APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Environmental Clearance as per MoEF & CC Notification dated 06th April, 2018 for Existing Mohangarh Gypsum (Minor Mineral) Mining project (M.L. Area- 501.67 HA, M.L. No.-27/62) with Production Capacity of 4.5 Lakhs TPA Gypsum and ,29,251 cum/year OB at Near Village- Mohangarh Tehsil & District- Jaisalmer (Raj.) By M/s FCI Aravali Gypsum and Minerals India Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/RJ/MIN/87033/2018 | Project Cost | 80 lacs | |
| 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Non-Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 4.5 Laks TPA Gypsum and 1,29,251 cum/year OB. ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 501.67 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Village Mohangarh | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 238/54, 238/62, 238/55, 238/47, 238/63, 238/64, 238/56, 238/48, 238/40, 239/17, 239/25, 239/33, 239/41, 239/49, 239/57, 239/58, 239/50, 239/42, 239/34, 239/26, 239/18, 239/27, 239/35, 239/43,
239/51, 239/59, 239/60, 239/52, 239/44, 239/36, 239/45, 239/53, 239/61, 239/54, 239/46, 2209, 2208, 2179/3009, 2178/3011,
2229, 2284, 2284/2926, 2278, 2230/4268, 2253,54, 80 to 83, 2284/2977, 2284/2978, 2600/4 | Town / Village | Mohangarh | State of the project | Rajasthan | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Rajasthan | Jaisalmer | Jaisalmer | | 10. | |
Nearest railway station along with distance in kms | Chandan railway station, ~33.0 Km in SSE. km | Nearest airport along with distance in kms | Jaisalmer airport, ~60 Km in SW km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Mohangarh , ~ 2.85 km in WSW km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Mohangarh ~ 2.85 km in WSW direction | | 13. | Name of the Applicant | Surendra | | 14. | Registered Address | R/o Mangu Singh Rajiv Marg, Paota B Road, Jodhpur | | 15. | |
Address for correspondance: | Name of the Company | FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED | Name of the Applicant | Surendra | Designation (Owner/ Partner/ CEO) | GM | Pin code | 342010 | E-mail | fagmilrp@gmail.com | Telephone No. | 291-2544392 | Fax No. | 291-2544523 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The existing land in the mining lease area will degrade by proposed mining activities.
After excavation of mineral 7.20 ha pvt. land out of 501.67 ha will be used for agriculture purpose and remaining Govt. waste land will be backfilled and will be afforested. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Mine lease area comprises undulated terrain with sand dunes and has poor vegetation and no buildings in the area. So no clearance will be required for existing land, vegetation, and building. | 1.3 | Creation of new land uses? | Yes | After excavation of mineral 7.20 ha pvt. land out of 501.67 ha will be used for agriculture purpose and remaining Govt. waste land will be backfilled and will be afforested. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not required | 1.5 | Construction works? | No | The opencast semi-mechanized mining does not involve any construction work | 1.6 | Demolition works? | No | There will be no demolition work | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No need for construction of housing of workers. As the local labour will be employed, there is no proposal for making housing arrangements | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Extraction of minor mineral will be restricted in allotted lease area. | 1.9 | Underground works including mining or tunnelling? | No | This is opencast semi-mechanised mine, so no
underground mining or tunnelling is required. | 1.10 | Reclamation works? | Yes | Simultaneously reclamation of land affected by means of backfilling and leveling of the worked-out pit and used for the plantation purpose | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Excavation of gypsum mineral by adopting semi mechanized open cast mining method. JCB/ excavator for loading into trucks, tippers and tractor/trolleys will be deployed during operation phase | 1.14 | Facilities for storage of goods or materials? | No | There will be no storage of the mineral as the same will be directly transported to the destination | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | No solid waste or liquid effluent will be generation | 1.16 | Facilities for long term housing of operational workers? | No | Workers will be hired / employed locally from the nearby villages, for the proposed mining activity. Thus no housing facility will be developed near mine site | 1.17 | New road, rail or sea traffic during construction or operation? | No | No construction activity is envisaged required. The existing approach road is sufficient during operation of mine | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | There are already approach roads connecting mining contract area. Hence, new road, rail, air, waterborne infrastructure including new or altered routes and stations, ports, airport is not required | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | There is no proposal for closure or diversion of existing transport route etc. | 1.20 | New or diverted transmission lines or pipelines? | No | No new or diverted transmission lines or pipelines are proposed | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | None. Mining will be done above ground water table. So, there are no Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers | 1.22 | Stream crossings? | No | Not applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | About 28.5 KLD water will be required (Dust Suppression, Plantation and domestic purpose). The required quantityof water will be sourced through tanker | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Surface run-off in mine contract area will flow
