APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s SITAPURAM LIMESTONE MINE OF M/S. ZUARI CEMENT LTD.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/MIN/81043/2018
Project Cost 111.2 lacs
2.
S. No. in the schedule1(a) Mining of minerals
Project Sector Non-Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 3.0 MTPA ha.
4.
New/Expansion/ModernizationModernization
Proposal NumberIA/TG/MIN/81042/2005
MoEFCC file number(Previous EC)J-11015/63/2003-IA.II(M)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 1336.03 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSITAPURAM, DONDAPADU
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.PORAM-RF-BLOCK-2
Town / VillageSITAPURAM, DONDAPADU
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaNalgondaMella cheruvu
10.
Nearest railway station along with distance in kms BONAKALLU, 50 km
Nearest airport along with distance in kms HYDERABAD, 55 km
11. Nearest Town/City/District Headquarters along with distance in kms BONAKALLU , 50 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village- Dondapadu & Revoor Panchayat- Mellacheruvu Zila Parisad- Nalgonda Local Body
13. Name of the Applicant SUSHIL
14. Registered Address AT-SITAPURAMDONDAPADU,MANDAL-MELLACHERUVU DIST-NALGONDA
15.
Address for correspondance:
Name of the Company ZUARI CEMENT LTD
Name of the Applicant SUSHIL
Designation (Owner/ Partner/ CEO) DIRECTOR
Pin code 516311
E-mail zuaricement111@gmail.com
Telephone No. 674-2552544
Fax No. 674-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Mining will be carried out as per the approved mining Scheme.
1.2 Clearance of existing land, vegetation and buildings? No The mining lease area is not cover any forest land.
1.3 Creation of new land uses? Yes Mention in clause No. 1.1 of Form 1
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geological survey and Mining Plan has been prepared after conducting different tests.
1.5 Construction works? Yes Mention in clause No. 1.5 of Form 1
1.6 Demolition works? No No demolition has been done. However open cast manual mining method will be adopted as per the mining plan.
1.7 Temporary sites used for construction works or housing of construction workers? No Local manpower will be utilized for construction work. Therefore, no housing facility at construction site.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Mining will be carried out as per the approved mining Scheme.
1.9 Underground works including mining or tunnelling? Yes Mining of lime stone is accomplished by Opencast Fully-mechanized Method.
1.10 Reclamation works? Yes At the end of Mining Scheme period i.e in 2018-19, the Work out area would be reclaimed by back-filling and plantation as per the modified Scheme of Mining.
1.11 Dredging? No NA
1.12 Offshore structures? No NA
1.13 Production and manufacturing processes? Yes Open-cast fully-mechanize (OTFM-A) method for mining of limestone with production capacity of 3.0 MTPA.
1.14 Facilities for storage of goods or materials? Yes Limestone ore will be mined and transported. Temporary to the stock yards as provided within mine lease area.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No Solid waste will be stacked at the earmarked dumping area as per the Approved Scheme of Mining. There will not be any effluents generation from the proposed unit.
1.16 Facilities for long term housing of operational workers? No As the local labours available no housing facility will be required.
1.17 New road, rail or sea traffic during construction or operation? No The site is well connected by fair weather road from Jaggyapeta. Haul roads inside mine lease area also exists. Therefore, no new road, rail or sea traffic required.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No NA
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No NA
1.20 New or diverted transmission lines or pipelines? No NA
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Yes A garland channel will be constructed around the dump to pass the rain water to the natural stream after passing through the settling tank.
1.22 Stream crossings? No NA
1.23 Abstraction or transfers of water from ground or surface waters? Yes Accumulated water are proposed to be utilized for plantation & water sprinkling.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No NA
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During construction, private tippers and trucks will be used to carry the materials. During operation excavators, compressors and jack hammers will be used.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling work will be carried in the project.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No decommissioning activity proposed.
1.28 Influx of people to an area in either temporarily or permanently? No ---
1.29 Introduction of alien species? No ---
1.30 Loss of native species or genetic diversity? No ---
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The total ML area over 770.23 ha of M.L-1 & 558.94ha of M.L-2 . And it is totally non-forest area. As the total area falls under Pvt land.
