APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s JAGRITI STEEL PRIVATE LIMITED
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/IND/85758/2018
Project Cost 300 lacs
2.
S. No. in the schedule5(k) Induction/arc furnaces/cupola furnaces 5TPH or more
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 180 TPD/7.02 Acres ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 70 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectSurvey. No. 563 & 566, Veerlapally Village, Kothur Mandal, Rangareddy District, Telangana state
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Survey No. 563, 566
Town / VillageVeerlapally Village, Kothur Mandal
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaRangareddiShamshabad
10.
Nearest railway station along with distance in kms Sadashivapet Rd Rail Way Station, 25 km
Nearest airport along with distance in kms Rajiv Gandhi International Airport, Shamshabad, Hyderabad, 33 km
11. Nearest Town/City/District Headquarters along with distance in kms Kothur , 11.9 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Veerlapally Panchayat Name of the Panchayat Secretary: Smt.Mohana Kumari Name of the Regular Gram Panchayat: Teegapoor Zilla panchayat: Rangareddi Kothur Mandal State: Telangana Phone No. 9032427108
13. Name of the Applicant Vaishnavi
14. Registered Address SY. NO. 563 & 566, VEERLAPALLY VILLAGE, KOTHUR MANDAL.
15.
Address for correspondance:
Name of the Company JAGRITI STEEL PVT LTD
Name of the Applicant Vaishnavi
Designation (Owner/ Partner/ CEO) DIRECTOR
Pin code 500039
E-mail vaishnavi.250593@gmail.com
Telephone No. 40-27200524
Fax No. 40-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The project land is owned by the proponent Jagriti Steel Private Limited; The industry is existing with a Shed and 2 tons per hour (TPH) Induction furnace and a Re-rolling mill. The industry is now proposing production of additional 9 TPH with one more additional induction furnace in the same shed; No new or extra land will be used for the upcoming project
1.2 Clearance of existing land, vegetation and buildings? Yes The land been converted for industrial purpose; Land conversion document has been attached along with the pre-feasibility report; However, The industry is located in a industrial area (Kothur)
1.3 Creation of new land uses? No Not relevant to the proposed project; The industry is existing with a Shed and 2 tons per hour (TPH) Induction furnace and a Re-rolling mill. The industry is now proposing production of additional 9 TPH with one more additional induction furnace in the same shed; No new or extra land will be used for the upcoming project
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Various Pre-construction investigations were carried out prior to establishment of the pre-existing premises including site analysis, utilities serving site, building department, labor unions, materials and methods, Equipment, Soil testing,Climatic data, Other projects, General appraisal etc
1.5 Construction works? Yes One more additional induction furnace with a capacity of 180 TPD will be installed in the existing shed; No new land will be acquired for this purpose
1.6 Demolition works? No Not relevant to the project; There will not be need for demolition of any structure; No new land will be acquired for this purpose
1.7 Temporary sites used for construction works or housing of construction workers? No Not relevant; Local labor will be used for the civil work during installation of the new furnace; Need to hire workers from other places and to house them in temporary sites may not be needed
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes The industry is existing with a Shed and 2 tons per hour (TPH) Induction furnace and a Re-rolling mill; The industry is now proposing production of additional 9 TPH with one more additional induction furnace in the same shed
1.9 Underground works including mining or tunnelling? No Not relevant
1.10 Reclamation works? No Not relevant
1.11 Dredging? No Not relevant
1.12 Offshore structures? No Not relevant
1.13 Production and manufacturing processes? Yes Scrap/sponge iron, fluxes are melted in an Induction furnace, wherein electric current is passed through it; The scrap melts at a temperature of about 1650°C; Based upon the Composition of the molten steel, additives like ferroalloy will be added to get the requisite composition and grade of Steel; The molten material is poured into molds to produce ingots and billets; The ladle is placed over the Continuous Casting machine to cast the molten steel into required size of billets
1.14 Facilities for storage of goods or materials? Yes All goods and raw materials are stored in covered sheds
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes 20 TPD Slag is generated which is sold to Crushers. No liquid effluents are released
1.16 Facilities for long term housing of operational workers? No No housing proposal has been put forward by the industry due to lack of resources and land
1.17 New road, rail or sea traffic during construction or operation? No The industry is well connected via the Veerlapally village road; Sadasivpet is 24 km from Veerlapally. Road connectivity is there from Sadasivpet to Veerlapally and there is no proposal for new road
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Road connectivity is there from Sadasivpet to Veerlapally; Sadashivapet Rd Rail Way Station, Marpally Rail Way Station are the very nearby railway stations to Veerlapally; Rajiv Gandhi International airport in Shamshabad is the nearest airport; However, of recent there was no new transport infrastructure constructed for this area
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There is no closure or diversion of existing transport routes leading to changes in traffic movements
1.20 New or diverted transmission lines or pipelines? No There was no diversion of transmission lines or pipelines to the industry; The project doesn't require new transmission lines or pipelines because it is being planned in the pre-existing premises
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Relevant
1.22 Stream crossings? No Not Relevant
1.23 Abstraction or transfers of water from ground or surface waters? Yes 10 KLD water may be used for cooling the Coils of furnace and for general consumption