conforming to the general slope of the area | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | During the operational phase, required mining machinery and personnel will be transported to the mine lease area and on decommissioning mining equipment will be shifted | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Long-term dismantling or decommissioning or restoration works are not involved | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | No | The work will be carried out during day time by deploying local labour, which will come to the work in the mine area and return to their home. There will be more positive impact than the negative impact on the workers of mine lease area | 1.29 | Introduction of alien species? | No | No such introduction of alien species is foreseen. | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity is expected | 1.31 | Any other actions? | No | None | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Total 501.67 ha will be used for mining activities in which 494.47 ha Govt. Waste Land and 7.20 ha Pvt.land | 2.2 | Water (expected source & competing users) unit: KLD | Yes | About 28.5KLD water will be required (Dust Suppression, Plantation and domestic purpose). The required quantity of water will be sourced through tanker | 2.3 | Minerals (MT) | No | Gypsum will be excavated from mining lease area but will not be utilized in this project. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | Not Required Only temporary office, rest shelters are/will be provided | 2.5 | Forests and timber (source – MT) | No | Not required for this project | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | No | No electricity is required. All mining machinery will be diesel driven. Approximately, 135 LPD HSD oil will be required for running the machinery | 2.7 | Any other natural resources (use appropriate standard units) | No | None | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No hazardous, toxic, semi toxic or any other material will be used or generated | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | There will be no change in occurrence of diseases due to mining of Gypsum | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Project will encourage the economy of the local people
by direct and indirect employment opportunity. Besides
this, social welfare measures will be undertaken as
CSE/EMP activity which will ameliorate the economic status of the people around the project area | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | None | 3.5 | Any other causes | No | NA | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | Total 387931 m3 overburden will be generated during
next 5 years mining proposal | 4.2 | Municipal waste (domestic and or commercial wastes) | No | There will be no generation of municipal waste due to
the proposed mining activities. Only domestic waste water will be generated from mine office etc. which will be disposed off in septic tank | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | No hazardous wastes are envisaged within mine lease area. | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | No | No surplus products are expected | 4.6 | Sewage sludge or other sludge from effluent treatment | No | No Sewage, effluent treatment plant is involved, however domestic waste water generated from the mine office etc. Toilets will be used hence no sewage/liquid effluent will be generated | 4.7 | Construction or demolition wastes | No | There will be no construction or demolition except small constructions like mine office, rest shelter etc | 4.8 | Redundant machinery or equipment | No | Any machinery or equipment, if found redundant, will be shifted out from the mining contract area | 4.9 | Contaminated soils or other materials | No | There will not be any contamination of soils or their materials | 4.10 | Agricultural wastes | No | There will be no agricultural waste | 4.11 | Other solid wastes | No | None | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | There will be gaseous emission from combustion of fossil fuel from vehicles to be used for transportation of mineral and mining machinery | 5.2 | Emissions from production processes | Yes | Fugitive dust will be generated during excavation and loading processes. The production process will not involve any drilling and blasting | 5.3 | Emissions from materials handling including storage or transport | No | There will be no storage of the mineral as the same will be directly transported to the destination | 5.4 | Emissions from construction activities including plant and equipment | No | No construction will be done at the mining site. Hence, no emissions are anticipated. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust will be generated mainly during material
