APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Nowrozabad West Colliery | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MP/CMIN/81996/2018 | Project Cost | 2100 lacs | |
| 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 0.45 ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 1272.163 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Nowrozabad Tehsil of Umaria District Madhya Pradesh Latitude : 20°20’55” N - 23°22’08” N Longitude : 80°57’18” E - 81°01’23” E | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Covered in Toposheet No. 64-E/3 & 64-A/15 of Survey of India.
Scale- 1:50,000 | Town / Village | Kudri, Bahirden, Pinoura, Pipradi, Khodargawan & Devgawan Kala | State of the project | Madhya Pradesh | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Madhya Pradesh | Umaria | Bandhogarh | | 10. | |
Nearest railway station along with distance in kms | Nowrozabad Railway Station, 10 km | Nearest airport along with distance in kms | Jabalpur Airport, 130 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Nowrozabad , 4 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Pinoura - Bahirden, Pipradi, Pinoura, Khodargawan - Uttam Kaul- 8120455426
Nowrozabad Nagar Parishad- Deogawan Kala, Kudri -
Suman Gohatiya- 8120154777 | | 13. | Name of the Applicant | HEMANT | | 14. | Registered Address | Post Box No. 60 | | 15. | |
Address for correspondance: | Name of the Company | SOUTH EASTERN COAL FIELD LTD | Name of the Applicant | HEMANT | Designation (Owner/ Partner/ CEO) | GENERAL MANAGER | Pin code | 484555 | E-mail | noforestjhl.secl@gmail.com | Telephone No. | 7653-268277 | Fax No. | 7653-7653268223 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | Yes | Status | Application for Forest Clearance yet to be submitted | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | Yes | Area of Forest land Involved (hectares) | 404.019 ha. | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Total land involved in the Project (Mining Area) – 1272.163 Ha.
Breakup is as follows:
Land use Mine Area (in Ha)
Tenancy Land 759.482
Govt. Land 108.662
Forest Land 404.019
Total 1272.163 | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Land acquired under MMRD and CBA Act, 1957 | 1.3 | Creation of new land uses? | Yes | This is an underground mine, no major post mining land usages will change.
Total land involved in the Project (Mining Area) – 1272.163 Ha.
Breakup is as follows:
Land use Mine Area (in Ha)
Tenancy Land- 759.482
Govt. Land- 108.662
Forest Land- 404.019
Total - 1272.163 | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Total 40 boreholes were drilled within mine boundary. | 1.5 | Construction works? | No | Construction of the service buildings already completed. | 1.6 | Demolition works? | Yes | As per Final Mine Closure Plan. Progressive mine closure plan has been prepared & duly approved by SECL Board in its 221th meeting on 27.01.2014 | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not Applicable | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | There are only office building/ Infrastructure & service roads | 1.9 | Underground works including mining or tunnelling? | Yes | Underground Mining | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Underground Mining by Bord & Pillar method with SDLs. | 1.14 | Facilities for storage of goods or materials? | Yes | About 2.5 hectare area is used for storage of goods & coal stock. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | i). Underground mine water is being treated in the surface settling tanks and chemical treatment in filter plant. The treated water is being utilized for the drinking purpose, industrial purposes i.e. spraying, plantation & in underground workings.
ii). No solid waste generated. | 1.16 | Facilities for long term housing of operational workers? | Yes | There are old residential colonies in Nowrozabad i.e. Civil Lines, 5 No. colony, Mundi Kholi, Babu Line, Naika Dafai & GM Complex. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Road Network already present, No need of new construction. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | No | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No | 1.20 | New or diverted transmission lines or pipelines? | No | No | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No change in water body at surface. | 1.22 | Stream crossings? | Yes | One seasonal Bichhna Nallah, Kushum Nallah, Sukha Nallah passing through the lease hold area.
All statutory precautions taken as per CMR-2017. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Due to mine activity aquifers will be intersected and inflow of ground water. Total water requirement for the project is 877 KLD to be met by mine water supply. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | No | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Coal transported from underground face to surface bunker through haulages & belt conveyor to coal stock yard. After that coal transported to Nowrozabad railway siding by covered truck/tippers. | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | It will be dealt in final mine closure plan. Progressive Mine Closure plan prepared & approved by SECL Board on 27.01.2014. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | Yes | All Decommissioning of machinery and equipments will be dealt in final mine closure plan. | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Employment : 486 | 1.29 | Introduction of alien species? | No | Not applicable. | 1.30 | Loss of native species or genetic diversity? | No | Not applicable. | 1.31 | Any other actions? | No | Not applicable. | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Agriculture land – 759.482 Ha | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water requirement for the project is 877 KLD (Industrial demand- 417 KLD & Domestic demand: 460 KLD) to be met by mine water supply and to be utilized in sprinkling & other purposes. | 2.3 | Minerals (MT) | Yes | Mineable reserve : 9.91 MT (as on 01.04.2018) | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material will be used in u/g for making sectionalisation/isolation & ventilation stopping &other work etc.
