APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Environmental Clearance for the proposed greenfield project for setting up the Ethyl Acetate Plant with capacity of 25 TPD, Formaldehyde plant with capacity of 50 TPD and API manufacturing plant with capacity of 1.2 TPD at Village-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab by M/s. Banstag Life sciences Pvt. Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/PB/IND2/102129/2019 | Project Cost | 752 lacs | |
| 2. | |
S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Ethyl Acetate- 25 TPD, Formaldehyde- 50 TPD, API- 1.2 MTPD, Number of working days=300 & area-1.045 ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 1.045 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | Yes | d) | Inter-State boundaries and international boundaries | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Village-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Khewat/ Khatoni No. 82/227 Khasra no. 1580(3-14), 1581(3-14), 1579(5-1),
Kitte-3 & Hadbast no-220 (Malakpur) Tehsil-Derabassi, District-S.A.S Nagar,
Punjab | Town / Village | Village-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab | State of the project | Punjab | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Punjab | SAS Nagar | Derabassi | | 10. | |
Nearest railway station along with distance in kms | LALRU, 4.5 km | Nearest airport along with distance in kms | International Airport Mohali, 22 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | MALAKPUR , 1 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Office Of Zilla Parishad,SAS Nagar Mohali, Khuda Ali Sher Road, Sector 1,
Chandigarh, 160001, Mob-098148 25149 | | 13. | Name of the Applicant | SUNIL | | 14. | Registered Address | H.no. 170, sector 18-A, chandigarh | | 15. | |
Address for correspondance: | Name of the Company | BANSTAG LIFE SCIENCES PVT LTD | Name of the Applicant | SUNIL | Designation (Owner/ Partner/ CEO) | DIRECTOR | Pin code | 160018 | E-mail | banstagmalakpur@gmail.com | Telephone No. | 0172-2543036 | Fax No. | 0172- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | Yes | Uploaded details | Annexure-Uploaded details | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | | 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Total land area of the project is 12 bhiga 9 biswa (2.58 acre). Acquired land will be required Permanent change in land use, land cover or
topography of the land use from agricultural to industrial purpose for
which change in land use application is already applied | 1.2 | Clearance of existing land, vegetation and buildings? | No | The land is under the possession of proponent and there would not be any
clearance of land, vegetation required and there is no any permanent structure available at site | 1.3 | Creation of new land uses? | Yes | Construction and setting up of proposed plant will change the land use | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Geophysical investigation, including In situ testing, for the characterization of surface and sub surface soil properties | 1.5 | Construction works? | Yes | Construction/erection work to be taken up after getting environmental clearance and CTE from pollution control board | 1.6 | Demolition works? | No | No demolition work is required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No temporary sites would be constructed for the housing of construction workers | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction of office/shed for machinery, equipment as per project
requirement. | 1.9 | Underground works including mining or tunnelling? | No | No mining / tunneling is involved. | 1.10 | Reclamation works? | No | Not envisaged | 1.11 | Dredging? | No | Not required | 1.12 | Offshore structures? | No | Not required | 1.13 | Production and manufacturing processes? | Yes | Production and Manufacturing process The details of production and manufacturing process are incorporated in the PFR | 1.14 | Facilities for storage of goods or materials? | Yes | Adequate storage facilities for raw material and finished product will be
provided within the proposed project site. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | ETP of capacity 20 KLD will be installed to treat the waste water | 1.16 | Facilities for long term housing of operational workers? | No | Not envisaged | 1.17 | New road, rail or sea traffic during construction or operation? | No | No new road & rail network construction envisaged as the proposed Unit has all the required facility. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Existing facilities shall be utilised. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | 1.22 | Stream crossings? | No | Not applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total water requirement for the proposed project will be 50 KLD (approx).
Which will be sourced from ownbore well for which the permission will be
taken from CGWA and application is already applied vide application no.