handling, transportation etc | 5.6 | Emissions from incineration of waste | No | No incineration of waste will be done | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | No burning of waste will be done, hence no emission is expected. | 5.8 | Emissions from any other sources | No | None | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Mining operations will require equipments such as Excavator, dumpers, tractor, trolleys etc. | 6.2 | From industrial or similar processes | No | No industrial process is involved. | 6.3 | From construction or demolition | No | No construction or demolition is proposed. | 6.4 | From blasting or piling | No | No blasting and piling is envisaged for the mining
process. | 6.5 | From construction or operational traffic | No | Noise will be generated during mining operation and transportation of mineral. | 6.6 | From lighting or cooling systems | No | Since mining will be conducted in day time only, No lightning system is required | 6.7 | From any other sources | No | None | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Since no hazardous material will be used or produced at the site, no risk of contamination of land or water is envisaged | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | No waste water will be generated due to the
proposed mining activities. Only domestic waste water will be generated from mine office etc. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | No drilling or blasting will be involved in the proposed
mining project. However, fugitive dust emission is expected during handling of mineral i.e. during excavation / loading of mineral. | 7.4 | From any other sources | No | None | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | No incidence of long term build up of pollutants is expected. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | No hazardous substance will be used or produced during the proposed mining operations.
However, fire extinguisher will be provided during operation phase. | 8.2 | From any other causes | Yes | Risk of accidents are expected:
a. During loading of minerals into truck/ tractors/ trolley.
b. During transportation. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The area is not prone to flood and earthquake. No such incident was reported in recent past. In view point of seismicity; project comes in Zone-III of Seismic Zoning Map of India. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | None | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | The impact on environment will be positive. | 9.3 | Set a precedent for later developments | No | None | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | The area is free from any disturbances. There are not any industries or development projects in its close proximity | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No such area is located within 10 km radius of the mine lease area. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | No such area is located within 10km radius of the mine lease area.
Only Indira Gandhi Canal approx 3.80 kms towards WNW direction. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | No | No such area is located within 10km radius of the mine lease area | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | Yes | Mohangarh ~ 2.85 km in WSW direction
Jaisalmer ~54 Km in SW | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | PHC & CHC at Mohangarh ~ 2.85 km in WSW direction.
Primary & Sr. Sec School at Mohangarh ~ 2.85 km in WSW direction
Community Facilities
All other facilities are available at Mohangarh ~ 2.85 km in WSW direction | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The project site falls in Zone-III as per IS 1893 (Part- I):
2002. Hence, seismically it is a stable zone. No
Earthquakes, subsidence, landslides, erosion, flooding
or extreme or adverse climatic conditions are observed
in past. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 2. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 3. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 4. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 5. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 6. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 7. | ADS Reply Letter | Dear Sir, With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR.
The letter of validity of Mine lease from state Government is attached here with as required. | 02 Feb 2021 | 8. | NA | deferred
| 10 May 2019 | 9. | NA | deferred
| 10 May 2019 | 10. | ADS Reply Letter | Dear Sir,
With reference to Proposal under the provision of Notification dated 06-04-2018 of Mohangarh Gypsum Mining Project (M.L. No.-27/62; 501.67 Ha) of M/s FCI Aravali Gypsum and Minerals India Ltd. located in Village Mohangarh. Tehsil & District Jaisalmer, Rajsthan for Gypsum Production 4.5 Lakhs TPA and O.B. handling 129251 m3/annum for grant of ToR, point wise response to the information sought is given for your kind perusal and grant of Terms of Reference. | 06 Mar 2019 | 11. | NA | NA | 01 Feb 2019 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Surendra | Designation | GM | Name of Company (Applicant Name should not be given here) | FCI ARAVALI GYPSUM AND MINERALS INDIA LIMITED | Address | R/o Mangu Singh Rajiv Marg, Paota B Road, Jodhpur |
|
|