APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed expansion of Sugar Factory from 4900 to 7500 TCD, Co-gen from 11 MW to 30 MW & Molasses based Distillery unit from 30 KLPD up to 200 KLPD by Jakraya Sugar Limited. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/83945/2018 | Project Cost | 14100 lacs | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries 5(j) Sugar Industry
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed expansion of Sugar Factory from 4900 to 7500 TCD, Co-gen from 11 MW to 30 MW & Molasses based Distillery unit from 30 KLPD up to 200 KLPD by Jakraya Sugar Limited. ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/MH/IND2/83943/2014 | MoEFCC file number(Previous EC) | F.No.J-11011/314/2012-IA II (I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 22.51 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | Yes | a) | Protected areas notified under the wildlife (Protection) Act, 1972 | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Watwate, Mohol, Solapur | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | S. No. -61 A, 70, 71, 72 73, 74. | Town / Village | Watwate | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Solapur | Mohol | | 10. | |
Nearest railway station along with distance in kms | Pakani railway station, 26 km | Nearest airport along with distance in kms | Solapur, 39.3 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Solapur , 36 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Grampanchayat Watwate
Tal.: Mohol, Dist.: Solapur, Maharashtra.
PIN - 413305 | | 13. | Name of the Applicant | Sachin | | 14. | Registered Address | At Watwate Tehsil Mohol District Solapur | | 15. | |
Address for correspondance: | Name of the Company | JAKRAYA SUGAR LIMITED | Name of the Applicant | Sachin | Designation (Owner/ Partner/ CEO) | MD | Pin code | 413305 | E-mail | jakrayasugarmfg@gmail.com | Telephone No. | 2188-221173 | Fax No. | 2188- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | Yes | Status | Application for Wildlife Clearance yet to be submitted | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The total land acquired by project proponent for Industrial purpose is 22.51 Ha. This entire land is a flat terrain. There would be no change in land use pattern since it is a proposed expansion project that would be undertaken in existing factory area. | 1.2 | Clearance of existing land, vegetation and buildings? | No | There would be no any requirement of vegetation clearance since presently the land is being used for industrial activities. Mostly, the infrastructure of existing factory unit would be used. Only few equipments & machineries as required would be installed in existing factory unit. While in distillery unit the existing set-up shall be revamped by using equipments & machineries of latest technology. Industry has already taken initiative towards green belt development in Industry premises. | 1.3 | Creation of new land uses? | No | Not Applicable | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil is observed to be slight reddish brown to dark brown in colour with fairly good drainage. It is clay loam in texture, fine in structure and alkaline in reaction. Detailed Soil Testing of the industrial premises as well as 10 KM area surrounding the project site would be done in order to assess the existing soil quality. The results of same would also be reflected in final EIA report. | 1.5 | Construction works? | No | No major construction would be done since most of infrastructure would be used from existing unit like Admin Building, Common Utility, Canteen, Mill House, Evaporator House etc. In existing premises, equipments and machineries as required for proposed expansion unit would be installed. | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not Applicable | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Not Applicable | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | No | There would be no change in topography, land use or change in water body due to manufacturing activities in sugar, distillery and co-gen plant unit. Here harvested cane from near by areas shall be used as raw material for sugar factory while by-product molasses from sugar factory shall be used as raw material for distillery unit and bagasse to the co-gen plant boiler for generation of electricity. Refer Additional attachment for manufacturing process description & flow chart. | 1.14 | Facilities for storage of goods or materials? | Yes | For the storage of sugar, godowns are provided on site while that of molasses and rectified spirit also storage tanks have been provided. Additional storage arrangement shall be done after expansion activities in sugar, distillery and Co-gen unit. These proposed storage arrangement shall be done on land area which is already reserved for storage activities in the premises. Hence, there shall not be any impact on existing topography, landuse. Refer Additional attachment for plot layout. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Under expansion, solid waste - boiler ash would be sold to brick manufacturers & used for compost production. ETP sludge would be used as manure in factory premises. Effluent generated from Sugar and co-gen unit shall be treated in existing ETP. Under expansion, Spentwash from distillery shall be treated in biomethanation plant followed by MEE. Other effluents from distillery shall be forwarded to sugar factory ETP. Domestic effluent shall be treated in proposed STP. | 1.16 | Facilities for long term housing of operational workers? | No | Not Applicable | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There would be no change in hydrology of water sources due to expansion project. The water required for the expansion activities would be taken from the Bhima river. | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No ground water is used for any industrial activity. The water required for various operations under proposed additional production activities would be met from Bhima river. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | No major construction work shall be undertaken on site. Only work related to installation of equipments and machineries as required under proposed expansion activities would be done on site for which local labours shall be used. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporarily for equipment installation work there would be influx of people to the project site. However, it would be of a temporary nature. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The proposed expansion activities in sugar and distillery plant shall be undertaken in existing manufacturing setup. Also, the co-gen plant shall be implemented in sugar plant area. No any agricultural land is being diverted for proposed activities.
