APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed Synthetic Resin Manufacturing Unit (150 TPD) | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/PB/IND2/100992/2019 | Project Cost | 1200 lacs | |
| 2. | |
S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Synthetic Resin – 150 TPD or 49500 TPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Khasra no. 17/26 (5-11), at Village Doulowal, Tehsil and District Hoshiarpur, Punjab | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Khasra no. 17/26 (5-11) | Town / Village | Village Doulowal, Tehsil and District Hoshiarpur, Punjab | State of the project | Punjab | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Punjab | Hoshiarpur | Hoshiarpur | | 10. | |
Nearest railway station along with distance in kms | Hoshiarpur Railway Station, 8.60 km | Nearest airport along with distance in kms | Adampur Airport, 20.58 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Hoshiarpur , 8.00 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Gram panchayat of Daulowal | | 13. | Name of the Applicant | Bhupinder | | 14. | Registered Address | Century House, P15/1, Taratala Road | | 15. | |
Address for correspondance: | Name of the Company | CENTURY PLYBOARDS INDIA LTD | Name of the Applicant | Bhupinder | Designation (Owner/ Partner/ CEO) | FactoryManager | Pin code | 144208 | E-mail | raman.kumar@centuryply.com | Telephone No. | 01882-277377 | Fax No. | 01882- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | Yes | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Earlier land was agricultural land, which has been developed into industrial area (for manufacturing MDF/HDF board) after taking change in land use vide letter No. PBIP/STP/2016/455 dated 01.04.2016. However, land cover of 0.1268 ha of vacant area will change from vacant land to Resin plant.
The total plot area of site is 21.8287 ha, out of which 0.1268 ha shall be used for manufacturing Resin and rest land have operational MDF/HDF plant. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not required | 1.3 | Creation of new land uses? | No | No further change in land use. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Already done | 1.5 | Construction works? | Yes | Concreting shall be done in areas of plant and machinery installation; further works will be required to put storage tanks etc. | 1.6 | Demolition works? | No | Not Required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | During installation, 50 Nos. of local labour shall be engaged from nearby area. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Processing section building shall be made at above ground level for proposed part | 1.9 | Underground works including mining or tunnelling? | No | Not applicable | 1.10 | Reclamation works? | No | Not applicable | 1.11 | Dredging? | No | Not applicable | 1.12 | Offshore structures? | No | Not applicable | 1.13 | Production and manufacturing processes? | Yes | Synthetic resin (like Urea- Formaldehyde Resin (UF), Melamine formaldehyde Resin (MF), Melamine Urea Formaldehyde Resin (MUF)) will be manufactured by mixing and blended in kettle to produce resin. Process requires steam which will be sourced from common boiler | 1.14 | Facilities for storage of goods or materials? | Yes | All the liquid raw material shall be stored in leak proof MS/SS tanks and rest in HDPE bags with proper safety measures. Storage for raw material and proper storage of product shall be provided with exhaust system and leak detection systems. Storage of all chemicals shall be done in compliance to MSIHC Rules, 1989 and its subsequent amendments. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Three types of solid waste shall be generated from the proposed unit, Municipal waste, process waste & Hazardous waste.
Municipal solid waste: Total 4.5 kg/day Municipal solid waste will be generated out of which 2.7 kg/day of Bio-Degradable waste will be disposed by vermi-composting, Recyclable Waste of 1.8 Kg/day shall be given to Authorized Recycler.
Details given in Pre-feasibility report | 1.16 | Facilities for long term housing of operational workers? | No | None | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No such closure or diversion of existing transport is required. | 1.20 | New or diverted transmission lines or pipelines? | No | No new or diversion of transmission lines or pipelines will be done. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourse is required. | 1.22 | Stream crossings? | No | No stream crossing the site. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Source of Water: Ground Water
6 KLD of fresh water shall be used in the process and domestic purposes. Permission has been obtained vide letter CGWA/NOC/IND/ORIG/2017/2619 dated 29th May 2017. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There will be no changes in water bodies or the land surface effective drainage or run-off. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | All raw materials will be transported using road trucks from various parts of India and imported raw materials will be transported from local transport depot. All the finished products shall be used within the site for manufacturing the board. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | There will be temporary influx of 50 nos. per day of labour for installing the unit.
