APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Multistoried Residential Complex Project
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/NCP/107785/2019
Project Cost 21029 lacs
2.
S. No. in the schedule8(b) Townships and Area Development projects.
Project Sector INFRA-1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 232761.185 ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/TG/NCP/107784/2019
MoEFCC file number(Previous EC)21-12/2019-IA-III
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 146458.285 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSY Nos. 105-109, 111-114, Village-Hafeezpet,
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.SY Nos. 105-109, 111-114,
Town / VillageHafeezpet
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaRangareddiSerilingampalle
10.
Nearest railway station along with distance in kms Hafeezpet Railway Station, 1.15 km
Nearest airport along with distance in kms Begumpet Airport, 11.53 km
11. Nearest Town/City/District Headquarters along with distance in kms Hyderabad , 0 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Hafeezpet, Serilingampally Mandal & Municipal, Circle-12, West Zone GHMC, Telangana.
13. Name of the Applicant Raja
14. Registered Address Flat no. 8-2-120/86/9/A/1,12& 2/13, First Floor, North End, Aniketh Maja Housing Society, Road No. 2, Banjara Hills, Hyderabad
15.
Address for correspondance:
Name of the Company U. VENNKATA SASTRY AND OTHER
Name of the Applicant Raja
Designation (Owner/ Partner/ CEO) Director
Pin code 500034
E-mail talangana.complex@gmail.com
Telephone No. 040-40038621
Fax No. 040-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?Yes
StatusWildlife Clearance Under Process
MoEF file numberFP/TG/Others/4030/2019
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Land has been granted to U. Venkata Sastry & Others for Multistoried Residential Complex Project according to Telangana Master Plan-2031.
1.2 Clearance of existing land, vegetation and buildings? No The construction of project does not require any clearance of existing Land, Vegetation & Building.
1.3 Creation of new land uses? No Land has been granted to U. Venkata Sastry & Others for Multistoried Residential Complex Project according to Telangana Master Plan-2031. Also as per the License issued by DTCP, so there will be no creation of new land use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigation will be done during the study.
1.5 Construction works? Yes All construction activities will be confined within the project premises; there will be no physical changes outside the project boundary.
1.6 Demolition works? No Project site is vacant land. Demolition is not required.
1.7 Temporary sites used for construction works or housing of construction workers? Yes All the construction activity including stocking of raw materials will be confined within the project site only. No temporary labour hutments are proposed. Local labors from nearby area will be hired. Sanitation facilities will be developed at site.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Excavation is being carried out for foundation of buildings and construction of basements. The excavated soil will be used in backfilling and other area development activities.
1.9 Underground works including mining or tunnelling? No No underground works including mining/ tunneling will be undertaken except excavation of earth.
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No offshore structures required.
1.13 Production and manufacturing processes? Yes No production/manufacturing process involved as the project is an Expansion of Residential project.
1.14 Facilities for storage of goods or materials? Yes Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The total solid waste generated from residential project is estimated to be approx. 2725 kg per day (@ 0.25 kg per capita per day for office staff, operation/maintenance staff/security staff and workers and Landscape waste (@ 0.2 kg/acre/day). Solid wastes generated will be segregated into biodegradable (waste vegetables and foods etc.) and non-biodegradable (papers, cartons, thermocol, plastics, glass etc.) components and collected in separate bins. The biodegradable organic wastes will be disp
1.16 Facilities for long term housing of operational workers? No Local labourers will be hired from nearby areas during construction phase. So, there will be no facilities for long-term housing of operational workers.
1.17 New road, rail or sea traffic during construction or operation? No The project site is well connected through NH-9 which is 0.82 km (N) away from the project site. Only internal roads; paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The project site is well connected through NH-9 which is 0.82 km (N) away from the project site. Only internal roads; paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There will be no need for diversion or closure of existing traffic routes.
1.20 New or diverted transmission lines or pipelines? No There will not be any new/diverted transmission lines or pipelines around the project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses.
