S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Development of POL Installation at Rasayani
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/92406/2019
Project Cost 40000 lacs
2.
S. No. in the schedule6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 184870.8 KL ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 00 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
a) Protected areas notified under the wildlife (Protection) Act, 1972
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectRasayani
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Village Turade : Survey No. 38/7,58/21,58/20,44/1(p),44/2 (p),44/22(p),58/18, 58/17,58/16 ,43,58/15,58/14/A,53,52,58/26/1 (p),54/2(p),54/3(p),54/5(p),54/4(p),54/6,47/1,47/2,45/3,45/4,46,45/1,55/1,55/6,55/7,58/12,61/1,58/7,58/9,58/11,60,68/1(p),68/2,68/3,61/2,62/1,61/1,58/13,69 etc. Village Posari : Survey No. 39/1,39/2(p),39/3,39/9(p),38/1/A,38/2(p),38/3,82/3(p),82/5,82/6,82/4,37/1/A,37/2,37/3/A,37/4/A,33/1(p),36/1(p),36/2,35/1,34/2(p),80/1/A,80/2/A,90/1(p),90/2(p),89/3,89/2(p),89/4/A,89/1,88/1(p),88/3(p) etc.
Town / VillageTurade , Posari
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRaigadPanvel
10.
Nearest railway station along with distance in kms Rasayani Railway Station, 0.05 km
Nearest airport along with distance in kms Mumbai Airport, 37.00 km
11. Nearest Town/City/District Headquarters along with distance in kms Panvel , 10.5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Development Authority for the area are : CIDCO (NAINA) 61, Sakal Bhavan Road, Sector 11, CBD Belapur, Navi Mumbai, Maharashtra 400614
13. Name of the Applicant Abhishek
14. Registered Address Bharat Bhavan 1, 3rd Floor 4&6 Currimbhoy Road Ballard Estate, Mumbai
15.
Address for correspondance:
Name of the Company BHARAT PETROLEUM CORPORATION LIMITED RASAYANI
Name of the Applicant Abhishek
Designation (Owner/ Partner/ CEO) Head Infra Task Force West & South
Pin code 400001
E-mail abhisheksingh@bharatpetroleum.in
Telephone No. 22-22713374
Fax No. 22-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No
1.2 Clearance of existing land, vegetation and buildings? Yes Very few tree cutting may be required, necessary NOC/Approvals will be obtained from the authority.
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil Investigation shall be carried out prior to construction
1.5 Construction works? Yes Construction of HSD, MS, SKO, Bio-Diesel and Ethanol storage tanks etc. and related buildings and amenities, compound wall etc
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? No No housing of construction worker envisagesd as Local manpower is proposed to be deployed for the proposed project.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes The land development activity will be carried out . Excavation & Filling for facilities of Storage, Amenity buildings, compound walls etc are involved.
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? No
1.14 Facilities for storage of goods or materials? Yes Construction of White Oil (HSD, MS, SKO, Bio-Diesel , Ethanol etc.) storage tanks etc.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste: • Office waste like paper etc is expected. • Packing Material will be disposed per MSW Rules Hazardous waste, if any, • Used Lubricating Oil shall be sent to authorized vendor for disposal Domestic waste: • Septic Tank along with soak pit Effluent: • Oil Water Seperator & ETP will be provided.
1.16 Facilities for long term housing of operational workers? No No housing of construction worker envisagesd as Local manpower is proposed to be deployed for the proposed project.
1.17 New road, rail or sea traffic during construction or operation? Yes Spur line will be provided to existing Panvel-Roha railway line for development of Railway loading siding for dispatch/transportation of POL products.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes Spur line will be provided to existing Panvel-Roha railway line for development of Railway loading siding for dispatch/transportation of POL products.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? No
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction materials will be transported through tarapaulin covered vehicles. Road network exists, nearest road is Dand Apta Road –Approx. 0.10 km. Transportation of POL Products will be done through road and railway network ( which will be constructed in the proposed project area.)
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? No
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No
2.2 Water (expected source & competing users) unit: KLD Yes Water will be sourced from MIDC, Approx. 20 KLD
2.3 Minerals (MT) No
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Locally available construction materials like cement, sand, grit, bricks, steel will be used.
