APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s 1x800MW Pit Head Ultra Supercritical Thermal Power Plant, by MAHAGENCO.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/THE/73481/2018
Project Cost 601900000 lacs
2.
S. No. in the schedule1(d) Thermal Power Plants
Project Sector Thermal Projects
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 1x800MW Pit Head Ultra Supercritical Thermal Power Plant ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 00 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage : Heoti, Tehsil : Umred, District : Nagpur, State : Maharashtra
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.The proposed site is mined area which was back filled over a period 30 years.
Town / VillageHeoti, tehsil-Umred, district - Nagpur
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraNagpurUmred
10.
Nearest railway station along with distance in kms Umred, 6 km
Nearest airport along with distance in kms Nagpur, 33 km
11. Nearest Town/City/District Headquarters along with distance in kms Umred , 5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gram panchayat: Heoti
13. Name of the Applicant Nitin
14. Registered Address PRAKASHGAD,PLOT NO G-9,SECOND FLOOR,BANDRA(EAST),MUMBAI-400051
15.
Address for correspondance:
Name of the Company Maharashtra State Power Generation Company Limited CIN-U40100MH2005SGC153648
Name of the Applicant Nitin
Designation (Owner/ Partner/ CEO) CGM
Pin code 400051
E-mail cgmenvsafe@mahagenco.in
Telephone No. 22-26582424
Fax No. 22-26477273
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed project site is mined area which was back filled over a period 30 years. This site will be developed for installation of Ultra Supercritical Thermal Power Plant.
1.2 Clearance of existing land, vegetation and buildings? Yes Presently the site is barren Land having natural vegetation.
1.3 Creation of new land uses? Yes Present land will be converted in industrial use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical Investigation for proposed 1x 800MW Ultra Supercritical Pit Head Thermal Power Plant has been carried out.
1.5 Construction works? Yes Construction of Office building, Ash pond, Boiler, Turbine House, Water reservoir, DM Plant, Conveyor system for coal transfer. Cooling Tower, Power Transmission Greed, Silos for ash collection etc. are proposed.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary shed with sanitation facility will be developed for workers.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Boiler, Turbine House, Conveyor system. Power Transmission Greed , Silos for Fly Ash etc.
1.9 Underground works including mining or tunnelling? No Not applicable.
1.10 Reclamation works? No Not applicable.
1.11 Dredging? No Not applicable.
1.12 Offshore structures? No Not applicable.
1.13 Production and manufacturing processes? Yes 1x 800 MW Ultra Supercritical Pit Head Thermal Power Plant
1.14 Facilities for storage of goods or materials? Yes The coal stock yard storage area, Raw water reservoir, Ash Pond and silos for fly ash will be provided in the project site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Effluent- Oily Waste Method of Treatment -Tilted Plate interceptor, oil skimmer to bring down the treated water Effluent-Chemical contaminated waste Treatment- Neutralisation in a neutralising pit to bring the pH to acceptable levels. Effluent-Sewage Treatment-Sewage treatment Plant where that sewage is large and localised anaerobic treatment where generation of sewage is limited. Effluent-Industrial waste with high suspended solid levels Treatment:Treatment through Tilted Plate Interc
1.16 Facilities for long term housing of operational workers? Yes Will be located adjacent to WCL Township Area.
1.17 New road, rail or sea traffic during construction or operation? Yes Road traffic will be increased during operation of plant. Existing road network is sufficient to handle the traffic.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes Construction of conveyor system from Umred and 3 others mine to 1x800MW Ultra Super Critical Pit Head Thermal power plant. Total length of conveyor will be 4Km.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable, as no existing public transport route will be diverted or affected due to proposed power plant.
1.20 New or diverted transmission lines or pipelines? Yes New 20 Km Power transmission line will be laid down for electrical power distribution from power generation plant to evacuation point.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable. Ground water level may be increased due to construction of raw water reservoir for power generation project.
1.22 Stream crossings? Yes Amb river is passing through project site. it will not be crossed or diverted.
1.23 Abstraction or transfers of water from ground or surface waters? Yes The required plant water for the proposed plant will be the treated waste water from Nagpur city which is at distance of 45 km. As an alternate, the water from the Goshikhurd dam at a distance of nearly 56 km is also considered.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Detail hydrology and hydrogeological study will be carried out.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Local laborers will be employed in construction phase. The construction material from local suppliers.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Local worker during construction and operation phase. About 900 no. of people will get direct and contractual employment during operation phase. About 1000 people will be engaged during construction phase.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The proposed project site is mined area which was back filled over a period 30 years. This site will be developed for industrial use.
2.2 Water (expected source & competing users) unit: KLD Yes 17.87 Million Cubic meter Per Annum (54151.51KLD) Source: Treated Waste Water from Nagpur Municipal Corporation or from Gosekhurd dam as an alternative source.
2.3 Minerals (MT) Yes Coal 3.68 Million Tons Per Annum (11847 TPD) Source: Form Dinesh, Unrer,MKD-1 and Gokul area of WCL coal Mine. In worst case when GCV of coal is 3000 Kcal/kg the requirement will be 4.17 MTPA.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Stone, sand, Steel, Cement etc. will be required. Quantity will be finalized after detailed drawing.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes During construction phase DG set will be used for emergency work during power failure. A power for construction work will be source from MSEDCL. During operation phase electrical energy from power generation plant will be used for auxiliary consumption.