21-4/53114/PB/IND/2019 dated 04/04/2019 | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | The raw materials will be sourced from local market. They will be
transported to the site by road through trucks. During construction phase
approx. 25 persons will be required. The manpower for the proposed
project will be around 117 for operation phase. The number of working
days for the proposed project will be 300 days per annum. There would
not be any decommissioning activity. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No dismantling or decommissioning or restoration works as it is new unit | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During construction phase approx. 25 persons will be required and 117
persons will be required during operation pahse. Local people will be sourced from the nearby areas. | 1.29 | Introduction of alien species? | No | Not applicable | 1.30 | Loss of native species or genetic diversity? | No | Not applicable | 1.31 | Any other actions? | No | Not applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The land comes under the Industrial zone as per the Land use
classification certificate which confirms the availability of the Hadbast
no.220 in the land use plan (Lalru). The land is already under the
possession of project proponent. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water Requirement for the proposed project will be approx. 49.2 KL
(approx. 50 KL). Source: Ground water will be used at the project site
through Tube well and the permission for extraction of ground water shall
be taken from CGWA and application is already applied vide application
no. 21-4/53114/PB/IND/2019 dated 04/04/2019 | 2.3 | Minerals (MT) | No | Not applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material (stone, aggregates, and/soil) required for the construction. | 2.5 | Forests and timber (source – MT) | No | Not applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The power requirement for the proposed project will be 600 KW. Source:
The power will be supplied from PSTCL (Punjab State Transmission Corporation Limited) The steam requirement shall be fulfilled by the industrial boiler of 6 TPH based on multi-feed fuel | 2.7 | Any other natural resources (use appropriate standard units) | No | Not envisaged | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Typical types of waste generated from the proposed project having waste
category code- 5.1-Used oil or spent oil, 28.1-Process residue and waste,
28.3-Spent Catalyst, 28.4-Off-specification products, 28.6-Spent Solvent & 35.3-ETP sludge. All the hazardous substances in the proposed project will
be a little quantity, Which will be stored separately & disposed of as per CPCB and MOEF guidelines & as per local regulations | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Project activities are not likely to cause changes in the occurrence of disease or affect disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Employment opportunities will be created by operation of the plant. This will be benefited by direct and indirect employment which would improve
the living conditions of the people and also through socio economic measures taken up by the proponent. Direct employment is approx 117 numbers | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not envisaged | 3.5 | Any other causes | No | Not applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | No mine or separation activity | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal solid waste will be generated from the proposed project which
will be disposed off as per the legal requirement. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | 5.1-Used oil or spent oil, 35.3-ETP sludge. All the hazardous waste shall
be stored separately & disposed of as per CPCB and MOEF guidelines & as per local regulations. Used Oil from DG set will be sold to the authorized recyclers. The solid waste (ETP sludge), will be sent to TSDF site Nimbua,
Derabassi | 4.4 | Other industrial process wastes | Yes | 28.1-Process residue and waste, 28.3-Spent Catalyst, 28.4-Offspecification products, 28.6-Spent Solvent & 35.3-ETP sludge. Quantity of Industrial waste generated will be 100 Kg/month which will be disposed off as per the legal requirement. | 4.5 | Surplus product | No | Nil | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | ETP sludge will be sent to TSDF site Nimbua, Derabassi. The agreement
shall be done after the grant of EC | 4.7 | Construction or demolition wastes | Yes | Construction waste like soil, brickbats, etc. will be utilized in leveling of land and construction of roads. | 4.8 | Redundant machinery or equipment | No | There will not be any redundant machinery or equipment. | 4.9 | Contaminated soils or other materials | No | There will be no contamination of soil or any other material. | 4.10 | Agricultural wastes | No | No agricultural wastes will be generated. | 4.11 | Other solid wastes | No | Not envisaged | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Boiler Emissions from fuel, which consists of pollutants like SPM, and CO2
would be discharged into atmosphere through scrubber system (APCD) | 5.2 | Emissions from production processes | Yes | All the residual (process) emissions are channelized through the scrubber
system (APCD) before it's escaped into the atmosphere. Two scrubbers
shall be installed/used for API manufacturing plant & One scrubber each shall be installed for Ethyl Acetate Plant & One for Formaldehyde plant. | 5.3 | Emissions from materials handling including storage or transport | Yes | Water sprinklers are provided for suppression of dust during movements
of transport. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Working of construction equipment aided with fossil fuel (diesel) and
transportation of construction material is likely to increase emission of Particulate Matters, SOx and NOx | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust generation as mentioned above. To reduce the odour problems scrubber system (APCD) shall be used | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | Not envisaged | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | In the plant, noise from operation of equipments will be generated. Noise
level will be kept below the limit prescribed by CPCB. Noise abatement
measures will be taken and persons working close to machines will be
provided with personal protective equipments viz. Ear plugs/Ear muffs etc.