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power Source: Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Power requirement: approx. 1000 KVA at 33/22KV, HT Incoming supply will be sourced from State Electricity Board. DG Sets: 1x750 KVA
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Storage and distribution of White Oil petroleum products i.e. MS, Ethanol , SKO, HSD, Biodiesel etc is involved.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? No
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic sewage shall be treated in septic tank and disposed off through soak pit
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous waste will be generated from Spent oil from DG sets, greases , cotton waste, paint residue, sludge from cleaning of Storage tanks will be disposed off through approved agency of MPCB. Other waste will be stored in MS drums & sent to authorized re processors.
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes The sludge generated due to oil water separator & ETP will be disposed off through approved agency of MPCB.
4.7 Construction or demolition wastes Yes The construction waste shall involve remains of construction material which will be disposed as per PCB standards.
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes During construction phase/operation phase use of DG sets is envisaged, adequate stack height as per CPCB norms will be provided to minimize the pollution levels.
5.2 Emissions from production processes No
5.3 Emissions from materials handling including storage or transport Yes The project may cause airborne dust during construction. Precautions would be taken to reduce dust generation during construction phase: Maximum use of RMC will minimize the handling of cement, sand and concrete thus dust emission will be minimized. Water sprinkling will be done at regular intervals to reduce the airborne dust
5.4 Emissions from construction activities including plant and equipment Yes The project may cause airborne dust during construction. Precautions would be taken to reduce dust generation during construction phase: Maximum use of RMC will minimize the handling of cement, sand and concrete thus dust emission will be minimized. Water sprinkling will be done at regular intervals to reduce the airborne dust.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Use of acoustic type DG set and air compressor, certified pumps, fire water pumps to ensure minimum noise generation / vibration
6.2 From industrial or similar processes No
6.3 From construction or demolition Yes During temporary phase of construction noise may be generated due to movement of heavy equipment. Due to arc welding process for construction of tanks ,some light & heat too may be generated. The construction area shall be barricaded properly.
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes Insignificant increase in noise may be observed due to construction activities & movement of tank lorries during operation phase.
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Impervious dyke will be constructed in the tank farm area.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage shall be taken to septic tank and soak pit and periodic cleaning will be done
7.3 By deposition of pollutants emitted to air into the land or into water No
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Facilities will conform to standards laid by Petroleum & Explosives Standards Organization (PESO)/Oil Industry Safety Directorate(OISD) to ensure safety of the installation against fire/explosion, spillage etc. Installation will be well equipped to protect men, materials and Environment
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The proposed site is located in seismic zone III as per IS:1893 and all designs will be as per IS code
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Existing infrastructure facilities like power line, road etc are sufficiently developed in the area for proposed project.
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Karnala Wildlife Sanctuary - Approx 0.24 Km (W)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes 1. Reserved Forests near Kaire - 1.00 KM 2. Reserved Forests near jambhivali Village- 3.00 km 3. Reserved Forests near Chavane Village - 3.50 Km 4. Reserved Forests near Ladivali Village - 1.70 Km 5. Reserved Forests near Akulwadi Village - 1.70 Km 6. Reserved Forests Karnala - 2.00 Km. 7. Reserved Forests near Devloli- 0.60 Km 8. Reserved Forests near Ambivali Village -0.85 Km 9. Reserved Forests near Bhokarpada - 5.75 Km
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Karnala Wildlife Sanctuary - Approx 0.24 Km (W)
4 Inland, coastal, marine or underground waters Yes Morbe Dam -9.25 Km Nadhal Lower Dam-7.35Km Chowk Pond-8.40 Km Patalganga River-0.60 Km Kirki River - 7.70 Km Jambivali Dam - 5.50 Km Ransai Reservoir- 7.50 Km Lake Near Sangurli Village -5.15 Km Lake Near Shirdhon Village -4.10 Km Lake Near Dahivali Panvel -3.60 Km Lake Near Bherle Village -7.35 Km Chikhale Village Lake-8.55 Km Manikgad Fort-8.00 Km Usaran Lake-1.00 Km
5 State, National boundaries Yes
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area No
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Pillai college of Engineering
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAbhishek
DesignationHead Infra Task Force West & South
Name of Company (Applicant Name should not be given here)BHARAT PETROLEUM CORPORATION LIMITED RASAYANI
AddressBharat Bhavan 1, 3rd Floor 4&6 Currimbhoy Road Ballard Estate, Mumbai
Print