APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed 4.0 MTPA Coal Washery at Kistaram Village, Sathupalli Mandal, Khammam District, Telangana State
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/TG/CMIN/72595/2018
Project Cost 7000 lacs
2.
S. No. in the schedule2(a) Coal washeries
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 4.0 MTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 13.03 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKistaram Village, Sathupalli Mandal, Khammam District, Telangana State
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.160/1,161/1,168,169,170,172,173...
Town / VillageKistaram village
State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaKhammamSathupalle
10.
Nearest railway station along with distance in kms Kothagudem, 42 km
Nearest airport along with distance in kms Vijayawada, 74.5 km
11. Nearest Town/City/District Headquarters along with distance in kms Bhadrachalam Road (Kothagudem) , 42 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gram Panchâyat, Village –Kistaram, Tehsil-Sattupalli, District – Khammam, Telangana
13. Name of the Applicant RAMAKRISHNA
14. Registered Address #2, First floor, Sector-8 market, R.K. Puram, New Delhi
15.
Address for correspondance:
Name of the Company GLOBAL COAL & MINING PVT. LTD
Name of the Applicant RAMAKRISHNA
Designation (Owner/ Partner/ CEO) Vicepresident
Pin code 500034
E-mail globalcoalhyd@gmail.com
Telephone No. 011-26712592
Fax No. 011-26712591
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The coal washery is proposed in an area of 13.03 ha of land. The total land is under possession of SCCL where in the same was allotted to GCMPL to operate coal washery with BOO concept.
1.2 Clearance of existing land, vegetation and buildings? No Not applicable
1.3 Creation of new land uses? No Not applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not applicable
1.5 Construction works? Yes Construction works for the proposed coal washery project
1.6 Demolition works? No Not applicable
1.7 Temporary sites used for construction works or housing of construction workers? No The workers will be from nearby area.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Excavation works will be carried out for construction of the civil foundations. Levelling /grading of land through cut and fill is required to make it suitable for construction. Structures above the ground include main plant etc.
1.9 Underground works including mining or tunnelling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Proposed throughput: 4.0 MTPA Washing technology – Batac Jig & drum washer for each circuit having 2.0 MTPA capacity
1.14 Facilities for storage of goods or materials? Yes Storage yards are provided for storage of washed coal, reject coal etc.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The slurry from the cleaning ponds will be separated and cake by the coal washery for delivering the same to the SCCL on accumulation basis and the GCMPL will transport the same to the yard designated by SCCL within a distance of around 1 km. No wastewater discharge as the wastewater generated at coal washery will be recycled in the process by the system comprising thickener and settling ponds through close circuit with zero discharge outside.
1.16 Facilities for long term housing of operational workers? No Not envisaged
1.17 New road, rail or sea traffic during construction or operation? No Not applicable
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No change in existing transport routes is envisaged.
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not envisaged
1.22 Stream crossings? No No stream crossing is involved
1.23 Abstraction or transfers of water from ground or surface waters? No The total water requirement for the proposed washery will be met from SCCL mine pit water. Water consumption will be 100 litres/tonne of raw coal feeding to plant.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Drainage of surface run-off will not be affected either during construction or during operational phase.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Rail/Road
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not envisaged
1.28 Influx of people to an area in either temporarily or permanently? Yes During construction and operational phase there will be employment opportunity for people of nearby area. Construction:250 persons Proposed: 200 persons
1.29 Introduction of alien species? No Not envisaged
1.30 Loss of native species or genetic diversity? No Not envisaged
1.31 Any other actions? No Not envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed coal washery has been planned within the lease area granted by SCCL. The land use of the site is industrial.
2.2 Water (expected source & competing users) unit: KLD Yes The water requirements for proposed coal washery will be well below the value of 0.10 cum/ ton. The total water requirement for the proposed washery will be met from SCCL mine pit water. Water consumption will be 100 litres/tonne of raw coal feeding to plant.
2.3 Minerals (MT) Yes Raw coal will be sourced from JVROCP of Sathupalli, Kothagudem area or any other mines of SCCL. Transportation of raw coal from coal mines to washery complex in the scope of SCCL.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Cement, sand, stone & steel will be sourced from the local market. Quantities will be worked during detailed engineering.
2.5 Forests and timber (source – MT) No Not envisaged
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power requirement will be around 4 units per tonne of raw coal. The HT power supply source at the required capacity & rate of supply shall be made available by SCCL at the firm’s sub-station point of the washery. The required energy meter shall be provided by SCCL in the premises of substation.
2.7 Any other natural resources (use appropriate standard units) No Not envisaged
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not envisaged
3.3 Affect the welfare of people e.g. by changing living conditions? Yes There will be more sources of income generation due to ancillary developments in the region.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged
3.5 Any other causes No Not envisaged
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Generation of domestic and commercial wastes will be negligible
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The used oil will be stored in the barrels and will be sold to the authorised recyclers available in the market.
