APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed Expansion of Sugarcane Crushing Capacity from 9000 TCD to 15000 TCD, Distillery Capacity from 60 KLPD to 90 KLPD and Establishing 21 MW Co-generation Power Plant based on bagasse and 5 MW from Incineration Boiler, At Dattanagar Tal. Shirol, Dist. Kolhapur, Maharashtra by M/s. Shree Datta Shetkari Sahakari Sakhar Karkhana Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/83106/2018 | Project Cost | cr | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries 5(j) Sugar Industry
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 9000 TCD to 15000 TCD Sugarcane crushing, 60 KLPD to 90 KLPD Distillery, Establishment of 21 MW Co-generation Power Plant based on bagasse and 5 MW from Incineration Boiler ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/MH/IND2/83105/2001 | MoEFCC file number(Previous EC) | J-11011/33/2001-IA II(I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 85.46 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | A/p, Dattanagar, Tal. Shirol, Dist. Kolhapur, Maharashtra | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Agar bagh- 343 to 352, 354, 361 shirol- 251, 252, 717, 903, 129, 133/2, 135, 134, 136, 210, 213, 214, 230, 229, 232 to 237, 242, 246+241, 247 to 249, 127, 131 | Town / Village | Agar bagh, Shirol | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
NIL | | 10. | |
Nearest railway station along with distance in kms | Jaysingpur, 7 km | Nearest airport along with distance in kms | Kolhapur, 43 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Shirol , 0.3 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Gram Panchayat - Shirol,
Tal. Shirol, Dist. Kolhapur
Phone no: 02322 236469 | | 13. | Name of the Applicant | Mahadev | | 14. | Registered Address | Shree Datta SSSK Limited | | 15. | |
Address for correspondance: | Name of the Company | SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED | Name of the Applicant | Mahadev | Designation (Owner/ Partner/ CEO) | MD | Pin code | 416120 | E-mail | vishwajitshinde1@gmail.com | Telephone No. | 2322-236551 | Fax No. | 2322-02322236600 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The total area is 85.46 hectares. A permanent change in land use shall be 2.0 hectares for the expansion of the sugar, distillery and establishing a Co-generation power plant | 1.2 | Clearance of existing land, vegetation and buildings? | No | | 1.3 | Creation of new land uses? | No | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Available | 1.5 | Construction works? | Yes | Additional Buildings for Boiler, Turbine, fermentation house, Sugar manufacturing unit, Effluent treatment plants, Incinerator MEE, High-pressure boiler, CPU and stack etc | 1.6 | Demolition works? | Yes | Retrofitting the existing ETP facilities | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Existing facilities shall be used. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction of Structures and foundations associated expansion of the Sugar, Distillery and establishing Co-generation Power Plant | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | Yes | For Sugar expansion - Mill Tandem, Evaporator, Crystallizer etc. For Distillery - Fermenters, Distillation Columns, Storage for Ethanol, Rectified Spirit, Molasses storage tanks etc. 21 + 5 MW Cogeneration power plant - Turbo generator set. | 1.14 | Facilities for storage of goods or materials? | Yes | Rectified spirit and ethanol storage tanks and molasses storage tank | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | I) Facilities for Solid waste;
Mixed with press mud and sold as manure
II) Facilities for treatment of water and liquid effluents
Treated biologically and use for irrigation
Domestic waste treatment Proposes to install STP based on root zone technique
III)Raw Spent wash Treatment-
Spent wash generated due to existing 60: Concentration and Incineration technology proposed 30 KLPD Distillery spentwash shall be treated based on composting principles | 1.16 | Facilities for long term housing of operational workers? | Yes | Existing facilities are adequate | 1.17 | New road, rail or sea traffic during construction or operation? | No | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water is extracted from Krishna/Panchganga Rivers. Necessary permissions from Irrigation Dept. are available for the extraction of water from the river. Groundwater is not extracted for any use | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Required Manpower for construction activities is available locally. The raw materials for construction activities are also locally available. The decommissioned material shall be used for filling low lying areas. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Manpower is available locally and thus no influx of people. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The fresh Water required after the proposed expansion shall be 660 m3/day
