APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Ravindra khani - New Tech(RK-NT)
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/CMIN/77175/2018
Project Cost 5419 lacs
2.
S. No. in the schedule1(a) Mining of minerals
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 0.33 MTPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/TG/CMIN/77162/1991
MoEFCC file number(Previous EC)J-11015/16/88-IA.II(M)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 327.4 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectThe proposed project is located at Srirampur Village, Naspur Mandal, & Mancherial District of Telangana State. The area is covered in Survey of India Topo Sheet No. 56 N/9 and is bounded by Latitudes N 18°50'35" to N 18°52'11" and Longitudes E 79°31'21” to E 79°32'33". Srirampur, Naspur, Mancherial, Telangana.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.The area is covered in Survey of India Topo Sheet No. 56 N/9
Town / VillageSrirampur
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaAdilabadMancherial
10.
Nearest railway station along with distance in kms
Nearest airport along with distance in kms
11. Nearest Town/City/District Headquarters along with distance in kms
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given)
13. Name of the Applicant Shri G Venkateswara Reddy
14. Registered Address Kothagudem P.O -507101 Khammam Dt
15.
Address for correspondance:
Name of the Company The Singareni Collieries Company Limited
Name of the Applicant Shri G Venkateswara Reddy
Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
Pin code 507101
E-mail gm_env@scclmines.com
Telephone No. 8744-243059
Fax No. 8744-08744244115
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet
17. Whether part of Interlinked projects?
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?
22.
Whether there is any Government Order/Policy relevant/relating to the site?
23.
Whether any Forest Land Involved?
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Forest Land : 327.40 ha ( with in this Surface rights 8.96 ha ) Source : Pre-Feasibility Report
1.2 Clearance of existing land, vegetation and buildings? Yes 327.40 ha of forest land is involved in the present proposal. Vegetation was cleared at pit head structures (8.96 ha). Source : Pre-Feasibility Report
1.3 Creation of new land uses? Yes Activity wise land use is as given below.: 1.Forest Land/Undisturbed : 318.44 ha 2.Mine Entry and other Ancilliary activities/Forest land (surface right): a.Pit Head infrastructure and office 1.97 ha, b.Roads : 0.69 ha, Coal yard : 2.76 ha, d.Plantation : 3.54 ha 3. Sub-Totol (a+b+c+d) : 8.96 ha 4. Total:( 1 + 3 ) : 327.40 ha Source : Pre-Feasibility Report
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Mineral exploration investigations were made by drilling bore holes with a density of 16.84 Bore holes per Sq.km. Source : Pre-Feasibility Report
1.5 Construction works? No As the mine is being operated, residential buildings, service buildings and amenities are provided. Quarters are constructed.
1.6 Demolition works? No No demolition of structures is required. Source : Pre-Feasibility Report
1.7 Temporary sites used for construction works or housing of construction workers? No Not required, as no new constructions proposed.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No The required service buildings were already constructed above ground level. Source : Pre Feasibility Report
1.9 Underground works including mining or tunnelling? No No additional tunnels or shafts proposed.
1.10 Reclamation works? Yes plantation will be done in phased manner in an area of 8.96 ha by the end of post closure stage. Source : Pre Feasibility Report
1.11 Dredging? No Not Applicable.
1.12 Offshore structures? No Not Applicable.
1.13 Production and manufacturing processes? Yes The present proposal is to operate the project with a production capacity of 0.33 MTPA by using Board and Pillar method with SDLs. No manufacturing process is involved in producing coal. Source : Pre Feasibility Report
1.14 Facilities for storage of goods or materials? Yes The existing facilities in the area will be sufficient for the proposed project also. . Source : Pre Feasibility Report
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste: The solid waste produced during drivage of tunnels and shaft sinking will used for preparation of bank head at surface and for underground track ballasting, leveling of the uneven floors and strengthening of surface bank head.Liquid effluents: As the coal mining does not involve any chemical process, the mine discharge may contain coal fines, which will be let out into natural streams after removal of suspended solids, effluents from workshops will be treated in ETP.
1.16 Facilities for long term housing of operational workers? No Existing township is sufficient for this project requirement for housing needs of the employees. Source : Pre Feasibility Report
1.17 New road, rail or sea traffic during construction or operation? No No additional road/rail construction is required.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No change is envisaged .