2.2 Water (expected source & competing users) unit: KLD Yes 55 m3/day for both leases (bore wells)
2.3 Minerals (MT) No NA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No --
2.5 Forests and timber (source – MT) No --
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) No --
2.7 Any other natural resources (use appropriate standard units) No --
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No hazardous chemicals will be used.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No --
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Due to this facility, living standards of surrounding people will increase. i.e., ? Work will be generated for unemployed. ? Educational facilities will be provided. ? The socio-economic benefits arising out of this project for the local people will include creation of direct and indirect jobs and consequent rise in the income levels, associated commercial and social infrastructure development.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No --
3.5 Any other causes No --
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Top Soil (BC Soil)
4.2 Municipal waste (domestic and or commercial wastes) No NIL
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No NIL
4.4 Other industrial process wastes No NIL
4.5 Surplus product No NIL
4.6 Sewage sludge or other sludge from effluent treatment No NIL
4.7 Construction or demolition wastes No NIL
4.8 Redundant machinery or equipment Yes Majority of the tippers and excavating equipments will be of the Lessee.
4.9 Contaminated soils or other materials No NIL
4.10 Agricultural wastes No NIL
4.11 Other solid wastes No NIL
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No --
5.2 Emissions from production processes Yes This open-cast fully-mechanized mining will result in generation of fugitive dust, emissions during excavation, loading, unloading activities and transportation.
5.3 Emissions from materials handling including storage or transport Yes Emission will be released from storage / handling / transport of mining material & vehicular movement only.
5.4 Emissions from construction activities including plant and equipment No --
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust arises from construction Materials will be suppressed by water sprinkling. Proper care will be taken during handling of material. During unloading of metal, water will be sprayed. Therefore no fugitive emissions will be released. The sewage generated from mine site will be properly routed to septic tank followed by soak pit.
5.6 Emissions from incineration of waste No ---
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No ---
5.8 Emissions from any other sources No ---
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Drilling, Blasting, Movement of heavy earth moving vehicle.
6.2 From industrial or similar processes No --
6.3 From construction or demolition No --
6.4 From blasting or piling No Dumpers are fitted with Big Cam Engine Which produce less sound. Regular maintained of machinery.
6.5 From construction or operational traffic No --
6.6 From lighting or cooling systems No ---
6.7 From any other sources No ---
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No hazardous materials will be used except explosives during Controlled blasting which will be done with all precautions.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes The domestic wastewater will be disposed to septic tank followed by soak pit.
7.3 By deposition of pollutants emitted to air into the land or into water No --
7.4 From any other sources No NIL
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No It is only mining site. The only emission is in the form of fugitive dust during excavation and it will be suppressed by water sprinkling. No fuel burning will occur.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes No hazardous materials will be used except explosives during Controlled blasting which will be done with all precautions.
8.2 From any other causes No ---
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No ---
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes All out development of surrounding by construction of houses for labourers.
9.2 Lead to after-use of the site, which could have an impact on the environment No The mining area will be back-filled and reclaimed after mining is completely over. No impact will occur.
9.3 Set a precedent for later developments No ---
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No ---
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NIL
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No NIL
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No NIL
4 Inland, coastal, marine or underground waters No NIL
5 State, National boundaries No NIL
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes The site is well connected by fair weather road. Haul roads inside mine lease area also exists.
7 Defence installations No NIL
8 Densely populated or built-up area No ---
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals and schools are available in Dondapaddu villages.Panchyat Primary schools are there at Dondapaddu. Lot of Churches & Temples are there in the surrounding area.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No --
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No --
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The proposed project area comes under Seismic Zone-II i.e Least Active zoneprone to earthquakes. Reference: Seismic Zone Map of India.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5Uploaded Approval of mining PlanAnnexure-Uploaded Approval of mining plan
Additional Attachments, if any
Attached File
ADS Letter
ADS Letter
ADS Letter
ADS Letter
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 17 Nov 2018
2.NAPP has applied for grant of TOR for two leases. PP is requested to submit the application lease-wise. 02 Nov 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Raise LetterDeferred 14 Aug 2019
2.NA

Deferred

17 Jul 2019
3. ADS Reply LetterSubmission of information in respect of M/s Zuari Cement Ltd, Sitapuram Limestone Mine (ML-1 & ML-2 ) File No. IA- J- 11015/01/2019-IA.II (M) desired by EAC & also submission of Form-1 & PFR. 27 Mar 2019
