APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Multi-Storied Residential Complex Project" developed by U.Venkata Sastry & Others at SYS No - 105 to 109 and 111 to 114,Village-Hafeezpet, Serilingampally Mandal & Municipal Circle-12, West Zone GHMC, Telangana
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/NCP/107808/2019
Project Cost 20214 lacs
2.
S. No. in the schedule8(b) Townships and Area Development projects.
Project Sector INFRA-1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 2,05,289.50 ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/TG/NCP/107806/2019
MoEFCC file number(Previous EC)21-22/2019-1A-III
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 145986.62 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSYS No - 105 to 109 and 111 to 114,Village-Hafeezpet, Serilingampally Mandal & Municipal Circle-12, West Zone GHMC, Telangana
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.SYS No - 105 to 109 and 111 to 114,Village-Hafeezpet, Serilingampally Mandal & Municipal Circle-12, West Zone GHMC, Telangana
Town / VillageSYS No - 105 to 109 and 111 to 114,Village-Hafeezpet, Serilingampally Mandal & Municipal Circle-12, West Zone GHMC, Telangana
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaRangareddiSerilingampalle
10.
Nearest railway station along with distance in kms Hafeezpet Railway station, 0.98 km
Nearest airport along with distance in kms Begumpet Airport, 11.7 km
11. Nearest Town/City/District Headquarters along with distance in kms Hyderabad , 18.2 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village-Hafeezpet, Serilingampally Mandal & Municipal, Circle-12, West Zone GHMC, Telangana.
13. Name of the Applicant P
14. Registered Address Flat No 8-2-120/86/9/A/1,12 & 2/13 FF, North End Banjara Hills. HYDERABAD
15.
Address for correspondance:
Name of the Company U.VENKATA SASTRY & OTHERS
Name of the Applicant P
Designation (Owner/ Partner/ CEO) AuthorizedSignatory
Pin code 500034
E-mail telanganastate2019@gmail.com
Telephone No. 040-4003862
Fax No. 040-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Land has been granted to U. Vennkata Sastry & Others for Multistoried Residential Complex Project according to Telangana Master Plan-2031. The project site is a vacant land and does not involve activity of any type. It is anticipated that the construction activities of the project would not have an adverse effect on the land use. Further, local land use planning department will control the type, density and location of development.
1.2 Clearance of existing land, vegetation and buildings? No The construction of project does not require any clearance of existing land, vegetation & building.
1.3 Creation of new land uses? No Land has been granted U. Vennkata Sastry & Others for Multistoried Residential Complex Project according to Telangana Master Plan-2031.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigation will be done during the study.
1.5 Construction works? Yes All construction activities will be confined within the project premises; there will be no physical changes outside the project boundary.
1.6 Demolition works? No Project site is vacant land. Demolition is not required.
1.7 Temporary sites used for construction works or housing of construction workers? No All the construction activity including stocking of raw materials will be confined within the project site only. No temporary labour hutments are proposed. Local labours from nearby area will be hired. Sanitation facilities will be developed at site.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Excavation will be carried out for foundation of buildings and basements. The total excavated quantity of earth material will be approx. 225151.29 m3. The excavated soil will be used in backfilling and other area development activities.
1.9 Underground works including mining or tunnelling? No No underground works including mining/ tunneling is required except excavation of earth.
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No offshore structures required.
1.13 Production and manufacturing processes? No No production/manufacturing process involved as the project is a commercial project.
1.14 Facilities for storage of goods or materials? Yes Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The solid waste generated from project will be mainly domestic in nature and the quantity of the waste will be 2,312 kg/day. During construction phase, sewage will be treated and disposed through septic tanks with soak pits. The waste water in operation phase will be treated up to tertiary level in a STP of 400 KLD capacity
1.16 Facilities for long term housing of operational workers? No Local labourers will be hired from nearby areas during construction phase. So, there will be no facilities for long-term housing of operational workers.
1.17 New road, rail or sea traffic during construction or operation? No The site has good connectivity to NH-9. Only internal roads, paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation during operational phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The site is well connected through the NH-9 which is approx. 0.89 km away from project site.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There will be no need for diversion or closure of existing traffic routes.