1.22 Stream crossings? No There are no streams running across the site.
1.23 Abstraction or transfers of water from ground or surface waters? No No Ground water extraction will be done
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Runoff will increase due to increased paved surface. However, increased runoff will be managed by well-designed rainwater harvesting system and storm water management plan.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During the construction phase, about 15-20 trucks are estimated per week. Adequate parking space nearby the project site for loading and unloading of materials will be provided. Adequate parking space of 6324 ECS will be provided for operational phase to the resident’s occupants of the premises.
1.26 Long-term dismantling or decommissioning or restoration works? No No Long term dismantling or decommissioning or restoration works will be involved.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None
1.28 Influx of people to an area in either temporarily or permanently? No Local labourers from nearby area will be employed during the construction phase. In the operation phase, most of the occupants will be from the surrounding areas. Hence, the project led to a redistribution of occupants within the city. Thus, there will be no significant influx of people was envisaged.
1.29 Introduction of alien species? No The landscaping will be carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions like Grevillea robusta, Cassia fistula, Bauhinia varieagata, etc.
1.30 Loss of native species or genetic diversity? No There will be no significant impact on the native species or genetic diversity
1.31 Any other actions? No Not Applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes License has been granted by to U. Venkata Sastry & Others for Multistoried Residential Complex Project according to Telangana Master Plan-2031.
2.2 Water (expected source & competing users) unit: KLD Yes During construction phase 465 ML treated water will be provided by Private water tanker. During operation phase, water supply will be provided through the Hyderabad Metropolitan Water Supply & Sewerage Board (HMWSSB). About 318.5 KLD of fresh water will be required during operation phase of the project.
2.3 Minerals (MT) Yes Minerals such as sand and aggregates will be required during the construction phase.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All materials for construction will be arranged through select suppliers.
2.5 Forests and timber (source – MT) No Forest products such as timber produce are not required.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The total demand load is estimated at 3343 kVA. Power will be supplied by TSSPDCL. Power backup for the Multistoried Residential Complex Project will be through 6 no. of DG sets of (6 x 500 kVA) 3000 kVA total capacity
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Diesel for DG set will be stored in closed HDPE drums in earmarked locations. It shall also be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and its further amendments.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures will be adopted in both the construction and operational phase such that there will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Socio-economic standard of people will improve due to increased direct and secondary employment opportunities provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Impacts of this type are not expected.
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be generated
4.2 Municipal waste (domestic and or commercial wastes) Yes The total solid waste to be generated is approx. 2725 kg/day.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous wastes along with other wastes in the project will be used oil from DG sets, which is classified as per The Hazardous Waste Category 5.1 as per The Hazardous Wastes (Management, Handling & Transboundary Movement) Rules, 2016. Used oil from DG set will be stored in HDPE drums in isolated covered facility. This used oil will be sold to authorized recyclers. Suitable care will be taken so that spills/leaks of used oil from storage are avoided.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment No The waste water generated from the project site will be treated in an onsite STP.
4.7 Construction or demolition wastes Yes The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms.
4.8 Redundant machinery or equipment No Redundant machinery will not be generated.
4.9 Contaminated soils or other materials No Contaminated soils or other materials will not be generated.
4.10 Agricultural wastes Yes Landscape wastes of 0.33 kg/day will be generated.
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The project does not envisage any major air pollution sources except operation of DG set during power failure and vehicular traffic.
5.2 Emissions from production processes No No production processes involved. Hence, there will be no such emissions.
5.3 Emissions from materials handling including storage or transport Yes Small quantities of fugitive emissions will be envisaged during transport and handling of materials. Such emissions will be temporary and controlled by the use of sprinkling and other viable techniques.
5.4 Emissions from construction activities including plant and equipment Yes This will be restricted to the construction phase and the construction site only.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will be anticipated during loading and unloading of construction material and excavation of upper earth surface. These will be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission.