4. ADS Raise LetterThe proposal was placed in 1st EAC Meeting held during January 22-23, 2019 wherein the Committee deferred the proposal as the PP did not attend the meeting. The Committee is of the view that PP should submit the requisite information viz. complete details pertaining to mining lease (initial grant, transfer of mining lease, renewal of mining lease, validity of mining lease as on date), Past production details since the inception of mine duly authenticated from DMG, copy of CTO and CTE, comparative of all the figures ( waste, O.B., land use, water requirement, etc.) mentioned in the previous EC and what is proposed now, details of any modification/expansion/amendment/change of scope of work/method of mining etc. if any carried out after grant of EC, any corrigendum/ amendment in EC granted by MoEF&CC. In addition to this the Committee observed that area of mining lease is mentioned as 1336.03 Ha In the Form-1 but EC uploaded in the Form 1 is for the mining lease having area of 777.09 Ha. Thus, PP is requested to provide the complete justification in this regard with supporting documents. The information sought by Committee needs to be submitted within one month. 25 Mar 2019
5. ADS Raise LetterThe proposal was placed in 1st EAC Meeting held during January 22-23, 2019 wherein the Committee deferred the proposal as the PP did not attend the meeting. The Committee is of the view that PP should submit the requisite information viz. complete details pertaining to mining lease (initial grant, transfer of mining lease, renewal of mining lease, validity of mining lease as on date), Past production details since the inception of mine duly authenticated from DMG, copy of CTO and CTE, comparative of all the figures ( waste, O.B., land use, water requirement, etc.) mentioned in the previous EC and what is proposed now, details of any modification/expansion/amendment/change of scope of work/method of mining etc. if any carried out after grant of EC, any corrigendum/ amendment in EC granted by MoEF&CC. In addition to this the Committee observed that area of mining lease is mentioned as 1336.03 Ha In the Form-1 but EC uploaded in the Form 1 is for the mining lease having area of 777.09 Ha. Thus, PP is requested to provide the complete justification in this regard with supporting documents. The information sought by Committee needs to be submitted within one month. 25 Mar 2019
6.NAThe proposal was placed in 1st EAC Meeting held during January 22-23, 2019 wherein the Committee deferred the proposal as the PP did not attend the meeting. The Committee is of the view that PP should submit the requisite information viz. complete details pertaining to mining lease (initial grant, transfer of mining lease, renewal of mining lease, validity of mining lease as on date), Past production details since the inception of mine duly authenticated from DMG, copy of CTO and CTE, comparative of all the figures ( waste, O.B., land use, water requirement, etc.) mentioned in the previous EC and what is proposed now, details of any modification/expansion/amendment/change of scope of work/method of mining etc. if any carried out after grant of EC, any corrigendum/ amendment in EC granted by MoEF&CC. In addition to this the Committee observed that area of mining lease is mentioned as 1336.03 Ha In the Form-1 but EC uploaded in the Form 1 is for the mining lease having area of 777.09 Ha. Thus, PP is requested to provide the complete justification in this regard with supporting documents. The information sought by Committee needs to be submitted within one month. 25 Mar 2019
7.NAThe Committee deferred the proposal as the PP did not attend the meeting. The Committee is of the view that PP should submit the requisite information viz. complete details pertaining to mining lease (initial grant, transfer of mining lease, renewal of mining lease, validity of mining lease as on date), Past production details since the inception of mine duly authenticated from DMG, copy of CTO and CTE, comparative of all the figures ( waste, O.B., land use, water requirement, etc.) mentioned in the previous EC and what is proposed now, details of any modification/expansion/amendment/change of scope of work/method of mining etc. if any carried out after grant of EC, any corrigendum/ amendment in EC granted by MoEF&CC. In addition to this the Committee observed that area of mining lease is mentioned as 1336.03 Ha In the Form-1 but EC uploaded in the Form 1 is for the mining lease having area of 777.09 Ha. Thus, PP is requested to provide the complete justification in this regard with supporting documents. The information sought by Committee needs to be submitted within one month. 25 Mar 2019
8.NAThe Committee deferred the proposal as the PP did not attend the meeting. The Committee is of the view that PP should submit the requisite information viz. complete details pertaining to mining lease (initial grant, transfer of mining lease, renewal of mining lease, validity of mining lease as on date), Past production details since the inception of mine duly authenticated from DMG, copy of CTO and CTE, comparative of all the figures ( waste, O.B., land use, water requirement, etc.) mentioned in the previous EC and what is proposed now, details of any modification/expansion/amendment/change of scope of work/method of mining etc. if any carried out after grant of EC, any corrigendum/ amendment in EC granted by MoEF&CC. In addition to this the Committee observed that area of mining lease is mentioned as 1336.03 Ha In the Form-1 but EC uploaded in the Form 1 is for the mining lease having area of 777.09 Ha. Thus, PP is requested to provide the complete justification in this regard with supporting documents. The information sought by Committee needs to be submitted within one month. 25 Mar 2019
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSUSHIL
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)ZUARI CEMENT LTD
AddressAT-SITAPURAMDONDAPADU,MANDAL-MELLACHERUVU DIST-NALGONDA
Print