Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Environmental Clearance for the proposed greenfield project for setting up the Ethyl Acetate Plant with capacity of 25 TPD, Formaldehyde plant with capacity of 50 TPD and API manufacturing plant with capacity of 1.2 TPD at Village-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab by M/s. Banstag Life sciences Pvt. Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/PB/IND2/102129/2019
Project Cost 752 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Ethyl Acetate- 25 TPD, Formaldehyde- 50 TPD, API- 1.2 MTPD, Number of working days=300 & area-1.045 ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 1.045 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Khewat/ Khatoni No. 82/227 Khasra no. 1580(3-14), 1581(3-14), 1579(5-1), Kitte-3 & Hadbast no-220 (Malakpur) Tehsil-Derabassi, District-S.A.S Nagar, Punjab
Town / VillageVillage-Malakpur, Lalru, Tehsil-Derabassi, District-S.A.S. Nagar, State-Punjab
State of the projectPunjab
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)PunjabSAS NagarDerabassi
10.
Nearest railway station along with distance in kms LALRU, 4.5 km
Nearest airport along with distance in kms International Airport Mohali, 22 km
11. Nearest Town/City/District Headquarters along with distance in kms MALAKPUR , 1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Office Of Zilla Parishad,SAS Nagar Mohali, Khuda Ali Sher Road, Sector 1, Chandigarh, 160001, Mob-098148 25149
13. Name of the Applicant SUNIL
14. Registered Address H.no. 170, sector 18-A, chandigarh
15.
Address for correspondance:
Name of the Company BANSTAG LIFE SCIENCES PVT LTD
Name of the Applicant SUNIL
Designation (Owner/ Partner/ CEO) DIRECTOR
Pin code 160018
E-mail banstagmalakpur@gmail.com
Telephone No. 0172-2543036
Fax No. 0172-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet Yes
Uploaded detailsAnnexure-Uploaded details
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Total land area of the project is 12 bhiga 9 biswa (2.58 acre). Acquired land will be required Permanent change in land use, land cover or topography of the land use from agricultural to industrial purpose for which change in land use application is already applied
1.2 Clearance of existing land, vegetation and buildings? No The land is under the possession of proponent and there would not be any clearance of land, vegetation required and there is no any permanent structure available at site
1.3 Creation of new land uses? Yes Construction and setting up of proposed plant will change the land use
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geophysical investigation, including In situ testing, for the characterization of surface and sub surface soil properties
1.5 Construction works? Yes Construction/erection work to be taken up after getting environmental clearance and CTE from pollution control board
1.6 Demolition works? No No demolition work is required
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites would be constructed for the housing of construction workers
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Construction of office/shed for machinery, equipment as per project requirement.
1.9 Underground works including mining or tunnelling? No No mining / tunneling is involved.
1.10 Reclamation works? No Not envisaged
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Production and Manufacturing process The details of production and manufacturing process are incorporated in the PFR
1.14 Facilities for storage of goods or materials? Yes Adequate storage facilities for raw material and finished product will be provided within the proposed project site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes ETP of capacity 20 KLD will be installed to treat the waste water
1.16 Facilities for long term housing of operational workers? No Not envisaged
1.17 New road, rail or sea traffic during construction or operation? No No new road & rail network construction envisaged as the proposed Unit has all the required facility.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing facilities shall be utilised.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Total water requirement for the proposed project will be 50 KLD (approx). Which will be sourced from ownbore well for which the permission will be taken from CGWA and application is already applied vide application no. 21-4/53114/PB/IND/2019 dated 04/04/2019
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The raw materials will be sourced from local market. They will be transported to the site by road through trucks. During construction phase approx. 25 persons will be required. The manpower for the proposed project will be around 117 for operation phase. The number of working days for the proposed project will be 300 days per annum. There would not be any decommissioning activity.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning or restoration works as it is new unit
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes During construction phase approx. 25 persons will be required and 117 persons will be required during operation pahse. Local people will be sourced from the nearby areas.