for further protection. | 6.2 | From industrial or similar processes | Yes | The noise generation from machinery will be low and limited as the entire
process will be in a closed circuit. There will be some noise generation due
to the working motors only. The details of noise effect are same as explained at item 6.1 above. | 6.3 | From construction or demolition | Yes | New construction | 6.4 | From blasting or piling | Yes | Piling work will be done as per project requirement | 6.5 | From construction or operational traffic | Yes | The noise generated from construction activities will be of temporary
nature and maintained within the prescribed Noise standards. | 6.6 | From lighting or cooling systems | No | No noise generation from lighting or cooling system is envisaged | 6.7 | From any other sources | No | No other source envisaged. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Hazardous wastes(Used Oil) shall be suitably disposed-off through
registered recyclers, as per Hazardous and Other Wastes (Management
& Transboundary Movement) Rules, 2016 and subsequent amendments | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Proposed Plant shall adopt the ZLD. No discharge of sewage or other
effluents to water or the land. ETP of capacity 20 KLD will be installed. The
treated water from ETP shall be utilized for plantation as per Karnal
technology. The solid waste (ETP sludge), will be sent to TSDF site at Nimbua Derabassi | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Scrubber system shall be used to neutralize the emissions generated &
ZLD shall be adopted | 7.4 | From any other sources | No | Not applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | All safety rules as laid down by concerned Authorities will have complied. | 8.2 | From any other causes | No | Not envisaged | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | No such event is known to have occurred in the area. Area falls under
Seismic Zone IV. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Supporting facilities shall be developed in the proposed plant. The
proposed project will have a positive effect and enhance the growth of the
region. Management will provide appropriate contribution towards
improvement of Medical and educational facilities for rural population in
the vicinity. •The industry will help in promoting the activities related to environmental awareness in nearby Villages •Trained operators and
workers in various aspects of EHS will be employed. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable | 9.3 | Set a precedent for later developments | Yes | As new technology shall be installed, the technology shall enable energy efficiency and process optimization | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | There will be no environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No such area within 10 km around the project site | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Chao Nala is at a distance of 2.6 km (approx.) in SSE direction.
Dhangdhari Nala is at a distance of 4.2 km (approx.) in SE
direction. Jarmal Nadi is at a distance of 4.5 km (approx) in NW
direction. Dangri Nadi is at a distance of 6.8km (approx) in South
East direction. Ghagghar River is at a distance of 6.8 km (approx)
in West direction. Sarsini Nala is at a distance of 8.0 km (approx.)
in SW direction Baliali Nadi is at a distance of 9.1 km (approx) in
South East direction. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Bir Kheri PF is at a distance of 8.6 km (approx) in NNE direction.
Bir Hansla PF is at a distance of 7.7 km (approx) in NW direction.
Conservation plan shall be prepared for conservation of schedule-1
species if any found in the study area | 4 | Inland, coastal, marine or underground waters | No | No Inland, coastal, marine or underground waters around the 10
km of the projectsite | 5 | State, National boundaries | No | Punjab-Haryana interstate boundary is at a distance of (approx.) 4 km in South direction. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | National Highway NH-22 is at a distance of 4.3 km in WNW direction. | 7 | Defence installations | No | No such area within 10 km around the project site. | 8 | Densely populated or built-up area | Yes | Lalru is at a distance of 4.3 km (approx) in NW direction. Malakpur is at a distance of 1 km (approx) in NE direction | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Holy Angels Smart School is at a distance of 3.5 km (approx) in WNW. Sawan International School is at a distance of 4.6 km (approx) in NW. Post office- Lalru is based at a distance of 4.4 km (approx) in NW. Police Station-Police Station Lalru is at a distance of 4.5 km (approx) in NW. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Bir Kheri PF is at a distance of 8.6 km (approx) in NNE direction.
Bir Hansla PF is at a distance of 7.7 km (approx) in NW direction.
Jarmal Nadi is at a distance of 4.5 km (approx) in NW direction.
Dangri Nadi is at a distance of 6.8km (approx) in South East direction. Ghagghar River is at a distance of 6.8 km (approx) in West direction. Baliali Nadi is at a distance of 9.1 km (approx) in South East direction. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | No such area within 10 km around the project site. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | No such area within 10 km around the project site. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | SUNIL | Designation | DIRECTOR | Name of Company (Applicant Name should not be given here) | BANSTAG LIFE SCIENCES PVT LTD | Address | H.no. 170, sector 18-A, chandigarh |
| |
|