APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Development of POL Installation at Rasayani | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/92406/2019 | Project Cost | 40000 lacs | |
| 2. | |
S. No. in the schedule | 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 184870.8 KL ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 00 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | Yes | a) | Protected areas notified under the wildlife (Protection) Act, 1972 | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Rasayani | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Village Turade : Survey No. 38/7,58/21,58/20,44/1(p),44/2 (p),44/22(p),58/18, 58/17,58/16 ,43,58/15,58/14/A,53,52,58/26/1 (p),54/2(p),54/3(p),54/5(p),54/4(p),54/6,47/1,47/2,45/3,45/4,46,45/1,55/1,55/6,55/7,58/12,61/1,58/7,58/9,58/11,60,68/1(p),68/2,68/3,61/2,62/1,61/1,58/13,69 etc.
Village Posari : Survey No. 39/1,39/2(p),39/3,39/9(p),38/1/A,38/2(p),38/3,82/3(p),82/5,82/6,82/4,37/1/A,37/2,37/3/A,37/4/A,33/1(p),36/1(p),36/2,35/1,34/2(p),80/1/A,80/2/A,90/1(p),90/2(p),89/3,89/2(p),89/4/A,89/1,88/1(p),88/3(p) etc. | Town / Village | Turade , Posari | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Raigad | Panvel | | 10. | |
Nearest railway station along with distance in kms | Rasayani Railway Station, 0.05 km | Nearest airport along with distance in kms | Mumbai Airport, 37.00 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Panvel , 10.5 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Development Authority for the area are :
CIDCO (NAINA)
61, Sakal Bhavan Road, Sector 11, CBD Belapur, Navi
Mumbai, Maharashtra 400614 | | 13. | Name of the Applicant | Abhishek | | 14. | Registered Address | Bharat Bhavan 1, 3rd Floor
4&6 Currimbhoy Road
Ballard Estate, Mumbai | | 15. | |
Address for correspondance: | Name of the Company | BHARAT PETROLEUM CORPORATION LIMITED RASAYANI | Name of the Applicant | Abhishek | Designation (Owner/ Partner/ CEO) | Head Infra Task Force West & South | Pin code | 400001 | E-mail | abhisheksingh@bharatpetroleum.in | Telephone No. | 22-22713374 | Fax No. | 22- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Very few tree cutting may be required, necessary NOC/Approvals will be obtained from the authority. | 1.3 | Creation of new land uses? | No | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil Investigation shall be carried out prior to construction | 1.5 | Construction works? | Yes | Construction of HSD, MS, SKO, Bio-Diesel and Ethanol storage tanks etc. and related buildings and amenities, compound wall etc | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No housing of construction worker envisagesd as Local manpower is proposed to be deployed for the proposed project. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | The land development activity will be carried out . Excavation & Filling for facilities of Storage, Amenity buildings, compound walls etc are involved. | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | No | | 1.14 | Facilities for storage of goods or materials? | Yes | Construction of White Oil (HSD, MS, SKO, Bio-Diesel , Ethanol etc.) storage tanks etc. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid Waste:
• Office waste like paper etc is expected.
• Packing Material will be disposed per MSW
Rules
Hazardous waste, if any,
• Used Lubricating Oil shall be sent to
authorized vendor for disposal
Domestic waste:
• Septic Tank along with soak pit
Effluent:
• Oil Water Seperator & ETP will be provided. | 1.16 | Facilities for long term housing of operational workers? | No | No housing of construction worker envisagesd as Local manpower is proposed to be deployed for the proposed project. | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | Spur line will be provided to existing Panvel-Roha railway line for development of Railway loading siding for dispatch/transportation of POL products. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | Yes | Spur line will be provided to existing Panvel-Roha railway line for development of Railway loading siding for dispatch/transportation of POL products. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction materials will be transported through tarapaulin covered vehicles. Road network exists, nearest road is Dand Apta Road –Approx. 0.10 km. Transportation of POL Products will be done through road and railway network ( which will be constructed in the proposed project area.) | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | No | | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water will be sourced from MIDC, Approx. 20 KLD | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Locally available construction materials like cement,
sand, grit, bricks, steel will be used. | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power Source: Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
Power requirement: approx. 1000 KVA at 33/22KV, HT Incoming supply will be sourced from State Electricity Board.
