APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed establishment of Pesticide specific intermediates & Synthetic Organic Chemicals Manufacturing Facility
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/90992/2019
Project Cost 15000 lacs
2.
S. No. in the schedule5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Plot Area: 20224 sq m ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
c) Notified Eco-sensitive areas
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot No. 53A, Roha MIDC Industrial area, Dist Raigad.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot no. 53A, Roha MIDC Area
Town / VillageDhatav
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRaigadRoha
10.
Nearest railway station along with distance in kms Roha Railway Station, 4 km
Nearest airport along with distance in kms Mumbai Airport, 80 km
11. Nearest Town/City/District Headquarters along with distance in kms Roha , 4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) -
13. Name of the Applicant Praveen
14. Registered Address PLOT NO 53 A ROHA MIDC AREA
15.
Address for correspondance:
Name of the Company DEEPAK NITRITE LIMITED
Name of the Applicant Praveen
Designation (Owner/ Partner/ CEO) sitehead
Pin code 402116
E-mail pdesai@deepaknitrite.com
Telephone No. 2194-263550
Fax No. 2194-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The proposed establishment project site is located in MIDC Roha Industrial area, which is designed for industrial purpose only.
1.2 Clearance of existing land, vegetation and buildings? No No vegetation in the area of proposed activity
1.3 Creation of new land uses? No The facility is part of a notified Industrial area, by MIDC Roha and proposed project will be established at site.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Will be done as required.
1.5 Construction works? Yes Proposed project will be established within the plot.
1.6 Demolition works? No Not applicable.
1.7 Temporary sites used for construction works or housing of construction workers? No Not applicable.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Please refer pre feasibility report.
1.9 Underground works including mining or tunnelling? No Not applicable.
1.10 Reclamation works? No Not applicable.
1.11 Dredging? No Not applicable.
1.12 Offshore structures? No Not applicable.
1.13 Production and manufacturing processes? Yes Please refer pre feasibility report
1.14 Facilities for storage of goods or materials? Yes All chemicals/raw materials/products will be stored in drums/tanks and warehouse with adequate safety measures.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Hazardous waste will be disposed of as per hazardous waste rule, 2016. Treated effluent will be sent to Roha CETP.
1.16 Facilities for long term housing of operational workers? No Not applicable.
1.17 New road, rail or sea traffic during construction or operation? No Not applicable.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Site is located in MIDC Roha and well connected by road and railway.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable.
1.20 New or diverted transmission lines or pipelines? No Not applicable.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable.
1.22 Stream crossings? No Not applicable.
1.23 Abstraction or transfers of water from ground or surface waters? No Not applicable. Water required would be sourced from MIDC
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable.
1.25 Transport of personnel or materials for construction, operation or decommissioning? No Not applicable.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable.
1.28 Influx of people to an area in either temporarily or permanently? No Not applicable.
1.29 Introduction of alien species? No Not applicable.
1.30 Loss of native species or genetic diversity? No Not applicable.
1.31 Any other actions? No Not applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Not Applicable. Proposed project will be established within MIDC.
2.2 Water (expected source & competing users) unit: KLD Yes Source: water will be sourced from MIDC Roha Total requirement: 1756 cmd
2.3 Minerals (MT) No Not applicable.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Suitable construction material will be used.
2.5 Forests and timber (source – MT) No Not applicable.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Proposed electricity requirement is 5000 KVA (It will be sourced from MSEDCL). One boiler is proposed at site of 16 TPH steam. Its coal requirement will be 64 TPD. Imported coal is proposed to be used. There is proposal to add three emergency DG set at site (capacity 1000 KVA) . Its fuel requirement will be 3 x 200 Lit/hr in case of emergency.
2.7 Any other natural resources (use appropriate standard units) No Not applicable.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Chemicals will be stored/ handled according to respective MSDS.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable.
3.3 Affect the welfare of people e.g. by changing living conditions? No Not applicable.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable.
3.5 Any other causes No Not applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable.
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal Waste will be disposed as per Norms.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous waste from Process and Effluent Treatment Plant will be handled and disposed as per HW Rules, 2016.
