APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Expansion of Sugarcane Crushing Capacity from 9000 TCD to 15000 TCD, Distillery Capacity from 60 KLPD to 90 KLPD and Establishing 21 MW Co-generation Power Plant based on bagasse and 5 MW from Incineration Boiler, At Dattanagar Tal. Shirol, Dist. Kolhapur, Maharashtra by M/s. Shree Datta Shetkari Sahakari Sakhar Karkhana Ltd.
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/83106/2018
Project Cost cr
2.
S. No. in the schedule5(g) Distilleries
5(j) Sugar Industry
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 9000 TCD to 15000 TCD Sugarcane crushing, 60 KLPD to 90 KLPD Distillery, Establishment of 21 MW Co-generation Power Plant based on bagasse and 5 MW from Incineration Boiler ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/MH/IND2/83105/2001
MoEFCC file number(Previous EC)J-11011/33/2001-IA II(I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 85.46 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectA/p, Dattanagar, Tal. Shirol, Dist. Kolhapur, Maharashtra
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Agar bagh- 343 to 352, 354, 361 shirol- 251, 252, 717, 903, 129, 133/2, 135, 134, 136, 210, 213, 214, 230, 229, 232 to 237, 242, 246+241, 247 to 249, 127, 131
Town / VillageAgar bagh, Shirol
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
NIL
10.
Nearest railway station along with distance in kms Jaysingpur, 7 km
Nearest airport along with distance in kms Kolhapur, 43 km
11. Nearest Town/City/District Headquarters along with distance in kms Shirol , 0.3 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gram Panchayat - Shirol, Tal. Shirol, Dist. Kolhapur Phone no: 02322 236469
13. Name of the Applicant Mahadev
14. Registered Address Shree Datta SSSK Limited
15.
Address for correspondance:
Name of the Company SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED
Name of the Applicant Mahadev
Designation (Owner/ Partner/ CEO) MD
Pin code 416120
E-mail vishwajitshinde1@gmail.com
Telephone No. 2322-236551
Fax No. 2322-02322236600
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The total area is 85.46 hectares. A permanent change in land use shall be 2.0 hectares for the expansion of the sugar, distillery and establishing a Co-generation power plant
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Available
1.5 Construction works? Yes Additional Buildings for Boiler, Turbine, fermentation house, Sugar manufacturing unit, Effluent treatment plants, Incinerator MEE, High-pressure boiler, CPU and stack etc
1.6 Demolition works? Yes Retrofitting the existing ETP facilities
1.7 Temporary sites used for construction works or housing of construction workers? No Existing facilities shall be used.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Construction of Structures and foundations associated expansion of the Sugar, Distillery and establishing Co-generation Power Plant
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes For Sugar expansion - Mill Tandem, Evaporator, Crystallizer etc. For Distillery - Fermenters, Distillation Columns, Storage for Ethanol, Rectified Spirit, Molasses storage tanks etc. 21 + 5 MW Cogeneration power plant - Turbo generator set.
1.14 Facilities for storage of goods or materials? Yes Rectified spirit and ethanol storage tanks and molasses storage tank
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes I) Facilities for Solid waste; Mixed with press mud and sold as manure II) Facilities for treatment of water and liquid effluents Treated biologically and use for irrigation Domestic waste treatment Proposes to install STP based on root zone technique III)Raw Spent wash Treatment- Spent wash generated due to existing 60: Concentration and Incineration technology proposed 30 KLPD Distillery spentwash shall be treated based on composting principles
1.16 Facilities for long term housing of operational workers? Yes Existing facilities are adequate
1.17 New road, rail or sea traffic during construction or operation? No
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water is extracted from Krishna/Panchganga Rivers. Necessary permissions from Irrigation Dept. are available for the extraction of water from the river. Groundwater is not extracted for any use
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Required Manpower for construction activities is available locally. The raw materials for construction activities are also locally available. The decommissioned material shall be used for filling low lying areas.
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? No Manpower is available locally and thus no influx of people.
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No
2.2 Water (expected source & competing users) unit: KLD Yes The fresh Water required after the proposed expansion shall be 660 m3/day 1. Distillery 60 to 90 KLPD=360m3/day. 2. Sugar unit = Zero water requirement 3. Co-generation Power plant= 200 m3/day as makeup water for Boiler. 4. Domestic =100 m3/day Source: Krishna/Panchganga Rivers. Necessary permissions from Irrigation Dept. are available for the extraction of water from the river.