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Relevant
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Steel melting scrap, Sponge Iron & Pig Iron/Cast Irons, other raw material, finished products will be transported via private transport agencies by road with the help of trucks and lorries; The industry is well connected to the road, with a regular frequency of TSRTC buses and private transport options available for the empoyees
1.26 Long-term dismantling or decommissioning or restoration works? No Currently there are no plans to carry out long-term dismantling or restoration works in the industry premises
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not relevant
1.28 Influx of people to an area in either temporarily or permanently? No Not relevant
1.29 Introduction of alien species? No Not relevant
1.30 Loss of native species or genetic diversity? No This industry is located in the industrial area of Kothur; The pollution from the Induction furnace is only CO + CO2 of less than 1 ppm and SPM ranges from 125 to 450 µm3; It will not lead to loss of any native flora or fauna and thereby, will not effect the genetic diversity of the area too
1.31 Any other actions? No The industry is existing with 2 tons per hour (TPH) induction furnace with total production of 70 tons per day (TPD); Currently, the industry is proposing production of additional 9 TPH i.e., 180 TPD with one more additional induction furnace in the same premises
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The project is being proposed in the pre-existing industry premises; Hence there is no need to acquire or convert a new piece of land for the project
2.2 Water (expected source & competing users) unit: KLD Yes The Coils of furnace are water cooled; 20 KLD water is required and it is supplied by the Gram panchayat
2.3 Minerals (MT) No The project does not require the usage of any naturally available mineral resources
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Stone: 5 Tons, Aggregates: 10 Tons, Sand: 25 Tons, Cement 25 bags
2.5 Forests and timber (source – MT) No Not required for the project
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 5 Megawatts power is required which is supplied by Telangana power supplying agency
2.7 Any other natural resources (use appropriate standard units) No Not relevant.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The proposed project using Steel melting scrap, Sponge Iron & Pig Iron/Cast Irons and electric current to melt the iron scrap; No Hazardous substances are used throughout the process of manufacturing
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such diseased will be caused due to the presence of the proposed induction furnace, since the industry does not generate any effluents into the eco-system
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The management is fully committed to provide employment to local people. Thereby, giving them financial and social benefits and improving their quality of life
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No The industry operates with pollution control equipment and releases no/minimum effluents or harmful gases into the environment; Any of the industrial processes will not effect the local vulnerable population
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not relevant
4.2 Municipal waste (domestic and or commercial wastes) Yes Sewage is treated in the septic tank followed by a soak pit; Other domestic or commercial wastes are disposed via dust bins which are regularly cleaned by the local authorities
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Not relevant; No hazardous waste is generated
4.4 Other industrial process wastes Yes 20 Tons of slag generated will be sold to slag crusher for recovering iron for reuse & sand for brick manufacturing
4.5 Surplus product No Only the required amount of steel is produced; No surplus is stored in the premises
4.6 Sewage sludge or other sludge from effluent treatment Yes Septic tank followed by a soak pit is used to manage sewage sludge; No effluents are released by the process of manufacturing using Induction furnace
4.7 Construction or demolition wastes No There is no plan for demolition of existing structure; Even during the installation of the new furnace, minimum waste will be generated via civil work, which will be disposed off accordingly
4.8 Redundant machinery or equipment No Not relevant
4.9 Contaminated soils or other materials No Not relevant
4.10 Agricultural wastes No Not relevant
4.11 Other solid wastes No Apart from slag no other solid waste is generated
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No The proposed project operates on electric current, there is no emission due to combustion of fossil fuels
5.2 Emissions from production processes Yes The pollution from the Induction furnace is only Co + CO2 of less than 1 ppm and SPM ranges from 125 to 450 µm3; The fumes coming out of the induction furnace are controlled by a ventury wet scrubber
5.3 Emissions from materials handling including storage or transport No The finished products are steel ingots and billets; They are solid and do not give out any emissions
5.4 Emissions from construction activities including plant and equipment No The induction furnace will be installed followed by civil work for installation process; None of these will involve emission of any harmful gases into the atmosphere
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Sewage is treated via septic tank and soak pit while other general waste will not release any odour or dust and shall be disposed off appropriately
5.6 Emissions from incineration of waste No We do not plan on incinerating any waste products
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Waste will not be burnt in open air Any waste generated on regular basis will be disposed off via trash bins; Construction debris will be disposed off accordingly
5.8 Emissions from any other sources No Not relevant
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise levels are maintained below 90 dB (A)
6.2 From industrial or similar processes Yes Noise levels are maintained below 90 dB (A); Heat is generated in the induction furnace for melting the scrap. The coils of the induction furnace are cooled continuously via water cooling system