1.20 New or diverted transmission lines or pipelines? No There will not be any new/diverted transmission lines or pipelines around the project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses is proposed.
1.22 Stream crossings? No There are no streams running across the site.
1.23 Abstraction or transfers of water from ground or surface waters? No No Ground water extraction will be done
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Runoff will increase due to increased paved surface. However, increased runoff will be managed by well-designed rainwater harvesting system and storm water management plan.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During the construction phase, about 20-25 trucks are estimated per week. Adequate parking space within the project site for loading and unloading of materials will be provided. Adequate parking space (5,559 ECS) will be provided for operational phase within the project premises.
1.26 Long-term dismantling or decommissioning or restoration works? No No Long term dismantling or decommissioning or restoration works will be involved.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None
1.28 Influx of people to an area in either temporarily or permanently? No Local laborers from nearby area will be employed during the construction phase. In the operation phase, most of the expected occupants will be from the surrounding areas. Hence, the project will lead to a redistribution of occupants within the city. Thus, no significant influx of people is envisaged.
1.29 Introduction of alien species? No The landscaping will be carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions.
1.30 Loss of native species or genetic diversity? No There will be no significant impact on the native species or genetic diversity.
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Land has been earmarked for development of Multistoried Residential Complex Project as per Telangana Master Plan-2031.
2.2 Water (expected source & competing users) unit: KLD Yes During construction phase, total water requirement will be 410 MLD which will be provided by private water tanker. The water supply during operation phase will be met through Hyderabad Metro Politan Water Supply and Sewerage Board (HMWSSB). The total water requirement is approx. 384 KLD, out of which total domestic water requirement is 380 KLD. The fresh water requirement is approx. 266 KLD which is 70% of the domestic water demand
2.3 Minerals (MT) Yes Minerals such as sand and aggregates will be required during the construction phase
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All materials for construction will be arranged through locally selected suppliers.
2.5 Forests and timber (source – MT) No Forests and timber produce will not be required.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The total demand load is estimated at 2,842 kVA. Power will be supplied by TSSPDCL. 5 no. of DG sets of total 2,500 kVA capacity (5 × 500 kVA)
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Diesel for DG sets will be stored in drums in earmarked locations. It shall also be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures will be adopted in both the construction and operational phase such that there will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Socio-economic standard of people will increase due to increased employment opportunities provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Impacts of this type are not expected.
3.5 Any other causes No NA
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes The total municipal (domestic) solid waste to be generated is approx. 2,312 kg/day. Biodegradable waste -1,388 kg/day (Waste vegetables and foods etc.) Non-biodegradable waste-693 kg/day (Papers, cartons, thermocol, plastics, glass etc.) Inert waste -231kg/day Total 2,312 kg/day
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous wastes along with other wastes in the project will be used oil from DG sets, which is classified as per The Hazardous Waste Category 5.1 as per The Hazardous Wastes (Management & Handling) Rules, 2016. Used oil from DG sets will be stored in HDPE drums in isolated covered facility. This used oil will be sold to authorized recyclers. Suitable care will be taken so that spills/leaks of used oil from storage is avoided.
4.4 Other industrial process wastes No NA
4.5 Surplus product No NA
4.6 Sewage sludge or other sludge from effluent treatment Yes 43.49 kg/day of Sludge generated from the STP plant will be dried and later will be used as manure for green belt development.
4.7 Construction or demolition wastes Yes The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms.
4.8 Redundant machinery or equipment No Redundant machinery will not be generated.
4.9 Contaminated soils or other materials No Contaminated soils or other materials will not be generated.
4.10 Agricultural wastes Yes Landscape wastes of 0.186 kg/day will be generated.
4.11 Other solid wastes No NA
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The project does not envisage any major air pollution sources except operation of DG sets during power failure and vehicular traffic.
5.2 Emissions from production processes No No production processes involved. Hence, there will be no such emissions.
5.3 Emissions from materials handling including storage or transport Yes Small quantities of fugitive emissions are envisaged during transport and handling of construction materials. Such emissions will be temporary and controlled by the use of sprinkling and other viable techniques.
