(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Dry Vinasse (commercial yeast culture) for Animal ration-480 MT/M & Vinasse Enrich with molasses for Animal ration-500 MT/M by M/s AB Mauri India Pvt Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/91668/2019
Project Cost 502 lacs
2.
S. No. in the schedule5(g) Distilleries
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Dry Vinasse (commercial yeast culture) for Animal ration- 480 MT & Vinasse Enrich with molasses for Animal ration-500MT/M ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectMIDC Lotre Parshuram
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.D-7/2A
Town / VillageMIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRatnagiriKhed
10.
Nearest railway station along with distance in kms Chiplun Railway Station, 10 km
Nearest airport along with distance in kms Pune Airport, 115 km
11. Nearest Town/City/District Headquarters along with distance in kms Chiplun , 10 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) At Post- Lote Pir, Lote Parshuram MIDC, Tal. Khed, Dist. Ratnagiri (MS)
13. Name of the Applicant Amol
14. Registered Address D-7/2A, MIDC Area, Lote Parshuram, Tal. Khed, Dist. Ratnagiri Maharashtra
15.
Address for correspondance:
Name of the Company A B MAURI INDIA PVT LTD
Name of the Applicant Amol
Designation (Owner/ Partner/ CEO) Manager
Pin code 415722
E-mail amol.nayak@abmauri.com
Telephone No. 02356-272222
Fax No. 02356-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There will be no change in land use pattern. The land use is industrial purpose. The site is already in an existing Notified Industrial Area [MIDC] of Maharashtra Industrial Development Corporation. There will no new construction required for the proposed products manufacturing. The plant already exists at this location since 1989.
1.2 Clearance of existing land, vegetation and buildings? No There is no need of clearance of existing land, vegetation and buildings.
1.3 Creation of new land uses? No The said land is reserved for industrial projects by Govt. of Maharashtra.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Site specific sub surface investigation was already done.
1.5 Construction works? No There is no construction work
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Not Applicable
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No Not Applicable
1.9 Underground works including mining or tunnelling? No There is no underground works including mining or tunneling.
1.10 Reclamation works? No There is no reclamation work is required.
1.11 Dredging? No There is no dredging involved.
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes Manufacturing process is given in the prefeasibility Report.
1.14 Facilities for storage of goods or materials? Yes Adequate storage facilities for raw materials and finished product will be provided within the project site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The generation of Hazardous Waste & solid Waste will be nil. The Proposed products manufacturing are byproducts from waste water treatment of existing facility which includes Anaerobic Bio-digester PTRO HPRO MEE Plant Bio-composting and Dryers for treating Effluent. Permeate generated form RO and MEE is further treated through SPIRAL RO and is reused in Utility, Cooling Towers, Boiler feed water and process. The Biogas generated is used as fuel in boiler. MEE concentrate is treated through Bio-
1.16 Facilities for long term housing of operational workers? No There is no need of long term housing facility.
1.17 New road, rail or sea traffic during construction or operation? No Proposed project is located in Notified Industrial Area [MIDC] Maharashtra Industrial Development Corporation, infrastructure facility is already available.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Proposed project is located in Notified Industrial Area [MIDC] Maharashtra Industrial Development Corporation, infrastructure facility is already available.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There is no closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No There is no new or diverted transmission lines or pipelines.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There has no impoundment damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers.
1.22 Stream crossings? No Not Applicable.
1.23 Abstraction or transfers of water from ground or surface waters? No There is no abstraction of ground water. Also there is no water requirement of raw water for the proposed by products as these products will be manufactured from MEE Concentrate.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no any changes in water bodies or the land surface affecting drainage or run-off of the area as Drier is installed in Existing plant building only.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes There will be no construction work & hence there will be no transport of personnel or materials.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? No No Manpower Proposed.
1.29 Introduction of alien species? No Introduction of alien species is not envisaged.
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The land is part of notified Industrial Area of Govt. of Maharashtra. Total plot area of project is 7.93 ha.
2.2 Water (expected source & competing users) unit: KLD Yes For manufacture of proposed Byproduct’s No water is required.
2.3 Minerals (MT) No There is no use of minerals.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No None
2.5 Forests and timber (source – MT) Yes None.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity available from State Electricity Board- Existing -3251 KVA
2.7 Any other natural resources (use appropriate standard units) No None
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No None
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No effect is envisaged.
3.3 Affect the welfare of people e.g. by changing living conditions? No There is no harmful effect on human health or the environment.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No effect envisaged.
3.5 Any other causes No Not envisaged.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable.
4.2 Municipal waste (domestic and or commercial wastes) No None.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No None.