6.3 From construction or demolition Yes The new induction furnace will be installed in existing shed. Apart from the civil work no other construction is required which will be carried out between the hours of 7.30am to 6pm during weekdays
6.4 From blasting or piling No Not Relevant No blasting or piling will be carried out in the premises
6.5 From construction or operational traffic Yes The noise levels in the 10 KM radius of the site is in between 50 to 70 db (A); Heat and light emissions are also well within permissible limits
6.6 From lighting or cooling systems No Noise levels are maintained below 90 dB (A)
6.7 From any other sources No Noise levels are maintained below 90 dB (A)
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No There is no risk of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater. The project does not involve release of any such effluents into the environment. Sewage is treated with septic tank and soak pit; The pollution from the Induction furnace is only Co + CO2 of less than 1 ppm and SPM ranges from 125 to 450 µm3. The fumes coming out of the induction furnace are controlled by a ventury wet scrubber
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The project does not involve release of any effluents into the environment. Sewage is treated with septic tank and soak pit
7.3 By deposition of pollutants emitted to air into the land or into water No The pollution from the Induction furnace is only Co + CO2 of less than 1 ppm and SPM ranges from 125 to 450 µm3. The fumes coming out of the induction furnace are controlled by a ventury wet scrubber. The project does not involve release of any such effluents into the environment. Sewage is treated with septic tank and soak pit
7.4 From any other sources No Slag is generated which is completly non-hazardous; It is sold to crushers
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There is no risk of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater. The project does not involve release of any such effluents into the environment. Sewage is treated with septic tank and soak pit; The pollution from the Induction furnace is only Co + CO2 of less than 1 ppm and SPM ranges from 125 to 450 µm3. The fumes coming out of the induction furnace are controlled by a ventury wet scrubber
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No The project will not produce any hazardous waste and does not use any raw material that might be hazardous to the environment
8.2 From any other causes Yes If industry does not operate the pollution equipment, there is a risk of pollution of environment; But the industry is committed to operation of pollution control equipment regularly
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Even in case of any natural disaster, the project will not lead to any environmental damage since it does not use any hazardous material
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The project will not cause any damage to the roads or transport facility; The power supply will be obtained directly from the H.T. line, Waste water is not generated by the industry. Will not interfere with housing development and extractive and supply industries The industry is committed to operation of pollution control equipment regularly
9.2 Lead to after-use of the site, which could have an impact on the environment No There are no such plans to use the site which will cause a heavy impact on the environment
9.3 Set a precedent for later developments No Not relevant
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The project is installed with all the appropriate pollution control equipment, to curb the pollution levels from the premises. It will have minimal cumulative effects due to other existing or planned projects
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No The project is located in the industrial area of Kothur
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No No such eco-sensitive zones are near the project site
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No No such eco-sensitive zones are near the project site
4 Inland, coastal, marine or underground waters No Not relevant
5 State, National boundaries No There are no national or state boundaries within 15Kms of the proposed project
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes The project falls under the Kothur Mandal. All the villages of Kothur mandal have been declared as industrial area by the govt. of industries and commerce department there are no recreation spots nearby the industry; The road that connects to the industry in open for public access
7 Defence installations No There are no defense bases or army areas within 15KMs
8 Densely populated or built-up area No The population of veerlapally village is around 2700 and it is not densely populated because it is an industrial area
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Symbiosis Law school is 5 Kms away from the industry. The management has till date never had any complain and have always been on cordial terms; There are small temples within a radius of 15 Kms, But otherwise there are no major places of worship, community are near the industry
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not within 15 KM radius
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There is no such area within 15kms of the industry ; The such legal environmental standards have been exceeded in this area
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No There is no such sensitve area within 15 KM radius.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Process
CTO
CTO Rolling Mill
Land Conversion letter by RDO-1
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 22 Nov 2018
2.NAMay kindly refer to your application for the followings observations: 1. The instant proposal is for expansion, however the application was made as new proposal. 2. The number of points in the Form -I either incomplete or kept blank 3. The PFR is not as per the generic structure as per the OM of this Ministry dated 30.12.2010. Therefore, you are requested to submit the application duly complying the observations made above. 20 Nov 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantVaishnavi
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)JAGRITI STEEL PVT LTD
AddressSY. NO. 563 & 566, VEERLAPALLY VILLAGE, KOTHUR MANDAL.
Print