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land comes under the Industrial zone as per the Land use classification certificate which confirms the availability of the Hadbast no.220 in the land use plan (Lalru). The land is already under the possession of project proponent.
2.2 Water (expected source & competing users) unit: KLD Yes Water Requirement for the proposed project will be approx. 49.2 KL (approx. 50 KL). Source: Ground water will be used at the project site through Tube well and the permission for extraction of ground water shall be taken from CGWA and application is already applied vide application no. 21-4/53114/PB/IND/2019 dated 04/04/2019
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material (stone, aggregates, and/soil) required for the construction.
2.5 Forests and timber (source – MT) No Not applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power requirement for the proposed project will be 600 KW. Source: The power will be supplied from PSTCL (Punjab State Transmission Corporation Limited) The steam requirement shall be fulfilled by the industrial boiler of 6 TPH based on multi-feed fuel
2.7 Any other natural resources (use appropriate standard units) No Not envisaged
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Typical types of waste generated from the proposed project having waste category code- 5.1-Used oil or spent oil, 28.1-Process residue and waste, 28.3-Spent Catalyst, 28.4-Off-specification products, 28.6-Spent Solvent & 35.3-ETP sludge. All the hazardous substances in the proposed project will be a little quantity, Which will be stored separately & disposed of as per CPCB and MOEF guidelines & as per local regulations
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Project activities are not likely to cause changes in the occurrence of disease or affect disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Employment opportunities will be created by operation of the plant. This will be benefited by direct and indirect employment which would improve the living conditions of the people and also through socio economic measures taken up by the proponent. Direct employment is approx 117 numbers
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No mine or separation activity
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal solid waste will be generated from the proposed project which will be disposed off as per the legal requirement.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes 5.1-Used oil or spent oil, 35.3-ETP sludge. All the hazardous waste shall be stored separately & disposed of as per CPCB and MOEF guidelines & as per local regulations. Used Oil from DG set will be sold to the authorized recyclers. The solid waste (ETP sludge), will be sent to TSDF site Nimbua, Derabassi
4.4 Other industrial process wastes Yes 28.1-Process residue and waste, 28.3-Spent Catalyst, 28.4-Offspecification products, 28.6-Spent Solvent & 35.3-ETP sludge. Quantity of Industrial waste generated will be 100 Kg/month which will be disposed off as per the legal requirement.
4.5 Surplus product No Nil
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP sludge will be sent to TSDF site Nimbua, Derabassi. The agreement shall be done after the grant of EC
4.7 Construction or demolition wastes Yes Construction waste like soil, brickbats, etc. will be utilized in leveling of land and construction of roads.
4.8 Redundant machinery or equipment No There will not be any redundant machinery or equipment.
4.9 Contaminated soils or other materials No There will be no contamination of soil or any other material.
4.10 Agricultural wastes No No agricultural wastes will be generated.
4.11 Other solid wastes No Not envisaged
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Boiler Emissions from fuel, which consists of pollutants like SPM, and CO2 would be discharged into atmosphere through scrubber system (APCD)
5.2 Emissions from production processes Yes All the residual (process) emissions are channelized through the scrubber system (APCD) before it's escaped into the atmosphere. Two scrubbers shall be installed/used for API manufacturing plant & One scrubber each shall be installed for Ethyl Acetate Plant & One for Formaldehyde plant.
5.3 Emissions from materials handling including storage or transport Yes Water sprinklers are provided for suppression of dust during movements of transport.
5.4 Emissions from construction activities including plant and equipment Yes Working of construction equipment aided with fossil fuel (diesel) and transportation of construction material is likely to increase emission of Particulate Matters, SOx and NOx
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust generation as mentioned above. To reduce the odour problems scrubber system (APCD) shall be used
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not envisaged
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes In the plant, noise from operation of equipments will be generated. Noise level will be kept below the limit prescribed by CPCB. Noise abatement measures will be taken and persons working close to machines will be provided with personal protective equipments viz. Ear plugs/Ear muffs etc. for further protection.