Source of construction materials: Stone crushers and river etc. | 2.5 | Forests and timber (source – MT) | No | Nil | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity: 7215 MWH
Fuel : Diesel &POL -0.017 KL/day | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not Applicable | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not Applicable | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | In residential colony: Soak pits& Septic tanks have been constructed for discharge of domestic effluents. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Generation of Hazardous wastes of
Cat.-5.1- Spent/Used Oil- 0.330 MT/Year
Cat.-5.2- Waste oil sludge- 0.650 MT/Year
(as per hazardous waste authorization issued by MPPCB) | 4.4 | Other industrial process wastes | Yes | Not applicable. | 4.5 | Surplus product | Yes | Not applicable. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sewage disposal system with conventional septic tanks & soak pits in residential colony. | 4.7 | Construction or demolition wastes | Yes | As per Final Mine Closure Plan | 4.8 | Redundant machinery or equipment | Yes | As and when required machinery/equipments to be surveyed off | 4.9 | Contaminated soils or other materials | No | Not applicable. | 4.10 | Agricultural wastes | No | Not applicable. | 4.11 | Other solid wastes | No | Not applicable. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions due to burning of fossil fuels from vehicles/ machinery deployed which is being controlled by water spraying. | 5.2 | Emissions from production processes | Yes | The quantity is insignificant. | 5.3 | Emissions from materials handling including storage or transport | Yes | Release of dust during loading/unloading operations & during transport of coal which is being controlled by water spraying. | 5.4 | Emissions from construction activities including plant and equipment | No | The mine is an old established mine further construction work is not required. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | The generation of coal dust is within permissible limit | 5.6 | Emissions from incineration of waste | No | Not applicable. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable. | 5.8 | Emissions from any other sources | No | Not applicable. | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Operation of mining, CHP vehicles etc. However, noise level is being kept within permissible limits. | 6.2 | From industrial or similar processes | Yes | Noise level is being kept within permissible limits | 6.3 | From construction or demolition | Yes | As per final mine closure plan but will be kept within permissible limits. | 6.4 | From blasting or piling | Yes | Blasting intensity maintained within permissible limits as specified by DGMS. | 6.5 | From construction or operational traffic | Yes | Noise level is being kept within permissible limit. | 6.6 | From lighting or cooling systems | Yes | The quantity is insignificant. | 6.7 | From any other sources | No | Not applicable. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Generation of Hazardous wastes of
Cat.-5.1- Spent/Used Oil- 0.330 MT/Year
Cat.-5.2- Waste oil sludge- 0.650 MT/Year
(as per hazardous waste authorization issued by MPPCB) | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Underground mine water is being treated in the surface settling tanks and filter plant. The treated water is being utilized for the drinking purpose, industrial purposes i.e. spraying & in underground workings. The excess mine water from settling tank is being discharged to the plantation area from where nearby villagers utilized it for irrigation purpose.
Sewage disposal system with conventional septic tanks & soak pits in residential colony. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Fugitive emission into air maintained within prescribed limits. | 7.4 | From any other sources | No | Not Applicable. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Emergency organization plan has been prepared as per stipulation of DGMS.
Hazardous waste rule is being followed. | 8.2 | From any other causes | Yes | 1. Roof fall in u/g
2. Electricity etc.
Code of practice for Emergency organization plan has been prepared as per stipulation of DGMS. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Although the project is not falling under seismically active zone or land slide prone zone. However mine is well equipped to deal with eventuality as enumerated in CMR 1957 and related DGMS circulars. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Project leads to development of ancillary industries & an overall economic growth of nearby towns to supplement the population of the area.
Along with leading to semi urban development in Infrastructure of the towns & supporting mining and other industries. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | Land is used for developing plantation in the depillared area. | 9.3 | Set a precedent for later developments | Yes | Economic development in the entire region leading to overall socio economic growth. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Existing mines have leads to economic development in the region. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Bandharchua RF, Badrehal RF and Chaaja PF, Sohagpur RF, Dhaurai RF & Bansi Dongri RF | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not applicable. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not applicable. | 4 | Inland, coastal, marine or underground waters | No | Not applicable. | 5 | State, National boundaries | Yes | Not applicable. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not applicable. | 7 | Defence installations | No | Not applicable. | 8 | Densely populated or built-up area | Yes | Mining, commercial and residential, establishments of mines of SECL and villages are situated within 10 KM of the mine. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, school, places of worship etc are situated within 10 KM of the mine. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Except for coal reserve, no other high quality reserves encountered. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not applicable | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
| | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | Deferred for additional information | 21 Dec 2018 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | HEMANT | Designation | GENERAL MANAGER | Name of Company (Applicant Name should not be given here) | SOUTH EASTERN COAL FIELD LTD | Address | Post Box No. 60 |
|
|