APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | M/s Sri Anjaneya Waddera Balaheena Vargamula Labour Contract Co-Operative Society LTD | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/TG/MIN/106618/2019 | Project Cost | 20 lacs | |
| 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Non-Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 42290 ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 1.31 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Kannala Village, Kamanpur Mandal, Peddapally District, Telangana State | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Survey No: 493 | Town / Village | Kannala Village, Kamanpur Mandal, Peddapally District, Telangana State | State of the project | Telangana | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Telangana | Peddapalli | Peddapalle | | 10. | |
Nearest railway station along with distance in kms | Raghavapuram, 2 km | Nearest airport along with distance in kms | Shamshabad, 228 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Peddapally , 10.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Survey No: 493 Kannala Village, Kamanpur Mandal, Peddapally District, Telangana State | | 13. | Name of the Applicant | Sri | | 14. | Registered Address | Sy.No 493, Kannala Village, Kamanpur Mandal, Peddapally District | | 15. | |
Address for correspondance: | Name of the Company | M/S SRI ANJANEYA WADDERA BALAHEENA VARGAMULA LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD | Name of the Applicant | Sri | Designation (Owner/ Partner/ CEO) | Partner | Pin code | 505184 | E-mail | buildingstoneroadmetals@gmail.com | Telephone No. | 040-65552250 | Fax No. | 040- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The mine lease area of 1.31 ha is an undulating mound of 3m height using for mining activity. The method of mining is opencast Semi
Mechanized method | 1.2 | Clearance of existing land, vegetation and buildings? | No | The land area is an undulating mound with BUILDING STONE & ROAD METAL. Lease deed executed and work orders issued by Department of Mines and Geology. | 1.3 | Creation of new land uses? | No | Not required | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Survey completed – Mine office, temporary rest shelters, first aid shed and toilets to workers are constructed. No major construction will be done. | 1.5 | Construction works? | Yes | Temporary sheds will be constructed as rest shelter for labor and for office use. | 1.6 | Demolition works? | No | Not required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | People from the nearby villages will be employed, no housing is required. Temporary rest shelter will be provided. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Above ground building for the temporary mining office. No major excavation activity is involved | 1.9 | Underground works including mining or tunnelling? | No | The proposed mining activity is open cast method with the help of drilling for blast holes, after blasting the mineral will be loaded into tippers. No underground works or tunneling required. | 1.10 | Reclamation works? | Yes | After completion of mining workings, the pits Can Developed as Reservoir ca devolved for aqua culturing. | 1.12 | Offshore structures? | No | NA | 1.13 | Production and manufacturing processes? | Yes | Opencast semi mechanised method of mining proposed to extract Building Stone & Road Metal- 42,290 M3per annum | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary stock yard will be maintained. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | NA | 1.16 | Facilities for long term housing of operational workers? | No | Temporary rest shelters to workers shall be constructed. No long term housing required. People from the nearby villages will be employed. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Building Stone & Road Metals loaded into 10 ton tippers by manual loading and transported to the consumers industries by their trucks . | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Connecting Roads are sufficient for the mining activities.
No new rail line is required.