2.3 Minerals (MT) No
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Aggregate – 15000 MT Cement – 2000 MT Steel –900 MT Sand – 6000 MT Excavation – 18000 m3
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity shall be generated from the proposed Co-Generation Unit 1) Fuels used Bagasse-34560 MT/Month 2) Energy-561 MW/month (During Season) 3)Energy- 36 MW/month (During Off-season) Power Requirement Existing: 11.20 MW, Source: Urjankur Shree Datta Power company Ltd. After the proposed expansion: 18.70 MW Source: Proposed 21+ 5 MW Co-generation power plant.
2.7 Any other natural resources (use appropriate standard units) Yes Biomass such as Cane trash, Agricultural trash.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Lubricant oils for Machinery
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? No
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes Garbage. Used in composting
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil shall be recycled or burnt with bagasse in Boilers.
4.4 Other industrial process wastes Yes 1.Ash quantity around 520 MT /month from 21 MW cogeneration power plant 2. The Incinerator Boiler Ash quantity of 1200 MT/Month which is generated by burning 9 MT/hr of concentrated spent wash and 3.2 MT/hr of coal
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes 1.ETP Sludge – 3.40 MT /month (Existing) 2. ETP Sludge – 6.50 MT /month (After expansion)
4.7 Construction or demolition wastes Yes Alternations in foundations and New Foundations for turbine and buildings
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Bagasse shall be used during the season and saved bagasse & Cane trash shall be used during offseason (after proposed expansion)
5.2 Emissions from production processes Yes SO2 from sulphur burner which shall be scrubbed and CO2 from fermenters which shall be let out in the air
5.3 Emissions from materials handling including storage or transport Yes Vehicular emissions from construction vehicles, equipment, and fugitive emissions. Traffic discipline shall be maintained and all the vehicles shall be checked regularly for emission tests.
5.4 Emissions from construction activities including plant and equipment Yes Dust shall be controlled by spraying water and closing equipment. To avoid the spread of dust.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is expected due to the handling of construction material
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Only during Construction Phase: 1) Construction equipment, 2) Transportation and construction vehicles Operation Phase 1) Operations of Turbines, Boilers, Compressors, DG Sets Etc.
6.2 From industrial or similar processes Yes Operation of Turbine and turbine auxiliaries, boiler and boiler auxiliaries, Steam blow down, Compressors. Turbines, Steam exhaust, Compressors.
6.3 From construction or demolition Yes Operation of concrete mixers
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes 1) Construction Phase- Noise emanating from Vehicles carrying raw material for construction 2) Operation Phase: Noise due to movement of vehicles carrying fuel i.e. Bagasse.
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The only hazardous waste is spent oil from the ETP which is collected and mixed with bagasse and burnt in boilers. Lubricant oils which are used in the process are stored in closed drums and recycled back into the machines and thus no spillages or leakages
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Trade effluents shall be 1. Sugar Effluent: 375m3/day, Treatment: Existing Sugar ETP. 2. Cogeneration Power Plant: 160m3/day Treatment: Existing Sugar ETP. Disposal: Disposed on land for irrigation. 3. domestic: 80m3/day Treatment: proposed STP based on Root Zone Technolgy. 4. Spentwash from 60 KLPD Distillery 260 m3/day Treatment: Concentration and Incineration technology 30 KLPD Distillery: Composting
7.3 By deposition of pollutants emitted to air into the land or into water No ESP with 99.99% Efficiency shall be installed as APC equipment.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Bagasse/Spirit storages can cause a fire. Precautions are taken to provide the required fire extinguishers at appropriate places and emergency fire engines are also in place. All the spillages are collected and recycled back to process.
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Krishna River is 5 Km & Panchganga River is 3 Km away from the project site.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area No
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Hospital & Educational facilities are provided for people working in the factory, shareholders of the factory, as well as people living in nearby villages. ITI & Diploma college is established in the factory premises for the benefit of students from the families of employees, shareholders & nearby villages
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Panchganga River 3 Km & Krishna River is 5 Km
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantMahadev
DesignationMD
Name of Company (Applicant Name should not be given here)SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED
AddressShree Datta SSSK Limited
Print