APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed establishment of Synthetic Organic Chemicals Manufacturing Facility By Aarav Fragrances & Flavors Pvt. Ltd. at Gut No./ Survey No.: 150, 151, 166 to 172 of village Lakhmapur and Gut No./ Survey No. 239A, 242, 286 (Part), 287 (Part), 289 (Part), 290(2), 291 (Part), 292 to 296 of village Jamghar, Taluka Wada, District Palghar | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/94966/2019 | Project Cost | 2000 lacs | |
| 2. | |
S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Plot area: 97,750 sq. m ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 70 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Gut No./ Survey No.: 150, 151, 166 to 172 of village Lakhmapur and Gut No./ Survey No. 239A, 242, 286 (Part), 287 (Part), 289 (Part), 290(2), 291 (Part), 292 to 296 of village Jamghar, Taluka Wada, District Palghar | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Gut No./ Survey No.: 150, 151, 166 to 172 of village Lakhmapur and Gut No./ Survey No. 239A, 242, 286 (Part), 287 (Part), 289 (Part), 290(2), 291 (Part), 292 to 296 | Town / Village | Jamghar & lakhmapur | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Palghar | Vada | | 10. | |
Nearest railway station along with distance in kms | Atgaon, 25 km | Nearest airport along with distance in kms | Mumbai International Airport, 61 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Wada , 7.4 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Jamghar & lakhmapur | | 13. | Name of the Applicant | Shailesh | | 14. | Registered Address | Gut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur,
Tal. Wada, District: Thane- Maharashtra. | | 15. | |
Address for correspondance: | Name of the Company | AARAV FRAGRANCES & FLAVOURS PVT. LTD. | Name of the Applicant | Shailesh | Designation (Owner/ Partner/ CEO) | Senior Manager Chemicals | Pin code | 400604 | E-mail | shailesh.deshmukh@aarav.co | Telephone No. | 022-41130206 | Fax No. | 022-25827419 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | Yes | Status | Wildlife Clearance Under Process | MoEF file number | FP/MH/IND/1665/2017 | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The proposed establishment project site is located within existing facility, which is designed for industrial purpose only. There would be no change in Land Use, Land Cover or Topography of plot. | 1.2 | Clearance of existing land, vegetation and buildings? | No | No vegetation in the area of proposed activity. Green belt area will be developed within plot. | 1.3 | Creation of new land uses? | No | Proposed project will be established within site. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Will be done as required. | 1.5 | Construction works? | Yes | Proposed project will be established within the plot. | 1.6 | Demolition works? | No | Not applicable. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not applicable. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Plot plan layout is given in pre- feasibility report. | 1.9 | Underground works including mining or tunnelling? | No | Not applicable. | 1.10 | Reclamation works? | No | Not applicable. | 1.11 | Dredging? | No | Not applicable. | 1.12 | Offshore structures? | No | Not applicable. | 1.13 | Production and manufacturing processes? | Yes | Please refer pre-feasibility report. | 1.14 | Facilities for storage of goods or materials? | Yes | Storage facility for products and raw materials shall be provided within the existing premises.
All chemicals/raw materials/products will be stored in drums/tanks and warehouse with adequate safety measures. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Hazardous waste will be disposed of as per hazardous waste rule, 2016.
Treated effluent will be recycle back. Unit will maintain Zero Liquid Discharge facility. | 1.16 | Facilities for long term housing of operational workers? | No | No on-site housing of operational workers is envisaged. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not applicable. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Site is well connected by road and railway. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable. | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable. | 1.22 | Stream crossings? | No | Not applicable. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water will be sourced from existing Bore well & dug well. NOC from CGWA received for Ground water withdrawal (ref Letter No. 21-4(211)/ CR/CGWA/ 2015-2297 dated 11th December 2018) | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Treated effluent shall be recycle. Unit will maintain Zero Liquid discharge facility. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Local laborers would be employed during construction phase. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable. | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Not applicable. | 1.29 | Introduction of alien species? | No | Not applicable. | 1.30 | Loss of native species or genetic diversity? | No | Not applicable. | 1.31 | Any other actions? | No | Not applicable. | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Not applicable. Proposed project will be established within existing manufacturing facility. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Source: Ground water withdrawal
Total fresh water requirement: 115.5 cmd | 2.3 | Minerals (MT) | No | Not applicable. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction material will be sourced from local area. | 2.5 | Forests and timber (source – MT) | No | Not applicable. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity requirement: 500 KVA,
DG sets: 500 KVA & 160 KVA each,
Fuel:
Bio-briquettes: 27 TPD OR
Agricultural Waste: 27 TPD OR