Refer plot layout plan enclosed in Additional attachment for more details. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Sugar factory & Co-gen–Total water requirement 2444 CMD (2197.1 CMD sugarcane condensate & 246.9 CMD fresh water from Bhima river). For Domestic purpose 65 CMD will be required after expansion which will be fresh water.Distillery–Total water 2313 CMD (condensate water 1425 CMD & fresh water 888 CMD). For Domestic purpose 10 CMD required under existing unit. No any fresh water will be required in expansion. Refer Additional attachment for detailed water budget. | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Negligible. There would be no major civil construction work. The required construction material would be purchased from nearby sources through the suppliers | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Presently, electricity of 10.3 MW required for manufacturing operations under existing activity. For expansion activity approximately 22 MW shall be required. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not Applicable | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | There is no such report of occurrence of any waterborne diseases or any disease vectors due to existing project. Also, after implementation of the proposed activities, there shall not be any occurrence of any waterborne diseases or any disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Already due to existing sugar, co-gen and distillery project provided employment to the local resident which has resulted in upgrading the living standard of people. Further, after commissioning of the proposed expansion, there would be a positive impact on the social and economic status of local people due to direct and indirect employment opportunities. This will help to improve the life style of local people in surrounding area. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable, since it is an expansion project. During implementation of expansion activity there shall not be any major overburden generated. | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Not Applicable | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | As per the Hazardous Wastes (HW) (Handling, Management & Transboundary Movement) Forth Amended Rules, 2010; the HW generated from proposed expansion activities would be in the form of Used Oil under Cat. No. 5.1 is generated to the tune of 2.27 MT/Month which would be reused in boiler.
The HW generated from existing activities is also in the form of Used Oil under Cat. No. 5.1 generated to the tune of 1.48 MT/ Month. The same is burnt in boiler. | 4.4 | Other industrial process wastes | Yes | From sugar factory & co-gen plant total boiler ash generated after expansion will be 1056 MT/M same will be sold to brick manufacturer & ETP sludge @ 8 MT/M will used as manure. In distillery, solid waste would be generated in the form of Yeast Sludge & CPU Sludge @ 540 MT/M & 10 MT/M respectively. Same will burnt in boiler. | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | ETP sludge generated to the tune of 8 MT/M from existing as well as expansion activities shall be utilized as manure in own factory premises. | 4.7 | Construction or demolition wastes | Yes | Negligible quantity of construction waste would be generated same would be used for filling low lying areas in factory premises. Scrap if any shall be sold to out side parties for reuse. | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | Yes | Solid Waste in the form of Boiler Ash to the tune of 666 MT/M is generated from existing and 390 MT/M would be generated from the proposed expansion project and same would be given to the brick manufacturers and used for compost production.
ETP sludge to the tune of 5 MT/M is generated from existing and 3 MT/M would be generated from the expansion project and same would be used as manure in own factory premises. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Under expansion activity, two high pressure boilers of 50 & 90 TPH for Sugar, Co-gen & distillery unit will be installed. Bagasse- 22.1 MT/Hr & 39.6 MT/Hr respectively would be used as fuel. Proposed boilers will be provided with Wet scrubber, preceding the stack of 65 M & 75 M height respectively as APC.
