APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Sugar unit from 5000 to 8000 TCD, Cogeneration from 19.5 to 30 MW and Distillery from 30 to 60 KLPD
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/82987/2018
Project Cost 1760 lacs
2.
S. No. in the schedule5(g) Distilleries
5(j) Sugar Industry
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Distillery 60 KLPD, Sugar Unit 8000 TCD and Cogeneration 30 MW ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/MH/IND2/82986/2012
MoEFCC file number(Previous EC)SEAC-3012/CR32I/TC2
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 30 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage: Kuditre, Tal. Karvir, Dist. Kolhapur
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.274 - 279, 304-306
Town / VillageVillage: Kuditre
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraKolhapurKarvir
10.
Nearest railway station along with distance in kms Kolhapur, 15 km
Nearest airport along with distance in kms Kolhapur, 18 km
11. Nearest Town/City/District Headquarters along with distance in kms Kolhapur , 15 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) At/Post- Kuditre, Tal. Karveer, Dist. Kolhapur, Maharashtra
13. Name of the Applicant Prakash
14. Registered Address A/P. Kuditre, Tal. Karvir, Dist. Kolhapur
15.
Address for correspondance:
Name of the Company KUMBHI SSK
Name of the Applicant Prakash
Designation (Owner/ Partner/ CEO) MD
Pin code 416204
E-mail md@kumbhisugar.com
Telephone No. 0231-2444222
Fax No. 0231-2444220
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Since, the land is already under the possession of the industry (industrial land use). Industry already has land in existing industrial shed for proposed expansion
1.2 Clearance of existing land, vegetation and buildings? No No clearance is required since existing land is open and having seasonal weeds and bushes, hence no vegetation clearance required as well as building clearance is not required
1.3 Creation of new land uses? No Though the site is open, it is already under the possession of the factory, hence it is considered under industrial land use
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not available
1.5 Construction works? Yes Construction work involves - foundation for various units required for expansion of sugar, distillery and cogeneration unit
1.6 Demolition works? No No demolition is needed
1.7 Temporary sites used for construction works or housing of construction workers? No Not required since the sugar factory is having housing colony which may be made available to the construction workers
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Above ground structures include ancillary units, bagasse storage yards, sugar godowns, office, Bio-composting yard, etc. Excavation- will be required for foundation of industrial unit and for spentwash storage lagoons
1.9 Underground works including mining or tunnelling? No Not required
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Enclosed as Annexure I
1.14 Facilities for storage of goods or materials? Yes Storage of sugar bag in godowns, RS/ENA and molasses in MS tank as per norms of regulatory authority
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Liquid Waste: The generated wastewater from sugar and co-generation unit i.e. 800 m3 will be treated in existing ETP. Distillery effluent 600m3. Solid waste: ETP sludge will be used as a soil enriching material. Ash disposed off through the process of composting or sold to brick manufactures.
1.16 Facilities for long term housing of operational workers? No Existing colony could easily accommodate the minor increase Mainly local candidates will be employed
1.17 New road, rail or sea traffic during construction or operation? No Existing infrastructure will be utilized for proposed unit
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports, etc. required. Existing road and other infrastructure will be used.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Project will not affect any of the existing transport routes or infrastructure that may lead in to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No Not required
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not required
1.22 Stream crossings? No No stream crossing at/near the site.
1.23 Abstraction or transfers of water from ground or surface waters? No NA
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No NA
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Through authorized transporters only. Steel, cement, stone, sand etc. will be transported for construction/foundation work from the nearby market thro’ authorized transporters. workers during construction and operation will be preferred from local area only, thus transportation of workers will be mainly through available local public transportation facilities or personal facilities
1.26 Long-term dismantling or decommissioning or restoration works? No There is no dismantling order commissioning work involved in the project
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No There is no ongoing activity of Decommissioning; hence no impact on the environment
1.28 Influx of people to an area in either temporarily or permanently? Yes Minor temporary influx during construction phase and minor permanent during operation phase(only 40 - 50 permanent employment will be available through the project)
1.29 Introduction of alien species? No There is no such possibility of introduction of alien species in and around the industrial unit due to the project
1.30 Loss of native species or genetic diversity? No NA
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Sugar factory have total 59.55 acres of land. Out of which 36.31 acres of land is allotted for existing and proposed sugar, cogeneration, distillery and its auxiliary units (including land for waste handling/disposal as well as for greenbelt development).