1. Distillery 60 to 90 KLPD=360m3/day.
2. Sugar unit = Zero water requirement
3. Co-generation Power plant= 200 m3/day as makeup water for Boiler.
4. Domestic =100 m3/day
Source: Krishna/Panchganga Rivers. Necessary permissions from Irrigation Dept. are available for the extraction of water from the river. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Aggregate – 15000 MT
Cement – 2000 MT
Steel –900 MT
Sand – 6000 MT
Excavation – 18000 m3 | 2.5 | Forests and timber (source – MT) | No | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity shall be generated from the proposed Co-Generation Unit
1) Fuels used
Bagasse-34560 MT/Month
2) Energy-561 MW/month (During Season)
3)Energy- 36 MW/month (During Off-season)
Power Requirement
Existing: 11.20 MW, Source: Urjankur Shree Datta Power company Ltd.
After the proposed expansion: 18.70 MW Source: Proposed 21+ 5 MW Co-generation power plant. | 2.7 | Any other natural resources (use appropriate standard units) | Yes | Biomass such as Cane trash, Agricultural trash. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Lubricant oils for Machinery | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Garbage. Used in composting | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used Oil shall be recycled or burnt with bagasse in Boilers. | 4.4 | Other industrial process wastes | Yes | 1.Ash quantity around 520 MT /month from 21 MW cogeneration power plant
2. The Incinerator Boiler Ash quantity of 1200 MT/Month which is generated by burning 9 MT/hr of concentrated spent wash and 3.2 MT/hr of coal | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | 1.ETP Sludge – 3.40 MT /month (Existing)
2. ETP Sludge – 6.50 MT /month (After expansion) | 4.7 | Construction or demolition wastes | Yes | Alternations in foundations and New Foundations for turbine and buildings | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Bagasse shall be used during the season and saved bagasse & Cane trash shall be used during offseason (after proposed expansion) | 5.2 | Emissions from production processes | Yes | SO2 from sulphur burner which shall be scrubbed and CO2 from fermenters which shall be let out in the air | 5.3 | Emissions from materials handling including storage or transport | Yes | Vehicular emissions from construction vehicles, equipment, and fugitive emissions. Traffic discipline shall be maintained and all the vehicles shall be checked regularly for emission tests. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust shall be controlled by spraying water and closing equipment. To avoid the spread of dust. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is expected due to the handling of construction material | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Only during Construction Phase:
1) Construction equipment,
2) Transportation and construction vehicles
Operation Phase
1) Operations of Turbines, Boilers, Compressors, DG Sets Etc. | 6.2 | From industrial or similar processes | Yes | Operation of Turbine and turbine auxiliaries, boiler and boiler auxiliaries, Steam blow down, Compressors. Turbines, Steam exhaust, Compressors. | 6.3 | From construction or demolition | Yes | Operation of concrete mixers | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | 1) Construction Phase- Noise emanating from Vehicles carrying raw material for construction
2) Operation Phase: Noise due to movement of vehicles carrying fuel i.e. Bagasse. | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The only hazardous waste is spent oil from the ETP which is collected and mixed with bagasse and burnt in boilers. Lubricant oils which are used in the process are stored in closed drums and recycled back into the machines and thus no spillages or leakages | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Trade effluents shall be
1. Sugar Effluent: 375m3/day,
Treatment: Existing Sugar ETP.
2. Cogeneration Power Plant: 160m3/day Treatment: Existing Sugar ETP.
Disposal: Disposed on land for irrigation.
3. domestic: 80m3/day
Treatment: proposed STP based on Root Zone Technolgy.
4. Spentwash from 60 KLPD Distillery 260 m3/day
Treatment: Concentration and Incineration technology
30 KLPD Distillery: Composting | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | ESP with 99.99% Efficiency shall be installed as APC equipment. | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Bagasse/Spirit storages can cause a fire. Precautions are taken to provide the required fire extinguishers at appropriate places and emergency fire engines are also in place. All the spillages are collected and recycled back to process. | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | No | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Krishna River is 5 Km & Panchganga River is 3 Km away from the project site. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | No | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | Hospital & Educational facilities are provided for people working in the factory, shareholders of the factory, as well as people living in nearby villages.
ITI & Diploma college is established in the factory premises for the benefit of students from the families of employees, shareholders & nearby villages | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Panchganga River 3 Km & Krishna River is 5 Km | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Mahadev | Designation | MD | Name of Company (Applicant Name should not be given here) | SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED | Address | Shree Datta SSSK Limited |
| |
|