2.7 Any other natural resources (use appropriate standard units) No Nil
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes LDO, FO, Chemical used in DM Plant Oxygen Cylinder, Chorine etc.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not envisaged.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The proposed project will provide additional employment opportunity and infrastructure development in the nearby areas. It will improve the living condition of the people in nearby areas.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Ash: 6042 TPD Fly ash will be sold to cement plant and bottom ash will be disposed in ash pond.
4.2 Municipal waste (domestic and or commercial wastes) Yes STP will be provided. The treated water will be used for horticulture.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Transformer Oil, Machined used oil a Sludge during LDO & FO Tank cleaning. It will be handover to MPCB registered vendors for disposal.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage sludge from STP will be used as manure for plantation.
4.7 Construction or demolition wastes Yes Will be used for making working area, fencing etc.
4.8 Redundant machinery or equipment No Not applicable.
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emission of Particulate Matter, SO2, NOx. ESP and Chimney with appropriate height will be provided as per Standards. FGD will be installed to control SO2. Proper Bag filter and other appropriate equipment’s will be installed at Coal crusher to control emission. Dust suppression will be controlled by installing mist type foggers at CHP, AHP, Rain Gun at Coal stack area, Ash Bund, internal roads to control fugitive emission.
5.2 Emissions from production processes Yes Emission of Particulate Matter, SO2, NOx. ESP and Chimney with appropriate height will be provided as per standard. FGD will be installed to control SO2.
5.3 Emissions from materials handling including storage or transport Yes Fugitive emission is envisaged due to handling of coal and ash. Water Sprinkler will be provided to control the emission.
5.4 Emissions from construction activities including plant and equipment Yes During Construction phase due to transportation of heavy vehicles, operation of equipments and construction machineries.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Solid waste & Liquid waste are envisaged during construction period
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated from turbine Water pump house, Crusher, Blower and motors. All noise producing equipment will be maintained as per standard CPCB norms. Noise will be exist the prescribed CPCB standards.
6.2 From industrial or similar processes Yes The noise level generated will be in the range of 70-90 dB (A) at1 m from source.
6.3 From construction or demolition Yes Due to operation of heavy machineries during construction.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Due to movement of heavy vehicles.
6.6 From lighting or cooling systems Yes Heat from Boiler house and pipes carrying steam, Steam water condenser. All equipment will be properly insulated.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Due to storage of FO, Diesel etc. Proper care will be taken as per standard process.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes STP will be provided for domestic waste. ETP will be provided for treatment of effluent from power plant.
7.3 By deposition of pollutants emitted to air into the land or into water Yes ESP and FGD proposed to minimize the concentration of source emission.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Fire in coal storage area, FO and LDO Storage tank. Well design fire hydrant system and firefighting equipment will be provided at required areas.
8.2 From any other causes Yes Electrification from Transformer Yard, or from Power transmission line. The entry in this area will be prohibited and monitored by Safety and Operation officer. Permit system will be followed for this area.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes On-Site DMP will be prepared. Proper precaution will be taken to handle such situation.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes • This project will provide additional infrastructure to nearby area. • Demand for rented house will be increased. • Possibilities of ancillary industries will be increased. • Possibilities of ancillary industries will be increased. • This project will generate direct and indirect employment for nearby villages.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not anticipated.
9.3 Set a precedent for later developments Yes Ancillary industries might be developed as a consequence
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Anticipated
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Muniya Reserved Forest : 6.0 km (SW) Bhivapur Reserved Forest : 7.0 km (NW) Chichla Reserve Forest : 10 Km (S) Ranbori Reserve Forest (Karhandla Wildlife sanctuary) : 10.30 Km (E)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable.
4 Inland, coastal, marine or underground waters No Not Applicable.
5 State, National boundaries No Not Applicable.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable.
7 Defence installations No Not Applicable.
8 Densely populated or built-up area Yes Umred 5 Km SE
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospital, schools, colleges and place of worship are situated at a distance of 5 km.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Amb River: Through project site Pandharboli Talav: 5.0 km (S) Umred Lake : 4.5 Km (ESE) Makardhokra Reservoir: 5.5 Km (W) Paradgaon Lake: 7.0 Km : (NW) Ukkarwahi Talav: 8.0 km (NW) Undri Nadi: 7.5 km (NE) Khapri Talav: 12.0 Km (NW) Kalandri Talav: 11.0 Km (N) Kolarmet Talav: 12.0 Km (N) SonegaonTalav: 12.5 Km (N) Botejhari Talav : 14.0 km (SSE) Mangli Talav : 15.0 Km (NW)
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Zone III (Moderate)
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
Additional Attachments, if any
Attached File
ADS Letter
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Raise LetterSub-Committee will make conduct site visit. Accordingly project is deferred 08 May 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantNitin
DesignationCGM
Name of Company (Applicant Name should not be given here)Maharashtra State Power Generation Company Limited CIN-U40100MH2005SGC153648
AddressPRAKASHGAD,PLOT NO G-9,SECOND FLOOR,BANDRA(EAST),MUMBAI-400051
Print