6.2 From industrial or similar processes Yes The noise generation from machinery will be low and limited as the entire process will be in a closed circuit. There will be some noise generation due to the working motors only. The details of noise effect are same as explained at item 6.1 above.
6.3 From construction or demolition Yes New construction
6.4 From blasting or piling Yes Piling work will be done as per project requirement
6.5 From construction or operational traffic Yes The noise generated from construction activities will be of temporary nature and maintained within the prescribed Noise standards.
6.6 From lighting or cooling systems No No noise generation from lighting or cooling system is envisaged
6.7 From any other sources No No other source envisaged.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous wastes(Used Oil) shall be suitably disposed-off through registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Proposed Plant shall adopt the ZLD. No discharge of sewage or other effluents to water or the land. ETP of capacity 20 KLD will be installed. The treated water from ETP shall be utilized for plantation as per Karnal technology. The solid waste (ETP sludge), will be sent to TSDF site at Nimbua Derabassi
7.3 By deposition of pollutants emitted to air into the land or into water No Scrubber system shall be used to neutralize the emissions generated & ZLD shall be adopted
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No All safety rules as laid down by concerned Authorities will have complied.
8.2 From any other causes No Not envisaged
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No such event is known to have occurred in the area. Area falls under Seismic Zone IV.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting facilities shall be developed in the proposed plant. The proposed project will have a positive effect and enhance the growth of the region. Management will provide appropriate contribution towards improvement of Medical and educational facilities for rural population in the vicinity. •The industry will help in promoting the activities related to environmental awareness in nearby Villages •Trained operators and workers in various aspects of EHS will be employed.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments Yes As new technology shall be installed, the technology shall enable energy efficiency and process optimization
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No There will be no environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No such area within 10 km around the project site
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Chao Nala is at a distance of 2.6 km (approx.) in SSE direction. Dhangdhari Nala is at a distance of 4.2 km (approx.) in SE direction. Jarmal Nadi is at a distance of 4.5 km (approx) in NW direction. Dangri Nadi is at a distance of 6.8km (approx) in South East direction. Ghagghar River is at a distance of 6.8 km (approx) in West direction. Sarsini Nala is at a distance of 8.0 km (approx.) in SW direction Baliali Nadi is at a distance of 9.1 km (approx) in South East direction.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Bir Kheri PF is at a distance of 8.6 km (approx) in NNE direction. Bir Hansla PF is at a distance of 7.7 km (approx) in NW direction. Conservation plan shall be prepared for conservation of schedule-1 species if any found in the study area
4 Inland, coastal, marine or underground waters No No Inland, coastal, marine or underground waters around the 10 km of the projectsite
5 State, National boundaries No Punjab-Haryana interstate boundary is at a distance of (approx.) 4 km in South direction.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway NH-22 is at a distance of 4.3 km in WNW direction.
7 Defence installations No No such area within 10 km around the project site.
8 Densely populated or built-up area Yes Lalru is at a distance of 4.3 km (approx) in NW direction. Malakpur is at a distance of 1 km (approx) in NE direction
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Holy Angels Smart School is at a distance of 3.5 km (approx) in WNW. Sawan International School is at a distance of 4.6 km (approx) in NW. Post office- Lalru is based at a distance of 4.4 km (approx) in NW. Police Station-Police Station Lalru is at a distance of 4.5 km (approx) in NW.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Bir Kheri PF is at a distance of 8.6 km (approx) in NNE direction. Bir Hansla PF is at a distance of 7.7 km (approx) in NW direction. Jarmal Nadi is at a distance of 4.5 km (approx) in NW direction. Dangri Nadi is at a distance of 6.8km (approx) in South East direction. Ghagghar River is at a distance of 6.8 km (approx) in West direction. Baliali Nadi is at a distance of 9.1 km (approx) in South East direction.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No such area within 10 km around the project site.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No such area within 10 km around the project site.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSUNIL
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)BANSTAG LIFE SCIENCES PVT LTD
AddressH.no. 170, sector 18-A, chandigarh
Print