APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Establishment of 60 KLPD Molasses based distillery by Pannageshwar Sugar Mills Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/82994/2018 | Project Cost | 6549 lacs | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed 60 KLPD Molasses Based Distillery ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 41.68 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 968,969,970,974 | Town / Village | Pangaon | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Latur | Renapur | | 10. | |
Nearest railway station along with distance in kms | Pangaon, 2.53 km | Nearest airport along with distance in kms | Latur, 44 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Renapur , 9.85 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Pangaon Grampanchayat | | 13. | Name of the Applicant | Surkant | | 14. | Registered Address | At Pangaon, Tal.: Renapur, Dist.: Latur | | 15. | |
Address for correspondance: | Name of the Company | PANNAGESHWAR SUGAR MILLS LTD. | Name of the Applicant | Surkant | Designation (Owner/ Partner/ CEO) | GeneralManager | Pin code | 431522 | E-mail | psmlpangaon@gmail.com | Telephone No. | 02382-236043 | Fax No. | 02382-236309 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Total land acquired by project proponent for Industrial purpose is 103 Acres. The land proposed for establishment of distillery is 7 Acres. This entire land is a flat terrain. There would be no change in land use pattern since expansion of project will be carried out in existing premises. Also, the land was kept vacant for establishment of proposed distillery. Refer Additional attachment for the plot layout. | 1.2 | Clearance of existing land, vegetation and buildings? | No | There would be no any requirement of vegetation clearance since presently the land is being used for industrial activities by PSML. A land was kept vacant for establishment of distillery in premises of PSML. Hence there will not be need of major clearance of vegetation required. | 1.3 | Creation of new land uses? | Yes | Infrastructural facilities like production unit, fermentation tank, distillation unit, spentwash storage tanks, Multiple Effect Evaporator (MEE), incineration boiler etc. required for establishing and operating of proposed 60 KLPD molasses based distillery. Moreover, green belt would be augmented under proposed project. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not applicable as establishment of distillery would be carried out in existing premises of PMSL. | 1.5 | Construction works? | Yes | Under Proposed establishment of distillery infrastructure like fermentation tanks, distillation column, spentwash storage tanks, alcohol storage tanks, boiler shed, cooling towers etc. would be built on site. | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Temporary sheds for labors would be constructed on site which would be removed after completion of the construction work. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | Not Applicable | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | No | There would be no physical change in existing topography and land use of locality since production and manufacturing operations shall be executed in sugar factory premises already acquired by Industry. Refer Additional attachment for flow chart of manufacturing process. | 1.14 | Facilities for storage of goods or materials? | Yes | For the storage of sugar; godowns are provided on site. Additional storage arrangement shall be done after expansion activities. These proposed storage arrangement shall be done on land area which is already reserved for storage activities in the premises.
For the storage of raw materials and finished product (Alcohol) in distillery; separate arrangements would be done. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | Under proposed Distillery, solid waste generated: Yeast Sludge@ 300 KL/M,CPU Sludge@ 5 MT/M. Same will burnt in boiler. No Hazardous Waste will be generated from distillery. Raw sp. wash @ 480 CMD shall be conc. in MEE & burnt in boiler. | 1.16 | Facilities for long term housing of operational workers? | Yes | There would be no any housing scheme on site for workers. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There would be no change in hydrology of water sources due to PSML project. Water required for the PSML activities would be taken from PSML water supply scheme (Rena River). | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | No ground water shall be used for any industrial activity. The water required for various operations under proposed additional production activities would be met from PSML water supply scheme (Rena River). | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of material and personnel would occur during project construction period as well as during operation. During same, movement of equipment and machinery as well as labor would occur at the project site. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporarily for construction work there would be influx of people to project site. However, it would be of a temporary nature. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The proposed distillery project would be executed in sugar factory premises. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Under proposed distillery, 653 CMD water will be required. 440 CMD will be treated water from Distillery CPU, 211 CMD will be fresh water and 3 CMD will be treated water from STP. | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The required construction material would be purchased from nearby sources through the authorized dealers | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power required for construction work would be taken existing turbine as well as proposed turbine. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | The product from proposed distillery – Ethanol, Rectified spirit, Extra Neutral Alcohol (ENA) shall be stored in tank which is highly flammable. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | There is no such report of occurrence of any waterborne diseases or any disease vectors. Moreover, after establishment of the project, industry would hire qualified doctors to carry out regular health checkups of every worker. Also, record w.r.t same would be maintained on site. Programs related to health and hygiene will be arranged and workshops as well as seminars would be conducted in industry to create awareness. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The local people would be given employment. This may help to improve the life style of local people in surrounding area. There would be a positive impact on the social and economic status of local people due to direct and indirect employment opportunities. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | During construction of building and infrastructure required for proposed project, there would be activities such as excavation, back filling etc. However, once the construction gets over, the entire excess soil, if any, would be utilized through proper landscaping in the premises of the industry. | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Not Applicable | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Hazardous Waste generated from existing sugar factory is Spent Oil (Cat. No. 5.1) – 0.2 MT/M Same will be burnt in boiler. No any hazardous waste will be generated from proposed distillery. | 4.4 | Other industrial process wastes | Yes | Solid waste generated would be in the form of Yeast sludge and CPU Sludge which would be to the tune of 300 KL/M and 5 MT/M respectively. Same shall be burnt in incineration boiler. | 4.5 | Surplus product | No | Not Applicable. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Refer Point No. 4.4 above. | 4.7 | Construction or demolition wastes | Yes | Negligible quantity of construction waste would be generated same would be used for filling low lying areas in factory premises. Scrap if any shall be sold to outside parties for reuse. | 4.8 | Redundant machinery or equipment | No | Not Applicable. | 4.9 | Contaminated soils or other materials | No | Not Applicable. | 4.10 | Agricultural wastes | No | Not Applicable. | 4.11 | Other solid wastes | No | Not Applicable. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Steam required for existing sugar factory is met from 40 TPH Bagasse fired boiler. Wet scrubber as APC along with a stack of 60 M height is provided. 2 DG sets of capacities 320 KVA and 250 KVA is already installed on site.
