.1 Residues, dusts or filter cakes 6 -- 6 TSDF 4 17.2 Spent catalyst (V2O5) 0.2 -- 0.2 Buy back with the suppliers 5 33.3 Discarded containers / barrels / liners contaminated with hazardous wastes /chemicals 1.2 -- 1.2 TSDF
4.4 Other industrial process wastes No No generation of process waste
4.5 Surplus product No Nil
4.6 Sewage sludge or other sludge from effluent treatment Yes STP sludge is being used in Manure in green belt area development. Sodium sulphate produced from trade effluent is treated in RO followed by MEE & VTFD and again reused in the process.
4.7 Construction or demolition wastes No Nil There is no construction and Demolition activities involved.
4.8 Redundant machinery or equipment No Nil
4.9 Contaminated soils or other materials No Nil
4.10 Agricultural wastes No Nil
4.11 Other solid wastes No Nil
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emission Sources: ? Construction phase: Nil ? Operation Phase: • DG sets which will be utilized for a short duration and during power failure scenario. Stack details are provided in Annexure7.
5.2 Emissions from production processes No • Existing: No process emission is being generated. • Proposed : No change
5.3 Emissions from materials handling including storage or transport No Raw materials are stored in closed system hence no emission during handling.
5.4 Emissions from construction activities including plant and equipment No Not Applicable
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Not envisaged.
5.6 Emissions from incineration of waste No No incineration activity involved.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No NA
5.8 Emissions from any other sources No Nil
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes • DG sets will be operated during power failure/preventive maintainace of existing DG, moreover the DG set is acoustically enclosed. • Noise pollution is being monitored regularly which is less than 75 dB(A).
6.2 From industrial or similar processes Yes Noise generating sources are D.G. sets and Process Compressors. Both are provided with Acoustic enclosures. Noise generation at source will be complied by keeping the Noise within the prescribed limits.
6.3 From construction or demolition No No new construction or demolition carried out.
6.4 From blasting or piling No No blasting or piling activities involved
6.5 From construction or operational traffic No Does not arise
6.6 From lighting or cooling systems No Nil
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes All Storages and chemicals handling areas are properly protected and strict SOP is being followed to avoid any spillages etc.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No 1. Industrial waste water is being treated in RO followed by MEE. 2. Domestic sewage is being sent to STP.
7.3 By deposition of pollutants emitted to air into the land or into water No Nil
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Nil
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Fire hydrant system is installed and safety precautions adopted as per the safety rules. Fire Hydrant layout is attached as Annexure 9.
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No • The project site falls under Seismic Zone-III (Moderate risk) • Necessary Disaster Management plans will be followed for preventing any disasters during natural / accidental calamity.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Nil
9.2 Lead to after-use of the site, which could have an impact on the environment No Nil
9.3 Set a precedent for later developments No Nil
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Nil
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Nil within 15km radius of the project boundary
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes S. No Name of the Location Distance (~km) Direction Water bodies 1 Ponnai river 4.24 W 2 Ponnai WB main canal 11.24 NW 3 Palar 3.04 WSW 4 ChannasamudramEri 13.53 SE 5 Kaveriodai 8.02 SSW 6 Mahandravadi channel 10.05 SE 7 Kaveripak main channel 10.22 SE 8 Kaveripak tank 12.52 E 9 Ponnai WB main canal 10.77 NNW 10 PundiEri 9.54 SE Reserve forest 1. Magimandalam RF 9.53 NW 2. Ammur RF 4.92 NNE 3. Tiruvalam RF 4.97 W 4. KilMinnal RF 7.86 W 5. Punganur RF 10.21 WSW 6. Pu
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil within 15 km radius from the project site
4 Inland, coastal, marine or underground waters No NA
5 State, National boundaries No Nil within 15km radius from the project site
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil within 15km radius from the project site
7 Defence installations No Nil within 15 km radius of the project boundary
8 Densely populated or built-up area Yes Ranipet is ~1.52 km towards NW direction.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Places of worships : S. No Places of worships Distance(~KM) Direction 1. Veera Anjaneyar temple Adjacent to site - 2. Vinayagar Temple 1.17 ENE 3. Lord Ganesh Temple 1.21 SE 4. Sri Muthumaariaman temple 1.20 WNW 5. SreeSanthaAnjaneyar temple 2.50 SE 6. Prithiyangaradevi temple 2.69 SE 7. Mel MaruvathurAdhiParasakthi temple 2.93 SSE 8. Neelamegaperumal temple 2.77 SE 9. Lord muniswaran temple 2.83 SE 10. Sri Padaveethamman temple 5.47 ESE 11. Venkateshwara temple 5.79 ESE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes S. No Name of the Location Distance (~km) Direction Water bodies 1 Ponnai river 4.24 W 2 Ponnai WB main canal 11.24 NW 3 Palar 5.36 WSW 4 ChannasamudramEri 13.53 SE 5 Kaveriodai 8.02 SSW 6 Mahandravadi channel 10.05 SE 7 Kaveripak main channel 10.22 SE 8 Kaveripak tank 12.52 E 9 Ponnai WB main canal 10.77 NNW 10 PundiEri 9.54 SE Reserve forest 1. Magimandalam RF 9.53 NW 2. Ammur RF 4.92 NNE 3. Tiruvalam RF 4.97 W 4. KilMinnal RF 7.86 W 5. Punganur RF 10.21 WSW 6. Pu
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Yes The project site is situated in SIPCOT industrial complex, Ranipet which is a critically polluted area. According to CPCB, the CEPI index of SIPCOT Industrial Complex, Ranipet, Vellore is 79.67 CEPI for critically polluted Industrial clusters/area is attached as Annexure 11.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project site falls under seismic zone-III according to the Indian Standard Seismic Zoning Map. However suitable seismic coefficients have been considered for building and structures design. Further it is not flood prone or landslide prone areas. Hence, no risk due to natural hazards is envisaged. Note : Seismic Zone-II : Low risk Seismic Zone-III : Moderate Risk Seismic Zone-IV : High Risk Seismic Zone-V Very high Risk
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
EDS reply for 27 march 2019
EDS letter
EDS reply for 02 July 2019
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 31 Jul 2019
2.NAPlease see that Vellore is classified as Critically Polluted Area and consideration of additional project may not be justified 02 Jul 2019
3.NAThe correction have been made as per the instruction received 26 Jun 2019
4.NAThe project being located in the Industrial area requires appraisal at the State level by the SEAC/SEIAA 03 Apr 2019
5.NAThe correction have been made as per the instruction received 02 Apr 2019
6.NAPlease provide the following information: (1) Kindly see whether the proposal falls under small unit as per the EIA Notification, 2006. (2) Whether the unit is proposed in an Industrial area? (3) Provide the copy of existing CTO/EC, if any. (4) Permission for Industrial activity, if the unit is proposed outside the Industrial area. 27 Mar 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantVaithyalingam
DesignationFM
Name of Company (Applicant Name should not be given here)M/S. ULTRAMARINE AND PIGMENTS LIMITED
AddressSurvey No: 52 & 846 Village: Karai Taluka: Walahaj District: Vellore
Print