During operational phase, permanent influx of people there in the form of employment generation of about 30 people which will come from other areas. | 1.29 | Introduction of alien species? | No | There is no alien species at the proposed site. | 1.30 | Loss of native species or genetic diversity? | No | There shall be no loss of native species or genetic diversity. | 1.31 | Any other actions? | No | None | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | No undeveloped and agriculture land. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | 6 KLD from Ground water. | 2.3 | Minerals (MT) | Yes | Cement, Bricks, some glass, Steel, Iron, and Wood shall be used for manufacturing for installation purposes. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | For construction part, general materials like cement, bricks, aggregates etc. shall be bought from local market. | 2.5 | Forests and timber (source – MT) | Yes | As this is an industrial complex, some wood shall be required in the overall installation. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Total Power Load: 450KW
Source: Punjab Power corporation
D.G. sets capacity for power back-up: Power backup of MDF/HDF plant will be used. Steam requirement: 2 TPH of steam will be required, which will be sourced through existing boiler of MDF/HDF plant & shall be used for process. | 2.7 | Any other natural resources (use appropriate standard units) | No | NA | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Several named chemicals as per MSIHC 1989 shall be used in the manufacturing of synthetic resin in the plant, there include Formaldehyde, urea, melamine and some minor additives which shall be kept as per norms and storage/ approval shall be done in compliance to MSIHC 1989. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable drainage and waste management measures shall be adopted. No occurrence of Diseases is anticipated. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | This project is backward integration of the existing MDF/ HDF manufacturing facility and thus will promote the agro based sector of the area. Project shall employ local people in the industry and provide benefits under CER etc. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not envisaged | 3.5 | Any other causes | No | None | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal solid waste: Total 4.5 kg/day Municipal solid waste will be generated out of which 2.7 kg/day of Bio-Degradable waste will be disposed by vermi-composting, Recyclable Waste of 1.8 Kg/day shall be given to Authorized Recycler. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | No Hazardous waste generation. | 4.4 | Other industrial process wastes | No | None | 4.5 | Surplus product | No | Production will be made with respect to requirement of the interlinked plant production MDF/HDF board. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Existing STP and ETP of MDF unit is in operation and the same shall be utilised for treatment of wastewater from resin plant. Sludges and residues shall be disposed to approved recycler | 4.7 | Construction or demolition wastes | Yes | Construction waste generated will be used to the extent possible. Rest of the waste will be sent to C&D management facility Approved by Punjab pollution Control Board. | 4.8 | Redundant machinery or equipment | No | Not applicable | 4.9 | Contaminated soils or other materials | No | Not applicable | 4.10 | Agricultural wastes | No | Not applicable | 4.11 | Other solid wastes | Yes | Non-Hazardous industrial wastes of 250 Kg/day includes Urea bags, other chemical bags & empty drums. It will be given to authorised recycler. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | Steam and Power backup will be provided by MDF/HDF plant. No major emission is envisaged in the project. | 5.2 | Emissions from production processes | Yes | There shall be appropriate VOC control systems (channelization and chilling system) in the process area including storage (at lower temperatures) ; for emissions of odour/ NH3 in air due to use of Urea, channelization shall be done to avoid fugitive emissions and direct inhalation by workers.