5.6 Emissions from incineration of waste No No incineration of wastes is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Open burning of biomass/other material will be prohibited on site.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise in the operational phase will be from backup DG set (which will be in operation only during power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with standard.
6.2 From industrial or similar processes No No industrial processes will be carried out in the project.
6.3 From construction or demolition Yes Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities included the following noise generating activities: • Concreting, mixing & operation of DG set. • Construction plant and heavy vehicle movement
6.4 From blasting or piling No No blasting or mechanized piling will be done.
6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt.
6.6 From lighting or cooling systems No No significant noise impact will result from lighting or cooling systems.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The used oil from DG set will be carefully stored in HDPE drums at isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous Wastes (Management, Handling & Transboundary Movement) Rules, 2016.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There wastewater will be treated in an onsite STP and treated effluent will be reused for Flushing, Horticulture & DG Set.
7.3 By deposition of pollutants emitted to air into the land or into water No The DG Set will be provided with stack of adequate height. Hence dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes To deal with any fire related accident, fire fighting facility of single handed hydrant valve, long hose reel, and portable fire extinguisher will be provided.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The project falls under seismic active Zone III indicating Moderate damage risk zone. The building will be designed as earthquake resistant and comply with the required IS specifications.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Appropriate infrastructure like roads, power supply, waste management and sullage treatment will be developed within the project site.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Anticipated
9.3 Set a precedent for later developments Yes The project will provide good infrastructure and better life style and will set an example for later developments in the areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Kasu Brahmananda Reddy National Park - 9.35 km (SE) Mruvani National Park - 13.10 km (S)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Kotaguda RF - 2.45 km (S) Kazipalli RF - 8.81 km (NE) Dundigal RF - 11.22 km (NE) Wailal RF - 12.48 km (N) Potaguda RF - 13.76 km (NNW) Kodakanchi RF - 13.9 km (NW) Kistaipalli RF - 11.42 km (NNE) Ponchanpalli Khurd RF - 13.11 km (NE) Ponchanpalli Kalan RF - 14.01 km (NE) Soraram RF - 10.12 km (NE) Dulapalle RF - 10.93 km (ENE) Gajularamaram RF - 8.5 km (NE) Boeampet RF - 9.3km (NE) Musi River - 11 km (S) Ameenpur Lake - 4.04 km (NW) Husssain Sagar - 13.23 km (ESE) Osman Sa
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Kasu Brahmananda Reddy National Park - 9.35 km (SE) Mruvani National Park - 13.10 km (S)
4 Inland, coastal, marine or underground waters Yes Ground Water - safe category
5 State, National boundaries Yes There is no such area within 15 km of project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH-9 - 0.82 km (SE) away from the project site.
7 Defence installations No There is no such area within 15 km of project site.
8 Densely populated or built-up area Yes Hyderabad - Approx. 18.4 km SE from the project site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Lalitha Gayatri Hospital - 0.65km (NW) Pranaam Hospital - 1.2 km (NW) Genesis International School - 1.6 km (WNW) Mandal Parishad Primary School - 0.95 km (NE) Shri Chaitanya Junior College - 1.7 km (E) University of Hyderabad - 4.4 km (S) Masjid -E-Ibrahimiya - 0.96km (E) Lord Shiva Temple - 0.44 km (E)
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Ground Water - safe category
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There are no areas within 15 km which are subjected to pollution or environmental damage.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Earthquakes -The site falls under the zone III as per the Seismic Zone Map of India and is thus prone to Moderate damage risk zone. Adequate measures will be taken during the construction of the project.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRaja
DesignationDirector
Name of Company (Applicant Name should not be given here)U. VENNKATA SASTRY AND OTHER
AddressFlat no. 8-2-120/86/9/A/1,12& 2/13, First Floor, North End, Aniketh Maja Housing Society, Road No. 2, Banjara Hills, Hyderabad