5.4 Emissions from construction activities including plant and equipment Yes This will be restricted to the construction phase and the construction site only.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is anticipated during loading and unloading of construction material and excavation of upper earth surface. These will however be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission.
5.6 Emissions from incineration of waste No No incineration of wastes is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Open burning of biomass/other material will be prohibited on site.
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise in the operational phase will be from backup DG sets (which will be in operation only during power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with standard i.e. The DG set room will be provided with acoustic enclosure to have minimum 25 dB(A) insertion loss or for meeting the ambient noise standard whichever is on higher side as per E (P) Act, GSR 371 (E) and its amendments.
6.2 From industrial or similar processes No No industrial processes will be carried out in the proposed project.
6.3 From construction or demolition Yes Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: • Concreting, mixing & operation of DG sets. • Construction plant and heavy vehicle movement.
6.4 From blasting or piling No No blasting or mechanized piling will be done.
6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt.
6.6 From lighting or cooling systems No No significant noise impact will result from lighting or cooling systems.
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The used oil from DG sets will be carefully stored in HDPE drums at isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 2016.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage will be carried out in a STP of capacity 400 KLD, proposed within the project premises. During Rainy Season and Non- Rainy Season, there will be excess of 180 KLD and 176 KLD treated wastewater respectively which would be discharged to external sewer.
7.3 By deposition of pollutants emitted to air into the land or into water No The DG Sets will be provided with stacks of adequate height. Hence dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location.
7.4 From any other sources No NA
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No NA
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes To deal with any fire related accident, fire fighting facility of single handed hydrant valve, long hose reel, and portable fire extinguisher shall be provided.
8.2 From any other causes No NA
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project falls under seismic active Zone III indicating high damage risk zone. The buildings will be designed as earthquake resistant and comply with the required IS specifications.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Appropriate infrastructure like roads, power supply, waste management and waste water treatment will be developed within the project site. Development of the area will be as per the approved Master/ Development Plan.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Anticipated
9.3 Set a precedent for later developments Yes The project will provide good infrastructure and better life style and will set an example for later developments in the areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No NA
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Kasu Brahmananda Reddy National Park - 9.10 km (SE) Mrugvani National Park - 12.97 km (S)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Kotaguda RF - 2.5 KM (D) Kazipalli RF - 8.82 km -NE Dundigal RF - 11.22 km - NE Wailal RF- 12.5 km - N Potaguda RF - 13.84 km (NNW) Kodakanchi RF - 13.95 km (NW) Kistaipalli RF - 11.45 km (NNE) Ponchanpalli Khurd RF - 13 km (NE) Ponchanpalli Kalan RF - 13.95 km (ENE) Soraram RF - 10.1 km (NE) Dulapalle RF-10.85 km (NE) Gajularamaram RF -8.45 km (NE) Boeampet RF-9.25 km (NE)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No There is no ecologically sensitive species of flora or found in the study area.
4 Inland, coastal, marine or underground waters Yes Ameenpur Lake-11 km (S) Husssain Sagar-4.2 km (NW) Osman Sagar-13.02 (ESE)
5 State, National boundaries Yes NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway- 9 - 0.89km North
7 Defence installations Yes There are no defense installations near the project site.
8 Densely populated or built-up area Yes Hyderabad – 18.2 KM SE
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Lalitha Gaytri Hospital -Approx. 0.78 km NW Pranaam Hospital -Approx. 1.35 km NW Genesis International School-Approx. 1.88 km; WNW Mandal Parishad Primary School-Approx. 1.25 km; NNW Masjid -E-Ibrahimiya-Approx. 0.80 km; E Loard Shiva Temple-Approx. 0.4 km; E
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Ground water - Safe category
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There are no areas within 15 km which are subjected to pollution or environmental damage.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The site falls under the zone III as per the Seismic Zone Map of India and is thus prone to high damage risk zone. Earthquakes Adequate measures will be taken during the construction of the project.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantP
DesignationAuthorizedSignatory
Name of Company (Applicant Name should not be given here)U.VENKATA SASTRY & OTHERS
AddressFlat No 8-2-120/86/9/A/1,12 & 2/13 FF, North End Banjara Hills. HYDERABAD
Print