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing transport routes or infrastructure.
1.20 New or diverted transmission lines or pipelines? No No new or diversion of transmission lines or pipe lines required.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No diversion is involved in the project. Source : Pre Feasibility Report
1.22 Stream crossings? No There are no stream crossings in the project. Source: Pre-Feasibility report
1.23 Abstraction or transfers of water from ground or surface waters? Yes The total make of mine water, which will be pumped out during the mining operations, is around 858.56 GPM. The same will be filtered on the surface and used for drinking and other mining operations at the pit head as well as supplied to the colonies. Source: Pre-Feasibility report
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No change is envisaged .
1.25 Transport of personnel or materials for construction, operation or decommissioning? No No change is envisaged .
1.26 Long-term dismantling or decommissioning or restoration works? Yes De commissioning as per the guidelines given by Ministry of Coal in this regard in closure plan.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes No change in the mine closure plan. The project area will be reclaimed and plantation will be carried out in phased manner. Out of 327.40 ha, un-disturbed land is 318.44 ha and plantation will be done in 8.96 ha at final mine closure stage. Service buildings will be dismantled at the end of mining operations. Source: Pre-Feasibility report
1.28 Influx of people to an area in either temporarily or permanently? Yes Influx of people will be mainly for establishing business in and around the proposed mine site. Total manpower requirement of the proposed project is1403. This manpower will either be adjusted from closing mines of SCCL or will be recruited. Source: Pre-Feasibility report
1.29 Introduction of alien species? No Nil
1.30 Loss of native species or genetic diversity? No NIl
1.31 Any other actions? No Nil
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The total land required for the project is 327.40 ha which is Forest land. Source : Pre Feasibility Report
2.2 Water (expected source & competing users) unit: KLD Yes The ground water which seeps into the mine workings will be utilized for various purposes of the project. No external source is required for the project. About 2232 KLD water will be required for different activities of the project. Out of which Mine utilization 160 KLD, Domestic use 672 KLD and Greenbelt development 1400 KLD. Source: Pre-Feasibility report
2.3 Minerals (MT) Yes Extractable (balance) coal reserves available are 2.60 MT. As on 31-03-2013. Source : Pre Feasibility Report
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No No additional infrastructure is proposed.
2.5 Forests and timber (source – MT) No No timber is required for the project as steel supports are introduced.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The source of power for the project will be from 132/33 KV substation at Mandamarri. The average consumption of power is 3.076 MW per day. Source : Pre Feasibility Report
2.7 Any other natural resources (use appropriate standard units) No Nil
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Explosives, Oils & lead acid batteries will be used in this mine. They will be stored, transported, handled and used in accordance with Indian Explosive Act 2008, MSIHC Rules 2000, Mines Act, 1952 and regulations made there under. Source: Pre-Feasibility report
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable.
3.3 Affect the welfare of people e.g. by changing living conditions? No No affect on welfare of people is anticipated.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable.
3.5 Any other causes No Not applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes The solid waste produced during drivage of tunnels, inter-seam drifts and operational stage will be used for underground track ballasting, leveling of the uneven floors and strengthening of surface bank head. Further, the rejects from mine and CHP’s will be used for laying road, filling cracks developed due to subsidence and pitching of embankments etc.
4.2 Municipal waste (domestic and or commercial wastes) No No additional domestic waste will be generated as there is no proposal for any new township.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous wastes like used oil, lead acid batteries and waste oil drums generated will be disposed as per the provisions of Hazardous Waste (Management, Handling and Trans boundary Movement) Rules 2008.
4.4 Other industrial process wastes No Nil
4.5 Surplus product No NIl
4.6 Sewage sludge or other sludge from effluent treatment No No additional sewage sludge will be generated as there is no proposal for any new township.
4.7 Construction or demolition wastes Yes Demolition at the end of the project will be carried out as per mine closure plan.
4.8 Redundant machinery or equipment No Not applicable.
4.9 Contaminated soils or other materials No Not applicable.
4.10 Agricultural wastes No Not applicable.
4.11 Other solid wastes No Not applicable.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No Not applicable.
5.2 Emissions from production processes Yes Considerable amount of dust will be generated at various stages of mining operations such as drilling, blasting, excavation, loading, transportation of coal and coal handling operations like screening, crushing. Dust respirators will be provided to the persons working in these areas.The mine exhaust air consists of the following gases CO2, O2, CH4, CO, H2 and N2.
