APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s expansion project of existing API and Intermediates manufacturing unit of Unichem Laboratories Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/83180/2018
Project Cost 1000 lacs
2.
S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 500 TPA;area-48885.0 sqm ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/MH/IND2/83178/1990
MoEFCC file number(Previous EC)formate1.0/BO/CAC-Cell/EIC No-3222-16/14th CAC/331
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 377.77 ha.
6. Category of project i.e. 'A' or 'B' B
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectplot no. 99, MIDC Dhatav, Roha, Raigad, Maharashtra
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.plot no. 99, MIDC Dhatav
Town / Villagevillage Roth, Roha, Raigad district, Maharashtra
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRaigadRoha
10.
Nearest railway station along with distance in kms Roha, 5 km
Nearest airport along with distance in kms Chatrapati Shivaji Maharaj Mumbai airport, 120 km
11. Nearest Town/City/District Headquarters along with distance in kms Roha , 5 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayat-Roth, however project lies within notified industrial area MIDC-Dhatav.
13. Name of the Applicant Umakant
14. Registered Address Unichem Bhavan, Prabhat Estate, S.V.Road, Jogeshwari (West) Mumbai-12
15.
Address for correspondance:
Name of the Company UNICHEM LABORATORIES LTD
Name of the Applicant Umakant
Designation (Owner/ Partner/ CEO) GMRohaplant
Pin code 402116
E-mail umakant.kadam@unichemlabs.com
Telephone No. 022-66888333
Fax No. 022-26784391
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The production unit is operational in the MIDC. The expansion will be done by construction of new plant in the premise.
1.2 Clearance of existing land, vegetation and buildings? No Not Applicable. The proposed expansion will be done on open area in the plot premise.
1.3 Creation of new land uses? No The area is developed as an industrial area. Expansion will be done within existing plot.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil and ground water samples has been collected for testing. The results are awaited.
1.5 Construction works? Yes Construction work will be required for construction of new manufacturing unit.
1.6 Demolition works? No No demolition will be envisaged for proposed expansion work.
1.7 Temporary sites used for construction works or housing of construction workers? No Local contractors and workers will be employed for construction.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Production unit and other necessary infrastructure will be constructed in the open area of the plot.
1.9 Underground works including mining or tunnelling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Product information & Manufacturing Process are given in pre-feasibility report.
1.14 Facilities for storage of goods or materials? Yes Dedicated demarcated area will be made available for storage of goods, raw materials and products.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes • Solid waste will be disposed through CHWTSDF or it will be sold to MPCB registered vendors. • High TDS effluent will be treated in multiple effect evaporator system of 40 CMD capacity and salt generated shall be dispose to CHWTSDF. Low TDS process effluent will be treated in a three stage ETP of 300 CMD capacity. The treated effluent will be discharged to CETP, Roha. • Domestic sewage shall be treated aerobically in the ETP.
1.16 Facilities for long term housing of operational workers? No No long term housing facility is provided. Workers are hired from nearby locality
1.17 New road, rail or sea traffic during construction or operation? No Not required. The existing facilities provided by government are sufficient for the said project.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not required. The unit is in MIDC . Existing facilities are adequate.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not required. Existing arrangements are adequate
1.20 New or diverted transmission lines or pipelines? No additional power and water shall be acquired by existing facilities
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Not applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No changes are envisaged, the project is established in notified industrial area developed by MIDC.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes By existing roads provided by Dhatav MIDC
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Temporary influx of construction workers during construction period is envisaged. Additional man power will be employed for commissioning and operation of the expansion project.
1.29 Introduction of alien species? No Not applicable.
1.30 Loss of native species or genetic diversity? No Project lies within notified industrial area. not applicable
1.31 Any other actions? No Not envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The said activity will be carried out in Dhatav MIDC, which is a notified Industrial area.
2.2 Water (expected source & competing users) unit: KLD Yes • As per CTO: 350 CMD • Existing water requirement: 350 CMD • After expansion water requirement : 590 CMD Source of Water supply: MIDC.
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The required construction material will be sourced from the local market. The quantity would be as per the architectural drawings.
2.5 Forests and timber (source – MT) No No timber will be used for the construction.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 1. Details of Electricity Requirement Electricity Supplied by: MSEDCL Existing Power Load: 3966 KW Total Power Load after expansion: 5216 KW 2. Details of Fuel Required For D.G. Existing HSD requirement- 170 L/hr, after expansion 670 L/hr 3. Fuel requirement for Boiler Existing FO: 380 L/hr After expansion: 680 L/hr
2.7 Any other natural resources (use appropriate standard units) No Not Applicable.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Detailed raw material list containing hazardous material is given in pre feasibility report. Raw materials will be stored in designated area and as per compatibility.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not envisaged.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes It is expected that the proposed expansion of the project will lead to direct & indirect employment in a small scale.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged.
3.5 Any other causes No Not envisaged.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes non hazardous commercial waste shall be disposed to scrap vendors . details are given in pre-feasibility report
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes HW will be stored separately in demarcated area and disposed to CHWTSDF/Co-processing as per the Hazardous And Other Wastes (Management and Trans-boundary Movement) Rules, 2016.
4.4 Other industrial process wastes Yes it will be disposed through CHWTSDF. Details are given in pre-feasibility report.
4.5 Surplus product Yes Spent solvent -660 MT/A shall be generated.
4.6 Sewage sludge or other sludge from effluent treatment Yes Total 35 MT/ year ETP sludge will be generated after expansion. Sludge will be disposed to CHWTSDF. Evaporator residue shall be 5500 MT/A which shall be disposed to CHWTSDF/co-processing or to be sold to recycler.