Under proposed establishment of distillery an incineration boiler of 18 TPH will be installed. ESP will be installed to the same as APC. Steam will be taken from turbine of 2.5 MWH capacity. | 5.2 | Emissions from production processes | Yes | From sugar manufacturing operations there would be no any process emissions.
From proposed distillery there would be process emissions in the form CO2 & air from Fermenters. CO2 from Fermenters would be collected, purified, compressed and filled in cylinders that would be sold out for production of Beverages. Thus, no any problems to the surrounding area would be created due to the Air Pollution aspect. | 5.3 | Emissions from materials handling including storage or transport | Yes | Negligible amount of emissions would be generated from storage or transport. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust would be generated during construction activity. Same shall be curbed by sprinkling water in premises. Also, during assembling the pre fabricated structure of tank & column there may be emissions from welding activity. But same may be negligible & temporary. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Molasses and spentwash are putrifiable substances. Hence, if GMP are not followed then it may lead to odor nuisance | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable, since no any waste would be burnt in open air | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Probable sources of noise shall be cane carrier, turbines, mills, pumps, centrifuge, compressors, boiler house & distillation assembly etc. Trucks/tractors will be used for transportation of raw material & finished product. Workers entering workzone area like boiler house, mill house, centrifuge etc. would be provided with proper PPE.Proper acoustic treatments would be provided to keep ambient noise levels below permissible limits as per the CPCB standards. | 6.2 | From industrial or similar processes | Yes | Same as above point no. 6.1 | 6.3 | From construction or demolition | Yes | During construction, installation of new equipments/ machineries minor noise would be generated from fabrication work and operations of machinery. However, the same would be of a temporary nature and the workers getting exposed to same would be provided with PPE. | 6.4 | From blasting or piling | No | Not Applicable. | 6.5 | From construction or operational traffic | Yes | Negligible. Noise would be generated by movement of trucks for construction material. However, this would not be of a continuous nature and would not have much impact on the work environment of the project site. | 6.6 | From lighting or cooling systems | No | Not Applicable. | 6.7 | From any other sources | No | Not Applicable. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Ethanol, the product of distillery is a hazardous chemical as per MSIHC rules. Same will be stored on site as per OISD standards. Handling of alcohol will be done through closed and automatic system. Also, fire frightening system and Dyke walls will be provided around alcohol storage tank. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Effluent from proposed distillery-sp.wash, sp.lees & other effluents (boiler & cooling b/d, eff. from lab & washings). Raw spt. wash @ 480 CMD - conc. in MEE–Conc. sp.wash @ 96CMD-burnt in incineration boiler. Sp.lees@85CMD, MEE condensate @384CMD &other effluents @20CMD -treat in proposed CPU& reused. Achieving ZLD. Domestic effluent @ 4 CMD would be treated in proposed STP alongwith existing sugar factory domestic sewage. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | ESP along with stack of 60 M height is provided to existing boiler.
Under proposed establishment of distillery an incineration boiler of capacity 18 TPH will be installed. ESP will be providing to the same along with adequate height of stack as APC. This will prevent deposition of fly ash on Land or any other surface; hence there would be no any nuisance to the surrounding area. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Hazard prone area would be alcohol storage area. Alcohol storage area would be designed and constructed as per the OISD norms. Also fire fighting arrangement will be provided as per government norms. Workers would be given the Fire-Fighting Training as well as made aware of the accident prone areas in the plant. Also, proper housekeeping would be maintained in the production and storage areas | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The possibility of project getting affected by earthquake resulting in to subsequent environmental damage is very negligible. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Permanent buildings, structures as required for establishment & operation of project would be built. Moreover, there would be development of roads inside the plant area as well as power supply arrangements for plant & machinery operations & for lighting. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | No | Not Applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Not Applicable | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | SH-168 - 10.0 Km from project site
NH - 204 - 20.70 Km from project site | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | Taluka Renapur | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | Not Applicable | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Rena river is 20.00 Km from project site. No ground water is used under existing sugar factory as well as proposed distillery establishment. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
NOC |
| | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 26 Oct 2018 | 2. | NA | Please fill project name (not PPs name) in S.No. 1 of Form 1 | 22 Oct 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Surkant | Designation | GeneralManager | Name of Company (Applicant Name should not be given here) | PANNAGESHWAR SUGAR MILLS LTD. | Address | At Pangaon, Tal.: Renapur, Dist.: Latur |
|
|