5.3 Emissions from materials handling including storage or transport No Negligible.
5.4 Emissions from construction activities including plant and equipment No Negligible.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No NIl
5.6 Emissions from incineration of waste No NIl
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No NIl
5.8 Emissions from any other sources No NIl
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The main sources of noise in the proposed project are Surface : • Main Mechanical Ventilator(Exhaust Fan) • Pit head coal handling arrangements • Vehicular movement. Under ground : • Electrical and hydraulically operated machines. All the cabins of machines will be made sound proof and employees working in the vicinity of machines will be provided with earplugs / muffs.
6.2 From industrial or similar processes No Nil
6.3 From construction or demolition No Nil
6.4 From blasting or piling Yes Blasting operations will produce noise and vibrations but the impacts will be localized and for a short period.
6.5 From construction or operational traffic Yes During operational phase, noise levels will increase due to running of machinery but the impacts will be localized.
6.6 From lighting or cooling systems No Nil
6.7 From any other sources Yes Noise will be generated from black smith shed, tub repairing shed. Ear plugs will be provided to the persons working in these areas.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes The hazardous wastes like used oil, lead acid batteries will be disposed off to authorized recyclers.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The mining process does not involve any chemical treatment. The mine discharge water, which may contain coal fines, needs sedimentation, before discharge into the natural water course / open land. The treatment facilities such as sedimentation, filtration and chlorination will be provided for mine discharge, so as to conform to the effluent standards as prescribed by MoEF&CC. The workshop effluent, which may contain oil & grease, will be treated in oil & grease trap provided at workshop.
7.3 By deposition of pollutants emitted to air into the land or into water No Nil
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Nil
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes All the precautions as laid in CMR 2017, CEAR 2010 and Indian Explosives Act, 1884 will be followed to avoid risk from fire and explosion. Mine safety is one of the most essential aspects of working any mine. Indeed safety of the mine and the employees is taken care of by the Mines Act, 1952 and the Rules and Regulations made there under.
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No This mine has no potential dangers from floods and landslides. The experience shows earthquakes do not pose any danger to underground workings.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes As the mine is already existing, it will lead to further development of infrastructure facilities like roads, schools, recreation facilities, shopping complexes, communication facilities, housing to the dependent public, supply industries, workshops etc. which will improve the quality of life in the surrounding localities. Nil. Supply of spares & other services will come up. Nil.
9.2 Lead to after-use of the site, which could have an impact on the environment No No significant impact on the land use pattern.
9.3 Set a precedent for later developments Yes The project will lead to overall socio-economic growth of the area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Nil
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No such area exists.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No • No wet lands, coastal zone, biospheres, mountain areas exist. • Forest is involved in this mine.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No No such areas exist.
4 Inland, coastal, marine or underground waters No Not applicable.
5 State, National boundaries No No State or National boundary within 15 km from the proposed project.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No such areas exist.
7 Defence installations No No defense installations exist.
8 Densely populated or built-up area Yes Mancherial city is situated within 15 km radius from the proposed project.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are number of schools, hospitals and several places of worship and community facilities, located within an aerial distance of 15 km from the proposed mine boundary.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Except coal, no area containing important, high quality or scarce resources exist.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No such areas already subjected to pollution or environmental damage exists.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No such area susceptible to natural hazard exists.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
5Uploaded Approval of mining PlanAnnexure-Uploaded Approval of mining plan
Additional Attachments, if any
Attached File
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAThe Committee, after deliberations, desired for the EIA/EMP report based on one season baseline data along with the details in respect of the following:- • Public Consultation, including public hearing, shall be conducted through concerned SPCB as per the provisions/procedure contained in the EIA Notification, 2006 for information of the stakeholders about the present coal mining operations inviting comments and their redressal, • Valid Mining Plan and the Progressive Mine Closure Plan duly approved by the competent authority, • Compliance status of the conditions stipulated in the environmental from the concerned Regional Office of the Ministry. • Consent to operate from the State Pollution Control Board for the present mining operations. • Coal production realized from the mine from 05 Oct 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt
Print