4.7 Construction or demolition wastes Yes No demolition waste will be generated. Construction waste will be used for land filling in the premise.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes Yes e-Waste, bio medical waste, Plastic waste, battery waste etc. shall be stored and disposed as per recommendations of respective notifications.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Existing: From boiler and thermopack- 300 L/hr FO Emissions: SO2, NOx, CO From D.G Set Consumption Quantity: 170 L/hr HSD. Emissions: SO2, NOx, CO After expansion : FO: 680 L/hr HSD: 670 L/hr Emissions: SO2, NOx, CO
5.2 Emissions from production processes Yes A process scrubber will be provided to control process emissions. Existing: 13 unit of process scrubber.(11 alkali scrubbers, 2 acid scrubbers) Proposed: additional 11 scrubbers
5.3 Emissions from materials handling including storage or transport No SOPs are followed for handling and transportation of chemicals to reduce emissions. Close feeding system will be adopted for most of chemicals.
5.4 Emissions from construction activities including plant and equipment Yes Proper mitigation measures will be taken like water sprinkling and barriers will be constructed at site.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Proper mitigation measures will be taken like water sprinkling and barriers will be constructed at site. Odor producing material will be segregated and stored in containment.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes 1. Plant Operation: To control vibration: shock absorbers and vibration absorbing pads will be provided. To control Noise: Acoustic Enclosures will be provided to necessary equipments. 2. D.G Set Operation : (Only during power failure) D.G. set will be operated only during power cuts from the main grid. Acoustic enclosure is provided to D.G. set.
6.2 From industrial or similar processes Yes To control Noise: Acoustic Enclosures is provided to necessary equipments. Vibration: Vibration absorbing pads & shock absorber is provided to the equipment’s, regular preventive maintenance is done to reduce noise and vibrations.
6.3 From construction or demolition Yes To control pollution, necessary precautions will be taken.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes For Operational purpose only. The PUC certified vehicles will be used. Necessary precautions will be taken. Proper traffic management will be followed.
6.6 From lighting or cooling systems No Not Applicable.
6.7 From any other sources No Not Applicable.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No SOPs are prepared for chemical handling and transportation. Appropriate dyke will be provided for proposed storage tanks and closed feeding system is adopted for chemical addition.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No The treated effluent is discharged to Roha MIDC, CETP.
7.3 By deposition of pollutants emitted to air into the land or into water No Process scrubber stack of 3 m above roof is provided. A stack above rooftop of 3.5 m height is provided to the D.G. set to effectively disperse the emission. Proposed Boiler will be provided stack height as per CPCB guidelines.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Appropriate measures will be incorporated to control the pollutants within limit as per norms.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Quantitative Risk Assessment of hazardous chemicals will be done and HAZOP Study for proposed expansion will be carried out. Onsite Emergency situation will be shared with district authority. SOP’S for proper handling of hazardous chemicals and processes will be prepared and followed. Fire hydrant system is provided and Fire Extinguisher, Safety wears and OHC is made available wherever necessary.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes There is no history of such a disaster in the area under reference. However, drains are designed of appropriate size. Structure is designed as per the Seismic zone requirements.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Not Applicable. The existing project is in notified industrial area.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No The project is located within notified industrial area (MIDC –Dhatav)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No 1. Nearest Eco sensitive area Dhatav is at 1.88 km aerially towards EES 2. Nearest reserved forest towards N is at 1.62 km, towards W is at 2.52 km, towards S is at 2.36 km and 1.88 km towards E aerially. 3. Kundalika river is at 1.03 km aerially towards N. Additionally several patches of reserved forest and small streams connecting to Kundalika river exists within 15 km area.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes 1. Reserve Forests: Scattered patches of Reserve Forest exist at an aerial distance of more than 5 km from the project site.
4 Inland, coastal, marine or underground waters No 1. Kundlika River is 1.3 km away from the project site.
5 State, National boundaries No State boundary is beyond 15 km.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Local pilgrim and tourist areas are exist within 15 km. The sites are accessible by road network
7 Defence installations No No defense installations are within 15 km area.
8 Densely populated or built-up area Yes 1. Roha town is located at an aerial distance of 5 km from the project site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Present within 15 km radial distance of the project site.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No 1. Kundlika River: At an aerial distance of is 1.3 km from the project site. 2. Reserve Forest: Scattered patches of Reserve Forest exist at an aerial distance of more than 5 km from the project site. 3. Tourism: Raigadh Fort - aerial distance of 59.4 km, Shivathar Ghal an aerial distance of 97 km away.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not present within 15 km radial distance of the project site.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not applicable.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease refer our earlier observations and submit the proposal to SEIAA/SEAC 13 Feb 2019
2.NAThe correction have been made as per the instruction received 31 Jan 2019
3.NAPlease refer our earlier observations and submit the proposal to SEIAA/SEAC 03 Jan 2019
4.NAThe correction have been made as per the instruction received 18 Dec 2018
5.NAPlease refer our earlier observations, the proposal may be accordingly submitted to SEAC/SEIAA for the needful 07 Dec 2018
6.NAThe correction have been made as per the instruction received 13 Nov 2018
7.NAAs the ESA is not notified yet, the project requires appraisal at State level by SEAC/SEIAA. 05 Nov 2018
8.NAThe correction have been made as per the instruction received 05 Nov 2018
9.NABeing located in the Industrial area, the project requires appraisal at State level by SEAC/SEIAA. Documents, for support of applicability of general condition if any, may be provided 25 Oct 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantUmakant
DesignationGMRohaplant
Name of Company (Applicant Name should not be given here)UNICHEM LABORATORIES LTD
AddressUnichem Bhavan, Prabhat Estate, S.V.Road, Jogeshwari (West) Mumbai-12
Print