4.4 Other industrial process wastes No There is no other industrial process wastes.
4.5 Surplus product No There will be no surplus product.
4.6 Sewage sludge or other sludge from effluent treatment No None
4.7 Construction or demolition wastes No None
4.8 Redundant machinery or equipment No None
4.9 Contaminated soils or other materials No There are no contaminated soils or other materials.
4.10 Agricultural wastes No There are no Agricultural wastes.
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No For proposed products there will be no need of fossil fuels, however for existing plant there is boiler to meet process & ETP steam requirement, the details are as below Boiler ( 2 Nos) one boiler standby Capacity -10 TPH Fuel Briquette- 625 Kg/Hr Biogas- 208 NM3/Hr Furnace Oil- 650 Kg/Hr
5.2 Emissions from production processes No There is no emission from production processes.
5.3 Emissions from materials handling including storage or transport No As materials transfer will be done in closed packaging / pipe lines therefore no emission is envisaged.
5.4 Emissions from construction activities including plant and equipment No There is no any construction activity carried away by industry.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No There is no construction activity. Odor problems will be properly controlled at source by good operational practices, including physical and management control measures.
5.6 Emissions from incineration of waste No There is no emission from incineration of waste.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No open burning of waste.
5.8 Emissions from any other sources No Not Envisaged.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers No Not Applicable.
6.2 From industrial or similar processes Yes Noise will be generated from operation of equipment like exiting Boiler & DG Set. Proper mitigation measures will be taken for the reduction of noise levels viz acoustic enclosures etc. the workers will be provided with personal protective equipment.
6.3 From construction or demolition No There is no any construction or demolition activity.
6.4 From blasting or piling No Not Applicable.
6.5 From construction or operational traffic Yes Noise during operational activities will be temporary & will be maintained within the prescribed noise standards.
6.6 From lighting or cooling systems Yes There will be noise from the cooling tower but will be maintained within the prescribed noise standards.
6.7 From any other sources No There are no any other sources of noise generation.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No such material is used.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The proposed products are byproducts from effluent hence there shall not be discharge of effluents to land or water body.
7.3 By deposition of pollutants emitted to air into the land or into water No Proper pollution control management will be followed. Multicyclone dust collector followed by wet scrubber is installed in order to keep the air emission under control.
7.4 From any other sources No Not Applicable.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There is no long term build up of pollutants in the environment, however periodic monitoring will be done for the air water and soil in the plant premises and surrounding.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Proper maintenance, operation and leakage proof condition of machines will eliminate the possibilities of fire. Fire extinguishers will be installed near all machineries & all persons will be properly trained to quench the fire at source itself. No other major risk will be involved.
8.2 From any other causes No Not envisaged.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No such case has been reported in the area and chanced are minimal. However, the company will have Emergency and Contingency plans in place.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Infrastructure is already available from MIDC. The demand for housing will go up due to recruitment of people.
9.2 Lead to after-use of the site, which could have an impact on the environment No Possibility of negative impact on air, water, noise however anticipated mitigation measures shall be taken by the industry.
9.3 Set a precedent for later developments Yes This project will have positive effect on the living standards of local people, infrastructure and overall development of the area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes The industry is located MIDC area; MIDC has also other industries which may cause cumulative effect.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Present within 15 km Aerial distance from proposed project site.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable.
4 Inland, coastal, marine or underground waters No Not Applicable. River Vashishti is around 5 Km towards South Direction from site
5 State, National boundaries No Not Applicable.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No None within 15 Km aerial distance from proposed project site.
7 Defence installations No Not Applicable. Site is located at Notified MIDC.
8 Densely populated or built-up area No Chiplun – 10 km towards South Direction
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Not Applicable.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No None.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
EDS Reply-3
EDS reply-1
EDS Reply-2
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per our understanding, prior EC is not required for your project. However, for more clarity/additional information,if any required, you may contact the Ministry/IA(POLICY) section. 14 May 2019
2.NAThe correction have been made as per the instruction received 25 Apr 2019
3.NABased, on the proposal and clarifications submitted by you, the instant project is for manufacturing/extracting Dry Vinasse and Vinasse enrich with molasses, which are essentially by products of the present Industrial operations. As such, only products listed under the schedule to the EIA Notification, 2006 requires prior EC for Industrial operations, not the by-products. Accordingly, Maharashtra PCB may be contacted for further action in this regard 24 Jan 2019
4.NAThe correction have been made as per the instruction received 23 Jan 2019
5.NAPlease refer our earlier observations. Information sought are not provided. Please provide the information for further needful. 22 Jan 2019
6.NAThe correction have been made as per the instruction received 22 Jan 2019
7.NAPlease provide copy/inform the following: (1) Whether the said by products (products proposed) are derived from any Industrial operations which is requiring EC? (2) Whether the PP is running any Chemical unit/Distillery unit in the existing premises. (3) Whether the proposed activities are being set up in a Chemical Industry or in a distillery? (4) Whether any chemical reaction or distillation is involved for deriving the proposed products? (5) Copy of CTO/EC for the existing operations 18 Jan 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAmol
DesignationManager
Name of Company (Applicant Name should not be given here)A B MAURI INDIA PVT LTD
AddressD-7/2A, MIDC Area, Lote Parshuram, Tal. Khed, Dist. Ratnagiri Maharashtra