4.4 Other industrial process wastes No Not applicable.
4.5 Surplus product No Not applicable.
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from ETP shall be handled as per HW rules 2016
4.7 Construction or demolition wastes Yes Construction waste will be disposed as per norm
4.8 Redundant machinery or equipment No Not applicable.
4.9 Contaminated soils or other materials No Not applicable.
4.10 Agricultural wastes No Not applicable.
4.11 Other solid wastes No Not applicable.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes SO2, NOx, and PM Emission are envisaged from fuel burning sources. There will be stack emissions from combustion of fuel such as Boiler, DG etc. The emission will be controlled by provision of Air Pollution Control Equipment’s such as stack height, Dust Collectors, Bag Filters etc.
5.2 Emissions from production processes Yes Emission from Process will be scrubbed by installing scrubber and maintained within the stipulated limits by CPCB/ MPCB
5.3 Emissions from materials handling including storage or transport Yes liquid will be stored & handled in closed operation method. Negligible amount of emissions would be generated during storage/ transport of material. The same will be taken care off through ID fans / scrubbers proposed to be installed at site.
5.4 Emissions from construction activities including plant and equipment Yes Particulate matter is expected from construction activities.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Not applicable.
5.6 Emissions from incineration of waste No Not applicable.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable.
5.8 Emissions from any other sources No Not applicable.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise generating equipment’s will be provided with acoustic enclosures to ensure compliance with CPCB/ MPCB standards
6.2 From industrial or similar processes Yes Noise generating equipment’s will be provided with acoustic enclosures to ensure compliance with CPCB/ MPCB standards
6.3 From construction or demolition Yes During the construction or fabrication work, due to operations of machinery and equipment, some noise would be generated. This would be of temporary nature and the workers getting exposed would be provided with PPE.
6.4 From blasting or piling No Not applicable.
6.5 From construction or operational traffic No Not applicable.
6.6 From lighting or cooling systems No Not applicable.
6.7 From any other sources No Not applicable.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Closed handling practices, dyke wall will be provided to avoid spillage / leakage of Hazardous Chemicals. Storage of chemicals in tank farms and warehouse with adequate safety features, and proper dyke enclosures will be provided as per industrial norms.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No there will be no discharge of sewage or other effluents to water or the land
7.3 By deposition of pollutants emitted to air into the land or into water No Air Pollution Control equipment will be provided at source to prevent emissions in air.
7.4 From any other sources No Not applicable.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Proper safety measures will be taken to avoid any mishap or accident in the plant and fuel Storage Yard or Chemical Storage Yard or any other area in plant.
8.2 From any other causes No Not applicable.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not applicable.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The existing facility is in a MIDC industrial area where the proposed activity will be done.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable.
9.3 Set a precedent for later developments No Not applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Reserve Forest 1- 1.5 km to South east, Reserve Forest 2- 1.5 km to North
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Village Dhatav wherein the Roha MIDC is setup have appeared in the list of ESA village of Western Ghats (Ecological Sensitive Area Village) draft notification dated 14.03.2014 , 04.09.2015, 27.02.2017 and 03.10.2018.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters Yes River Kundalika is about 0.8 Km to North of project site.
5 State, National boundaries Yes Not applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Mumbai- Goa Road- 4.4 km East of site
7 Defence installations No Not applicable
8 Densely populated or built-up area Yes Roha town- 4 km to West
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Roha town- 4 km to West
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not applicable
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 24 Jan 2019
2.NAPlease refer our earlier observations, the information sought were still not provided. Please provide the information separately now, as the same is not provided in Form 1/PFR/Additional Documents 21 Jan 2019
3.NAThe correction have been made as per the instruction received 19 Jan 2019
4.NAPlease refer our earlier observations, no additional details/information is made available by the PP. 18 Jan 2019
5.NAThe correction have been made as per the instruction received 17 Jan 2019
6.NA(1)Kindly provide the list of chemicals along with quantity separately, falling under pesticides [item 5(b)] and synthetic organic chemicals (5(f)). (2) Please provide the copy of land alottment. (3) Please provide the copy of existing EC/CTO, if any 10 Jan 2019
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantPraveen
Designationsitehead
Name of Company (Applicant Name should not be given here)DEEPAK NITRITE LIMITED
AddressPLOT NO 53 A ROHA MIDC AREA