DG Sets: 1x750 KVA | 2.7 | Any other natural resources (use appropriate standard units) | No | | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Storage and distribution of White Oil petroleum products i.e. MS, Ethanol , SKO, HSD, Biodiesel etc is involved. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic sewage shall be treated in septic tank and
disposed off through soak pit | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Hazardous waste will be generated from Spent oil from DG sets, greases , cotton waste, paint residue, sludge from cleaning of Storage tanks will be disposed off through approved agency of MPCB. Other waste will be stored in MS drums & sent to authorized re processors. | 4.4 | Other industrial process wastes | No | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The sludge generated due to oil water separator & ETP will be disposed off through approved agency of MPCB. | 4.7 | Construction or demolition wastes | Yes | The construction waste shall involve remains of
construction material which will be disposed as per PCB standards. | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | During construction phase/operation phase use of DG sets is envisaged, adequate stack height as per CPCB norms will be provided to minimize the pollution levels. | 5.2 | Emissions from production processes | No | | 5.3 | Emissions from materials handling including storage or transport | Yes | The project may cause airborne dust during construction. Precautions would be taken to reduce dust generation during construction phase:
Maximum use of RMC will minimize the handling of cement, sand and concrete thus dust emission will be minimized.
Water sprinkling will be done at regular intervals to reduce the airborne dust | 5.4 | Emissions from construction activities including plant and equipment | Yes | The project may cause airborne dust during construction. Precautions would be taken to reduce dust generation during construction phase:
Maximum use of RMC will minimize the handling of cement, sand and concrete thus dust emission will be minimized.
Water sprinkling will be done at regular intervals to reduce the airborne dust. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Use of acoustic type DG set and air compressor, certified pumps, fire water pumps to ensure minimum noise generation / vibration | 6.2 | From industrial or similar processes | No | | 6.3 | From construction or demolition | Yes | During temporary phase of construction noise may be generated due to movement of heavy equipment. Due to arc welding process for construction of tanks ,some light & heat too may be generated. The construction area shall be barricaded properly. | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | Insignificant increase in noise may be observed due to construction activities & movement of tank lorries during operation phase. | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Impervious dyke will be constructed in the tank farm area. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Sewage shall be taken to septic tank and soak pit and periodic cleaning will be done | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Facilities will conform to standards laid by Petroleum & Explosives Standards Organization (PESO)/Oil Industry Safety Directorate(OISD) to ensure safety of the installation against fire/explosion, spillage etc. Installation will be well equipped to protect men, materials and Environment | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The proposed site is located in seismic zone III as per IS:1893 and all designs will be as per IS code | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | Existing infrastructure facilities like power line, road etc are sufficiently developed in the area for proposed project. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | No | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Karnala Wildlife Sanctuary - Approx 0.24 Km (W) | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | 1. Reserved Forests near Kaire - 1.00 KM
2. Reserved Forests near jambhivali Village- 3.00 km
3. Reserved Forests near Chavane Village - 3.50 Km
4. Reserved Forests near Ladivali Village - 1.70 Km
5. Reserved Forests near Akulwadi Village - 1.70 Km
6. Reserved Forests Karnala - 2.00 Km.
7. Reserved Forests near Devloli- 0.60 Km
8. Reserved Forests near Ambivali Village -0.85 Km
9. Reserved Forests near Bhokarpada - 5.75 Km | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Karnala Wildlife Sanctuary - Approx 0.24 Km (W) | 4 | Inland, coastal, marine or underground waters | Yes | Morbe Dam -9.25 Km
Nadhal Lower Dam-7.35Km
Chowk Pond-8.40 Km
Patalganga River-0.60 Km
Kirki River - 7.70 Km
Jambivali Dam - 5.50 Km
Ransai Reservoir- 7.50 Km
Lake Near Sangurli Village -5.15 Km
Lake Near Shirdhon Village -4.10 Km
Lake Near Dahivali Panvel -3.60 Km
Lake Near Bherle Village -7.35 Km
Chikhale Village Lake-8.55 Km
Manikgad Fort-8.00 Km
Usaran Lake-1.00 Km | 5 | State, National boundaries | Yes | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Pillai college of Engineering | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Abhishek | Designation | Head Infra Task Force West & South | Name of Company (Applicant Name should not be given here) | BHARAT PETROLEUM CORPORATION LIMITED RASAYANI | Address | Bharat Bhavan 1, 3rd Floor
4&6 Currimbhoy Road
Ballard Estate, Mumbai |
| |
|