4.4 Other industrial process wastes Yes The effluent generated during washing is treated with the help of high rate thickener, belt press and slime ponds so that zero discharge can be achieved. There will not be any solid wastes
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Organic sludge will be composted and used as manure for plantation.
4.7 Construction or demolition wastes Yes Small quantity of construction waste is expected during construction phase and the same will be used for low land filling
4.8 Redundant machinery or equipment No Not envisaged
4.9 Contaminated soils or other materials No Not envisaged
4.10 Agricultural wastes No Not envisaged
4.11 Other solid wastes No Not envisaged
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Besides fugitive dust, there will also be gaseous emissions from vehicles used for transportation of materials. There will be emissions from the standby DG sets operation for a short duration, as and when used.
5.2 Emissions from production processes Yes Mostly dust
5.3 Emissions from materials handling including storage or transport Yes Fugitive dust, which will be controlled by appropriate measures like Dry fog dust suppression system, rain guns, mobile water tankers for regular water sprinkling etc.
5.4 Emissions from construction activities including plant and equipment Yes Dust, which will be controlled by water sprinkling & other appropriate measures
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Water sprinkling on sand, road etc. to control fugitive dust. There will be no odour causing sources.
5.6 Emissions from incineration of waste No Not envisaged
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not envisaged
5.8 Emissions from any other sources No Nil
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Crusher – 85 dB(A) at a distance of one meter. Suitable lining of chutes by noise absorbing materials. Provision of ear muffs Regular maintenance of the equipment will help in reducing noise levels.
6.2 From industrial or similar processes Yes The expected noise levels will be in the range of 75-85 dB (A) at a distance of one meter.
6.3 From construction or demolition Yes Noise levels in the range of 75-95 dB (A) will be generated during construction activities at a distance of one meter.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes During construction: Temporary During operation: The noise levels are expected to be in the range of about 70-75 dB (A) at a distance of one meter.
6.6 From lighting or cooling systems No Not envisaged
6.7 From any other sources No Not envisaged
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not applicable
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The entire process waste water will be recycled in the washing circuit. Zero effluent discharge has been planned. Septic Tanks & Soak Pitswill be constructed. Sludge after digestion will be used as manure.
7.3 By deposition of pollutants emitted to air into the land or into water No Not applicable
7.4 From any other sources No Not envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Fire in the coal stock yard due to spontaneous heating. Fire fighting water hydrant lines will be installed in these areas to combat fire hazard if any.
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The proposed project site falls in zone-III as per IS 1893 (Part-I): 2002, indicating that the site is seismically stable zone. Also, the site does not fall under flood prone or landslide prone areas. Hence, negligible risk due to natural hazards is envisaged.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting and ancillary development will take place. Facilities will be developed Indirect effect, building of houses Envisaged Ancillary activities will increase Development of relatively backward areas Not envisaged
9.2 Lead to after-use of the site, which could have an impact on the environment No Not envisaged
9.3 Set a precedent for later developments Yes Small ancillary industries may develop as a consequence.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Anticipates insignificant increase in particulate matter in the ambient air.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Nil within 15 km
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water Bodies: NTRvaradaKaluva (2.0 km, E) Tammileru River (7.0 km, SE) BethupalliPeddaCheruvu (7.2 km, E) Lotuvagu (7.8 km, W) Nagarjunasagar main branch canal (9.0 km SW) Kattaleru river (9.3 km, WSW) Forest: Lankapalli RF(within the plant site – South side) Gattuguda RF (13.2 km, E) Annapureddipalli RF (12.5 km, NNE) Barrikonda RF (13.6 km, ESE)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil within 15 km
4 Inland, coastal, marine or underground waters No Nil within 15 km
5 State, National boundaries Yes SH-42 (0.3 km, NW) NH-221 (11.9 km, W)
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil within 15 km
7 Defence installations No Nil within 15 km
8 Densely populated or built-up area No Nil
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There is a hospital, school, worship places etc around 5 km from the project site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Nil within 15 km
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No There is no history of landslide and subsidence. The project site falls in Seismic Zone-III. There no major water bodies near to project site to cause flooding.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5Uploaded Approval of mining PlanN/A
Additional Attachments, if any
Attached File
EDS replies
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 08 Feb 2018
2.NA- Please inform about land use of the project site, whether permissible for the proposed washery, - Commitment/MoU for procurement of raw coal for the washery and the washed coal to the potential consumers 05 Feb 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NADeferred 01 May 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRAMAKRISHNA
DesignationVicepresident
Name of Company (Applicant Name should not be given here)GLOBAL COAL & MINING PVT. LTD
Address#2, First floor, Sector-8 market, R.K. Puram, New Delhi
Print