APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Brigade Residential Development | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/TG/NCP/99506/2019 | Project Cost | 23000 lacs | |
| 2. | |
S. No. in the schedule | 8(b) Townships and Area Development projects.
| Project Sector | INFRA-1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 264946.5 Sqm ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 5.17 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Survey No. 78 & 79, Fathenagar, Balanagar Mandal, Medchal - Malkajgiri District. | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Survey No. 78, 79 | Town / Village | Fateh Nagar | State of the project | Telangana | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Telangana | Medchal | Medchal | | 10. | |
Nearest railway station along with distance in kms | Bharat Nagar, 0.4 km | Nearest airport along with distance in kms | Rajiv Gandhi International Airport, 25 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Hyderabad , 4 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Greater Hyderabad Municipal Corporation,CC Complex Tank Bund Road, Lower Tank Bund Hyderabad: 500063 | | 13. | Name of the Applicant | Abraham | | 14. | Registered Address | Survey No.78 & 79, Fateh Nagar, Balanagar Mandal, Medchal-Malkajgiri District | | 15. | |
Address for correspondance: | Name of the Company | BRIGADE ENTERPRISES LIMITED | Name of the Applicant | Abraham | Designation (Owner/ Partner/ CEO) | SVP | Pin code | 560055 | E-mail | praveenpg@brigadegroup.com | Telephone No. | 80-41379200 | Fax No. | 80- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The site area is located in Greater Hyderabad Municipal Corporation. The present land use is Residential Construction project. Presently the land is barren and is not used for any productive purpose. The proposed project shall enhance the land cover. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not Applicable | 1.3 | Creation of new land uses? | No | Not Applicable | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil testing shall be done to ascertain the Safe Bearing Capacity of the soil, for arriving at the appropriate foundation | 1.5 | Construction works? | Yes | The project is a Residential Development comprising of 1808 Dwelling Units and Retail comprising of Shops & Small Office space | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Labour Camp with basic amenities such as Sanitary Facilities, Drinking Water, First Aid Room, Provision Store etc., is set-up very close to the project site | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Not Applicable | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | No | Not Applicable | 1.14 | Facilities for storage of goods or materials? | Yes | Construction materials like cement, steel, sand, paints, aggregate etc shall be stored on site. The cement and paints are stored under covered sheds and properly secured, while materials such as aggregate shall be stored outside and covered by tarpaulin sheets. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | During construction, solid waste shall be segregated according to dry & wet waste and shall be handed over to local municipal agencies. Liquid Effluent shall be collected in Septic Tank and disposed to authorized municipal agencies | 1.16 | Facilities for long term housing of operational workers? | Yes | Facilities Management Team comprising of Technical & Non-Technical Persons shall be sourced from the local nearby area, thereby not requiring any housing facilities | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | Existing Transport & Infrastructure Facilities shall be used. | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | The domestic water requirement during occupation shall be drawn from HMWSSB. Ground water/treated wastewater if available, shall be used during construction. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Well maintained vehicles with valid emission certificates shall be used to transport the construction materials to site | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The local area is developing at a faster pace due to industrialization and commercial/ Residential development in the surrounding areas. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Undeveloped land of 5.17 Hectares | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Source of water supply is HMWSSB. Water requirement during occupation is 1285.9 KLD. During construction the water requirement is 50 KLD. The availability of water for Hyderabad city | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Cement,Sand ,Aggregate | 2.5 | Forests and timber (source – MT) | Yes | Local authorized Suppliers | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | DG sets and construction equipment shall be used during construction, which shall use mainly HSD as fuel. The energy requirement during occupation is presented in Annexure – VIII. DG sets (750 kVA X 6nos. + 500 kVA X 1 nos.) shall be used during occupation in the event of power shut down by TSTRANSCO to provide power for lifts, street lighting, common lighting and Sewaget treatment plant. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not Applicable | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project shall provide occupation facility for 1808 families. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | 5680 kg/day | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used oil: 310 l/year
Used Batteries: 15 nos. /year | 4.4 | Other industrial process wastes | No | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | 130 kg/day sludge from STP shall be reused as manure. | 4.7 | Construction or demolition wastes | No | | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions shall be only from DG sets and operated only during power shut down by TSTRANSCO. | 5.2 | Emissions from production processes | No | Not Applicable | 5.3 | Emissions from materials handling including storage or transport | No | Not Applicable | 5.4 | Emissions from construction activities including plant and equipment | Yes | Construction equipment and DG sets which mainly use Low Sulphur High Speed Diesel, as fuel shall generate emissions. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Not Applicable | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Construction activity and the construction equipment are the main sources of noise and vibration during construction. While there are no major sources of noise during occupation phase. | 6.2 | From industrial or similar processes | No | | 6.3 | From construction or demolition | Yes | NA | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | There will be an increase in the traffic density, which shall increase the noise levels of the area both during construction and occupation phases. | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not Applicable | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Not Applicable | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Not Applicable | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not Applicable | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Not Applicable | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The area is presently developing into a prime residential and commercial locality in view of the thrust given by Government of Telangana for the development of IT and ITES services. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | Yes | The surrounding areas shall develop as residential/ commercial areas which shall generate revenue to the government in the form of taxes. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not Applicable | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | The area is developing into a densely populated area due to industrialization in the surrounding areas and other major commercial developments in the vicinity. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, Schools, Places of worship and community facilities are located in the project impact area. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Abraham | Designation | SVP | Name of Company (Applicant Name should not be given here) | BRIGADE ENTERPRISES LIMITED | Address | Survey No.78 & 79, Fateh Nagar, Balanagar Mandal, Medchal-Malkajgiri District |
| |
|