APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of dye and dyes intermediates from 9MT/M to 675MT/M. by M/s Deepak Chemtex Pvt. Ltd., Survey No. 28/1, Village-Awashi, Lote Parshuram, Tal-Khed, Dist-Ratnagiri, Maharashtra state.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/91851/2019
Project Cost 400.00 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 9 MT/M to 675 MT/M ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 9 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the project28/1, Village Awashi, Lote-Parshuram
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.28/1A
Town / VillageAwashi
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRatnagiriKhed
10.
Nearest railway station along with distance in kms Chiplun, 7 km
Nearest airport along with distance in kms Mumbai Airport, 250 km
11. Nearest Town/City/District Headquarters along with distance in kms Chiplun , 13 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gram Panchyat - Awashi, Tal. Khed, Dist. Ratnagiri Zilla Parishad – Kolhapur.
13. Name of the Applicant Saurabh
14. Registered Address 28/1A, Village Awashi, Lote Parshuram, Tal. Khed, Dist. Ratnagiri
15.
Address for correspondance:
Name of the Company M/S. DEEPAK CHEMTEX PRIVATE LIMITED
Name of the Applicant Saurabh
Designation (Owner/ Partner/ CEO) MD
Pin code 415722
E-mail saurabh@deepakchemtex.in
Telephone No. 02249-247340
Fax No. 02249-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The total area is 10090 m2. The existing built-up area is 1207 m2. A permanent change in the built-up area after the proposed expansion will be additional 1500 m2 thus the total permanent change in land use would be 2707 m2. Laying foundations and installation of machinery.
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Available
1.5 Construction works? Yes Laying foundations and installation of machinery for Expansion activity.
1.6 Demolition works? Yes Retrofitting the existing ETP facilities
1.7 Temporary sites used for construction works or housing of construction workers? No Existing facilities are adequate.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Construction of Structures and foundations associated with the proposed expansion in the manufacturing process.
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes New products are manufactured and existing products quantity shall be increased
1.14 Facilities for storage of goods or materials? Yes Storage room for raw material & finished product, shall be provided
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes 1. Nonhazardous Solid wastes-sold in the open market 2. Hazardous solid waste sent to CHWTSDF (MWML, Mumbai) 3. liquid effluents Neutralized with caustic in the reactors followed by filtering in the filter press followed by pumping into the sump of the evaporative tower and circulated continuously till it is concentrated and salt level reaches 20-30 %. Then taken into to the falling film evaporator, where salts are being concentrated to an extent of 90 to 95%.
1.16 Facilities for long term housing of operational workers? No
1.17 New road, rail or sea traffic during construction or operation? No Internal roads of 6 meter width are available and no additional new construction of roads are required
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes Permission for abstracting groundwater is being applied.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Required Manpower for construction activities are available locally. The raw materials for construction activities are also locally available. Decommissioned material shall be used for filling low lying areas.
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? No Manpower is available locally and thus no influx of people
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No All the land is well developed and there is no agricultural land
2.2 Water (expected source & competing users) unit: KLD Yes Exiting water requirement is 2 Cum/day. The water requirement shall be 20 Cum/day, after expansion, which shall be harvested through existing and proposed Rain Water Harvesting system and permission from CGWA for lifting the groundwater for industrial use is being appilied.
2.3 Minerals (MT) No
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Aggregate – 150 MT Cement – 20MT Steel –12 MT Sand – 70 MT Excavation – 20 m3
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes • At present power, the requirement is 138 KW, which is taken from MSEDC. • After the proposed expansion, power requirement shall be 500 KW. • 1000 KVA transformer and 2x500 KVA DG set for power back-up will be installed at the site.
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Detailed list of products and raw materials are given in the Pre Feasibility Report
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? No Regular health checkups and protective measures are provided
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes 1 MT/Month solid waste which shall be converted to manure and shall be used for green development.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Detailed list of products and raw materials are given in the Pre Feasibility Report
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes o Existing o ETP Sludge – 30 Kg /day () o Process sludge 20 Kg/day o Proposed expansion o Process sludge -190 Kg/day, shall be sent to CHWTSDF. o 3230 Kg/day Manganese carbonate sold to authorized recyclers.
4.7 Construction or demolition wastes Yes • Alternations in foundations and New Foundations for machinery and buildings • Construction/ demolition waste generated would be of small quantity, of around 100 MT, which shall be used for road construction or filling low lying area.
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes • Thermopac of 100000 Kcal/day & 144 Kg/day of LDO fuel (Existing) • 2.0 TPH coal/briquette fired boiler (For proposed expansion)
5.2 Emissions from production processes Yes PM from the boiler.
5.3 Emissions from materials handling including storage or transport Yes Vehicular emissions from construction vehicles, equipment, and fugitive emissions. Traffic discipline shall be maintained and all the vehicles shall be checked regularly for emission tests.
5.4 Emissions from construction activities including plant and equipment Yes Dust shall be controlled by spraying water and closed equipment, to avoid the spread of dust.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is expected due to the handling of construction material
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers No Only during Construction Phase: 1) Construction equipment, 2) Transportation and construction vehicles
6.2 From industrial or similar processes Yes Operation of boiler and boiler auxiliaries, Steam exhaust, Compressors.
6.3 From construction or demolition Yes Operation of concrete mixers
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes 1) Construction Phase- Noise emanating from Vehicles carrying raw material for construction 2) Operation Phase: Noise due to movement of vehicles carrying fuel i.e. Coal
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No At Present, the hazardous waste generated is process waste sludge (20 Kg/day) and ETP Sludge (30 Kg/day), which shall be sent to CHWTSDF, Taloja for disposal in a scientific manner. After the proposed expansion, the quantity of Hazardous waste generated shall be 190 Kg/day. which shall be sent to CHWTSDF. No spillages or leakages.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Zero liquid discharge
7.3 By deposition of pollutants emitted to air into the land or into water No Bag filter with 99.5% efficiency shall be provided.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risk Assessment is done. Personnel protective equipment and preventive measures, as well as control measures, are provided to handle the emergencies
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Vashishti River is 4 km away from industry site
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No National highway is 1.0 Km from the project site.
7 Defence installations No
8 Densely populated or built-up area No
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Vashishti River is 4 km away from industry site
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSaurabh
DesignationMD
Name of Company (Applicant Name should not be given here)M/S. DEEPAK CHEMTEX PRIVATE LIMITED
Address28/1A, Village Awashi, Lote Parshuram, Tal. Khed, Dist. Ratnagiri