Boilers in existing cogen unit of 70 TPH is provided with wet scrubber as APC equipment followed by stack of 72 M. | 5.2 | Emissions from production processes | No | From the sugar manufacturing operations as well as co-gen plant there would be no any process emissions. There would be process emissions in the form CO2 & air from Fermenters in distillery unit. The CO2 from Fermenters to the tune of 22.6 MT/M release in atmosphere. | 5.3 | Emissions from materials handling including storage or transport | Yes | Negligible amount of emissions would be generated from storage or transport. | 5.4 | Emissions from construction activities including plant and equipment | Yes | No any major construction work shall be undertaken on site since it is expansion project in existing premises. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Negligible. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable, since no any waste would be burnt in open air. | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Source of noise in the JSL would be cane carrier, turbines, mills, pumps, centrifuge, compressors and boiler house. Trucks/tractors will be used for transportation of sugarcane and raw material as well as finished product. Noise generated from transportation is a fleeting source. The workers entering the workzone area like boiler house, mill house, centrifuge etc. would be provided with ear muffs & other PPE which would give the reduction of 30 dB (A). | 6.2 | From industrial or similar processes | Yes | As mentioned above. | 6.3 | From construction or demolition | Yes | During the installation of new equipments/ machineries some noise would be generated. However, the same would be of a temporary nature and the workers getting exposed to same would be provided with PPE. | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | Negligible. Noise would be created by movement of trucks for material transportation. However, this would not be of a continuous nature and would not have much impact on the work environment of the project site. | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not Applicable. Since there would be no any use or handling of hazardous chemicals in the manufacturing process. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Effluent from industrial activities would be treated in existing ETP provided in sugar factory comprises of Primary, Secondary & Tertiary treatment units. Mechanical Oil Skimmer, Bar Screens, 1 Anaerobic Lagoon, 1 Aeration Tank with Diffused Aeration System, 2 Clarifiers, Tertiary Treatment in the form of Dual Media Filter followed by MEE & centrifuge for sludge drying. Treated effluent would be used for green belt. No any untreated effluent shall be discharged in nearby water body/land. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | To control the air emissions from the boiler, Wet scrubber followed by stack of adequate height shall be provided as Air Pollution Control (APC) Equipment. Proper Operation & Maintenance would be carried out for the wet scrubber for its maximum efficiency in controlling the fly ash. This will prevent deposition of fly ash on Land or any other surface; hence there would be no any nuisance to the surrounding area. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Hazard prone area would be the alcohol storage area. Alcohol storage area would be designed and constructed as per OISD norms. Also fire fighting arrangement will be provided as per government norms. Workers would be given fire-Fighting Training & made aware of accident prone areas in plant. Also, proper housekeeping would be maintained in the production and storage areas. | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The possibility of project getting affected by earthquake resulting in to subsequent environmental damage is very negligible. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Under sugar factory, the existing ETP shall be upgraded to treat effluent from existing and proposed activities of sugar, distillery as well as co-gen plant.
Not Applicable.
Not Applicable.
Not Applicable.
Not Applicable. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable. | 9.3 | Set a precedent for later developments | No | Not Applicable. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | No other industry exists within 10 Km. radius
of the site. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not Applicable | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Yes, The boundary of GIB Sanctuary at Nannaj is located within 5 km of study area. As per Supreme Court Orders the finalization of Eco Sensitive Zone (ESZ) of Great Indian Bustard (GIB) sanctuary is in process at PCCF Nagpur and NBWL, But the notification of the ESZ is not yet been published by National Board for Wildlife (NBWL). | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | National Highway of NH- 9 is about 34.7 Km & State Highways of SH-149 is about 11.2 Km. | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | No | Not Applicable | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | Not Applicable | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Bhima River, 3 Km away from the project site. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Sachin | Designation | MD | Name of Company (Applicant Name should not be given here) | JAKRAYA SUGAR LIMITED | Address | At Watwate Tehsil Mohol District Solapur |
| |
|