Sea traffic is not applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | NA | 1.20 | New or diverted transmission lines or pipelines? | No | NA | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | The proposed method of mining is opencast on the slope of a mound. | 1.22 | Stream crossings? | No | NA | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water shall be drawn from local village through tankers. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | The proposed method of mining is open cast method. The ground water availability at a depth of 35-50m BGL and the mine workings are confined to a depth of 10m from surface. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Local villagers shall be employed for construction and operation. Building Stone & Road Metal produced from the mine will be transported through tippers. The numbers of trips will be 3 per day. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | NA | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Office and rest shelter will only be constructed with temporary structures. No impact will be there while decommissioning | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Mining requires 21 employees. People from the nearby villages will be employed. | 1.29 | Introduction of alien species? | No | None | 1.30 | Loss of native species or genetic diversity? | No | Ecologically the area of the mine is very small and no specific habitat existing for important species. There is no major requirement of cutting vegetation and no major loss to biomass. | 1.31 | Any other actions? | No | NA | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | The mine lease area of 1.31 ha, is located aSurvey No: 493 Kannala Village, Kamanpur Mandal, Peddapally District, Telangana State . The topography of the area is mound. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water required for the proposed mine will be 5.0 KLD, which shall be drawn from local villages through tankers | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | NA | 2.5 | Forests and timber (source – MT) | No | NA | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | No | Power required for the office and mining operations shall be drawn from nearby village, supply from grid. Mining operations would be semi mechanized open cast method. | 2.7 | Any other natural resources (use appropriate standard units) | No | None | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | There is no usage of Hazardous substances or materials to human health or the environment. However drilling and smooth blasting is required if hard ore occurred. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | NA | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | The proposed project shall enhance the prospects of employment. Recruitment of the unskilled and semiskilled workers for the proposed project will be from the nearby villages | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | The nearest village is Boddaguttapally which is at a distance of 0.5 km,No Harm to nearest village | 3.5 | Any other causes | No | None | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | No Overburden | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Domestic waste septic tank fallowed by soak pit | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | WASTE USED OIL, WILL BE STORED IN BARELL AND SENT TO AUTHORISED RE PROCESING UNIT | 4.4 | Other industrial process wastes | No | None | 4.5 | Surplus product | No | None | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | DOMESTIC WASTE WILL BE SENT SEPTIC TANK FALLOWED BY SOAK PIT | 4.7 | Construction or demolition wastes | No | None | 4.8 | Redundant machinery or equipment | No | None | 4.9 | Contaminated soils or other materials | No | None | 4.10 | Agricultural wastes | No | None | 4.11 | Other solid wastes | No | None | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | None | 5.2 | Emissions from production processes | Yes | Dust emissions are mitigated by water spraying which arise from mining, and transport activity. | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust may rise during mining, and transport. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust may rise during transport of material and mining activity. The dust emissions shall be mitigated by water spraying. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | None | 5.6 | Emissions from incineration of waste | No | None | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | Yes | Emission from DG set | 5.8 | Emissions from any other sources | No | None | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise is anticipated during mining activity from drilling, blasting and transport vehicles. The protective noise reducing gear like earmuffs will provide to the workers. | 6.2 | From industrial or similar processes | No | None | 6.3 | From construction or demolition | No | No major construction involves in mining activity. | 6.4 | From blasting or piling | Yes | Dust and noise may rise during blasting. Muffed blasting will be practiced | 6.5 | From construction or operational traffic | No | The increased traffic shall not have any significant impact. | 6.6 | From lighting or cooling systems | No | None | 6.7 | From any other sources | No | None | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The product is a mineral. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Septic Tank followed by soak pit shall be provided for temporary toilets. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | None | 7.4 | From any other sources | No | None | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | None | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | None | 8.2 | From any other causes | No | None | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | None | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The proposed project shall enhance the prospects of employment. Recruitment of the unskilled and semiskilled workers for the proposed project will be from the nearby villages. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | None | 9.3 | Set a precedent for later developments | No | None | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | The baseline environmental status of the surrounding areas is within the prescribed limits as observed from the secondary data. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Raginedu Cheruvu 1.85 Kms, Ranapur Lake at 4.00 Kms, Brahmanapalle Kunta at 2.92 Kms and Some Unnamed Water Bodies are Present with in 5Km Radius from QLA Nearest , No impact to these water bodys | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | No | None | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | No | None | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | None Boddaguttapally is at 0.5 km | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None Raginedu Cheruvu 1.85 Kms, Ranapur Lake at 4.00 Kms, Brahmanapalle Kunta at 2.92 Kms and Some Unnamed Water Bodies are Present with in 5Km Radius from QLA Nearest | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | NA | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Sri | Designation | Partner | Name of Company (Applicant Name should not be given here) | M/S SRI ANJANEYA WADDERA BALAHEENA VARGAMULA LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD | Address | Sy.No 493, Kannala Village, Kamanpur Mandal, Peddapally District |
| |
|