Furnace oil: 12.5 TPD | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Chemicals will be stored/ handled according to respective MSDS. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not applicable. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Due to project, employment to the local resident will be provided which can result in upgrading the living standard of people. Positive impact on the social and economic status of local people due to direct and indirect employment opportunities. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable. | 3.5 | Any other causes | No | Not applicable. | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal Waste will be disposed as per norms. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Hazardous waste will be handled and disposed as per HW Rules, 2016. | 4.4 | Other industrial process wastes | No | Not applicable. | 4.5 | Surplus product | No | Not applicable. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from ETP shall be handled as per HW rules 2016 | 4.7 | Construction or demolition wastes | Yes | Construction waste will be disposed off as per norm | 4.8 | Redundant machinery or equipment | No | Not applicable. | 4.9 | Contaminated soils or other materials | No | Not applicable. | 4.10 | Agricultural wastes | No | Not applicable. | 4.11 | Other solid wastes | No | Not applicable. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | SO2, NOx, and PM Emission are envisaged from fuel burning sources. Scrubber will be provided to scrub emissions with adequate stack height. | 5.2 | Emissions from production processes | Yes | Emission from Process will be scrubbed by installing scrubber and maintained within the stipulated limits by CPCB/ MPCB. | 5.3 | Emissions from materials handling including storage or transport | Yes | Liquid will be stored & handled in closed operation method. Negligible amount of emissions would be generated during storage/ transport of material. The same will be taken care off through ID fans / scrubbers proposed to be installed at site. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Particulate matter is expected from construction activities. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Not applicable. | 5.6 | Emissions from incineration of waste | No | Not applicable. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable. | 5.8 | Emissions from any other sources | No | Not applicable. | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise generating equipment’s will be provided with acoustic enclosures to ensure compliance with CPCB/ MPCB standards. | 6.2 | From industrial or similar processes | Yes | Noise generating equipment’s will be provided with acoustic enclosures to ensure compliance with CPCB/ MPCB standards. | 6.3 | From construction or demolition | Yes | During the construction work noise would be generated which will be temporary in nature. Workers getting exposed would be provided with PPE. | 6.4 | From blasting or piling | No | Not applicable. | 6.5 | From construction or operational traffic | No | Noise from traffic will not have much impact on the work environment of the project site. | 6.6 | From lighting or cooling systems | No | Not applicable. | 6.7 | From any other sources | No | Not applicable. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Closed handling practices, dyke wall will be provided to avoid spillage / leakage of Hazardous Chemicals. Routine monitoring of chemical storage area will be done to check leakages to avoid contamination with water, air, soil etc. Storage of chemicals in tank farms and warehouse with adequate safety features, and proper dyke enclosures will be provided as per industrial norms. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of sewage or other effluents on land. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Air Pollution Control equipment will be provided at source to prevent emissions in air. | 7.4 | From any other sources | No | Not applicable. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Proper safety measures will be taken to avoid any accident in the plant and fuel Storage Yard or Chemical Storage Yard or any other area in plant. Fire-Fighting Training will be provided to workers. An ‘On-site Emergency Plan’ will be prepared and will be implemented for any emergency situation. Fire protection measures will be carried as per statutory requirements. | 8.2 | From any other causes | No | Not applicable. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The project will be designed by taking into consideration these factors as per relevant codes and standards. DMP will be prepared and executed in case of any such eventualities. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | Not applicable. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not applicable. | 9.3 | Set a precedent for later developments | No | Not applicable. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not applicable. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Project is located at 5.8 km from Tansa WLS Protected area boundary & 1.46 km from boundary of proposed Eco sensitive zone for Tansa WLS as per draft ESZ Notification No. SO 2566 (E) on 10th August 2017 | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Vaitarna river- 3 km to North, Manichi river- 5.9 km to North west, Mokhai river- 3 km to South,
Dhandela river- 2 km to North | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not applicable. | 4 | Inland, coastal, marine or underground waters | Yes | Vaitarna river- 3 km to North, Manichi river- 5.9 km to North west, Mokhai river- 3 km to South,
Dhandela river- 2 km to North | 5 | State, National boundaries | Yes | Not applicable. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Bhiwandi Wada road | 7 | Defence installations | No | Not applicable. | 8 | Densely populated or built-up area | Yes | Wada about 7.4 km | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Wada about 7.4 km, Carved stones, Wada- 7.16 km to North East, Parshuram Temple, Gunj- 7.96 km to South West | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not applicable. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not applicable. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not applicable. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Shailesh | Designation | Senior Manager Chemicals | Name of Company (Applicant Name should not be given here) | AARAV FRAGRANCES & FLAVOURS PVT. LTD. | Address | Gut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur,
Tal. Wada, District: Thane- Maharashtra. |
| |
|