2.2 Water (expected source & competing users) unit: KLD Yes 254 m3/day for Sugar & Cogen in season. 795 m3/day for Sugar & Cogen in off-season. 481 m3/day for Distillery. Source: Kumbhi River
2.3 Minerals (MT) No NA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All the construction material will be locally sourced as per requirement Excavated soil and earth material will be used wherever feasible and in consultation with civil engineers
2.5 Forests and timber (source – MT) No It will be required only for office furniture; therefore, the requirement will be very minor
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Particulars Season Off-Season A. Sugar + Cogeneration. Season Off season Fuel(MT/D) 1813.33 746.66 Steam(MT/D) 4080 1680 Power(MW/h) 30.00 12.50 B. Distillery unit Fuel (MT) Coal(50 MT) & Spentwash (150 MT)
2.7 Any other natural resources (use appropriate standard units) No Not required
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No There won’t be any use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No such possibility involved with the project
3.3 Affect the welfare of people e.g. by changing living conditions? No There won’t be any negative impact on socio-economic condition of the people; however, socio-economic conditions may get improved since, the proposed unit will provide many direct and indirect employment opportunities
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No There is no such probability
3.5 Any other causes No NA
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Soil from the construction areas, excavated for foundation of machines or construction of storage lagoon. It will be used within the premises for leveling, internal roads, etc
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic waste will be in small quantities, compostable and recyclable
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes DG set waste oil (spent oil) Generation of scrap oil will be very minor since, power source will be captive. It will be mixed with Bagasse and burnt in the boiler or sold to MPCB authorized agency; DG set will be used rarely at the time of total power failure only.
4.4 Other industrial process wastes No No any
4.5 Surplus product No No any
4.6 Sewage sludge or other sludge from effluent treatment Yes Settled sludge from ETP will be used as manure
4.7 Construction or demolition wastes Yes Construction waste will be very minor and disposed off as per norms
4.8 Redundant machinery or equipment No No any
4.9 Contaminated soils or other materials No No any
4.10 Agricultural wastes No No any
4.11 Other solid wastes Yes Estimated generation of boiler ash bottom + fly ash is around 4395 TPA during season and 896 TPA for off-season. It will be supplied to farmers as a potash enriching material or sold to brick manufacturers. ETP sludge will be 15 TPA. It will be used in manure.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Boiler will be bagasse, spentwash and coal fired; emissions from combustion of fuel i.e. bagasse, spentwash and coal – mainly particulate matter SOx and NOx in minor quantities - due to presence of S and N in bagasse in traces
5.2 Emissions from production processes No No any
5.3 Emissions from materials handling including storage or transport Yes Minor dust emission due to handling of bagasse, coal and ash
5.4 Emissions from construction activities including plant and equipment Yes Negligible and temporary
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust generation during construction phase for a brief period.
5.6 Emissions from incineration of waste No No any waste incineration involved in the project
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No any open burning required in the project
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise and/or vibrations, mainly from machinery, steam generators, motors and pumps, boiler, etc. Adequate control measures will be adopted for controlling noise as well as vibrations
6.2 From industrial or similar processes Yes Noise will be generated by operation of machinery and equipment’s of the unit
6.3 From construction or demolition Yes Noise generation will be temporary from construction machinery and transportation
6.4 From blasting or piling No NA
6.5 From construction or operational traffic Yes Construction materials will be transported by road. Raw material transportation through surface transport. This will generate noise.
6.6 From lighting or cooling systems No NA
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Molasses storage will be as per the regulatory authority guidelines; will be stored and disposed as per the CREP guidelines. Hence, probability of such contamination may occur only in case of accidental leakages/spillages of molasses.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Since, Zero Liquid Discharge (ZLD) guidelines under CREP will be implemented; hence, no such probability of such contamination (except accidental spillage) due to effluent storage and disposal
7.3 By deposition of pollutants emitted to air into the land or into water No Since, particulate matter will be the source of pollutant, ESP and wet scrubber for existing boiler is installed to control air pollutants
7.4 From any other sources No No any
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No any
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risk of fire hazard due to storage of bagasse and molasses. Molasses and spirit storage areas are prone to such risk
8.2 From any other causes No No any
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No any previous incidences of landslides or cloudburst or floods have been reported for the area of proposed site Seismic zone III
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Minor developments are anticipated in the vicinity due to the project
9.2 Lead to after-use of the site, which could have an impact on the environment No NA
9.3 Set a precedent for later developments Yes May be due to the improvement in socio economic conditions by way of employment opportunities could partially lead to further developments in the area
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NA
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No NA
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No NA
4 Inland, coastal, marine or underground waters No NA
5 State, National boundaries No NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No NA
7 Defence installations No NA
8 Densely populated or built-up area Yes KOLHAPUR (15 KM)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes KOLHAPUR (15 KM)
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No No Any
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No Any
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Seismic zone III
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantPrakash
DesignationMD
Name of Company (Applicant Name should not be given here)KUMBHI SSK
AddressA/P. Kuditre, Tal. Karvir, Dist. Kolhapur
Print