Condenser with kettle will be installed to avoid fugitive emission. | 5.3 | Emissions from materials handling including storage or transport | Yes | Some dust will be generated from the movement of transport vehicles in plant area, although the plant shall have metallic/ cemented internal roads. Area shall be allocated for charging of raw materials. Sprinkling shall be done in areas where there will be necessity of dust suppression. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust is likely to be generated from materials handling including transportation and construction activities. There will be also be NOx and SO2 emissions due to vehicular and machinery operation. Regularly ETP/STP treated water will be sprinkled to suppress dust/ gaseous emissions during this period. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | During loading & unloading of raw material dust is likely to be generated during construction phase. Water will be sprinkled and tarpaulin cover will be provided over stored raw material to reduce dust emission. Proper ducts & vent pipe has been provided in existing ETP to avoid odour. Area will be properly ventilated to avoid the odour. | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | Not applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Procured machinery shall have inbuilt control for noise and vibration. Ear plugs & ear mufflers shall be provided to the workers. | 6.2 | From industrial or similar processes | No | None | 6.3 | From construction or demolition | Yes | Due to the various construction activities there will be short term noise impacts in the immediate vicinity of the project site. | 6.4 | From blasting or piling | No | No blasting or piling will be done. | 6.5 | From construction or operational traffic | Yes | Green belt developed at the periphery of the project site will act as barrier to noise. | 6.6 | From lighting or cooling systems | Yes | From cooling tower, some noise shall be generated. Cooling towers and chiller shall be enclosed in acoustically treated room. | 6.7 | From any other sources | No | None | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Leak proof handling will be practiced including spillage control. To prevent and control risk and damage, all the raw material will be stored in leak proof MS/SS tanks/HDPE bag at a secured and contained location with proper safety measures. MSDS shall be displayed at all the prominent sites. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The unit shall not allow any liquid waste to contaminate the land as there will be proper treatment of water prior to use in gardening and standards shall be met to meet discharge to CETP/ EPA Discharge standards GSR 422 E. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Normally, no polluting air emission is envisaged in the technology; however, Accidental leakage may cause air pollution. | 7.4 | From any other sources | No | None | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | None | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Fire may result into loss of machine and the damage by fire my high economic losses. To prevent and control this loss all the raw material will be stored in leak & fire proof MS/SS tanks/HDPE bags at a secured and contained location with proper firefighting system. Fire system and hydrant will be installing in the premises | 8.2 | From any other causes | No | None | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The area under study falls in Zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The project shall be an integrated unit as a whole as it is part of a manufacturing of board unit. The area is also well developed with small scale factories of wood and furniture and therefore the project shall not change the development pattern of the area. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Proper care shall be taken to avoid any adverse impact on the environment. | 9.3 | Set a precedent for later developments | Yes | The project shall be a part of sustainable development and is particularly important for social development of the area. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | No impact | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Takhni Rehmapur wild life Sanctuary (Draft ESZ notified): 7.18 Km NE (from ESZ boundary).
7.31 km (from boundary of WLS). | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Water Bodies
Mahngarwal Khad: 2.90 Km NNW
River near Bhawani Nagar (Hoshiyarpur Cho): 6.00 Km SSE
River near Khakhli (Amiala Khad): 3.60 Km SE
Chauhalwali Nadi
Kingrwala Cho
Patriarli khad
Patiariwaii Khad
Janauriwali Khad
Rau Nala
Saleranwa Nadi
Chohal Dam
Saleram Dam
Damsal Dam
Protected And Reserve Forest
Chauhal PF
PF near Mukhala
Takhni RF
Rahmanpur RF
Patiyar RF
Husainpur RF
Khepar PF
PF (Khepar & Bhaliala)
Open Shisham PF
Shahzadpur PF
PF Basi Bubu
PF at Thatha | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Takhni Rehmapur wild life Sanctuary (Draft ESZ notified): 7.18 Km NE (from ESZ boundary).
7.31 km (from boundary of WLS). | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | Yes | Himachal Pradesh Boundary: 13.76 Km NE | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Road/ Highways
NH-70: 6.71 Km SE
SH-22: 4.01 Km SW
SH-24: adjacent to Eastern Boundary
Railway Station
Hoshiarpur Railway Station: 8.60 Km SE
Airport
Jalandhar Airport: 41.60 Km SW
Adampur Airport: 20.58 Km SW | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | Yes | Gobindpur Khun Khun 1.32 Km W | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospital
Sood ENT Hospital: 7.35 Km SE
KDM Multispeciality Hospital: 5.94 Km SE
Saini Hospital & Test Tube baby Centre: 7.41 Km SE
Post Office
Nearest P.O.(Gobinpur KhunKhun)
Model Town Post Office
Post Office Bhawani Nagar
Post office Bahadurpur
Place of Worship
Mandir at Dholowal
Peer Worship Place
Gurudwara Niazian
Gurudwara Bhikowal
School
Woodland Overseas School
Takshila School
Baba Manjh Convent Collage
Banks
State Bank of India
Axis Bank Ltd.
ICICI Bank Hoshia | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project area falls in seismic zone –IV. | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
EDS reply |
| | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 10 Apr 2019 | 2. | NA | Please see whether the proposed activity falls under 'small units' considering the water/fuel requirement, and submit accordingly | 03 Apr 2019 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Bhupinder | Designation | FactoryManager | Name of Company (Applicant Name should not be given here) | CENTURY PLYBOARDS INDIA LTD | Address | Century House, P15/1, Taratala Road |
|
|