APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | New 30 KLPD Molasses Based Distillery | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/82882/2018 | Project Cost | 5423 lacs | |
| 2. | |
S. No. in the schedule | 5(g) Distilleries
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 30 KLPD ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Materewadi | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Gat No. 328,329,330 | Town / Village | Materewadi (Rajaramnagar) | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Nashik | Dindori | | 10. | |
Nearest railway station along with distance in kms | Niphad, 26 km | Nearest airport along with distance in kms | Nashik, 30 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Dindori , 12 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | At village Materewadi (Rajaramnagar), Tal. Dindori, Dist.-Nashik, Maharashtra-422209 | | 13. | Name of the Applicant | Balasaheb | | 14. | Registered Address | Kadwa Sahakari Sakhar Karkhana Ltd, Materewadi (Rajaramnagar)At.Post.Materewadi Tal.Dindori Dist.Nashik. | | 15. | |
Address for correspondance: | Name of the Company | KADWA SHAHAKARI SAKHAR KARKHANA LTD MATEREWADI | Name of the Applicant | Balasaheb | Designation (Owner/ Partner/ CEO) | ManagingDirector | Pin code | 422209 | E-mail | kadwasakar@yahoo.com | Telephone No. | 02557-237182 | Fax No. | 02557-237185 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Since, the land is already under the possession of the industry (industrial land use) and the plot near the sugar mill will be developed into a distillery | 1.2 | Clearance of existing land, vegetation and buildings? | No | No need of clearance for existing land and buildings Vegetation in the form of wild grasses and shrubs need to be cleared | 1.3 | Creation of new land uses? | Yes | Due to erection of the distillery and its ancillary unit on existing barren land | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not available | 1.5 | Construction works? | Yes | Construction work involves - foundation for various units of distillery, boiling house, spent wash storage lagoons, storage tanks, office and other ancillary set up | 1.6 | Demolition works? | No | No demolition is needed | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Local workers from neighboring areas will be used so there is no need for their housing. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction work involves – distillery and fermentation unit, spirit storage tanks, office and other ancillary set up
Excavation work involves foundation for various units of distillery, MEE, spent wash storage lagoons | 1.9 | Underground works including mining or tunnelling? | No | Not required | 1.10 | Reclamation works? | No | Not required | 1.11 | Dredging? | No | Not required | 1.12 | Offshore structures? | No | Not required | 1.13 | Production and manufacturing processes? | Yes | Molasses is diluted and feed to fermentation tanks where yeast converts the reducing sugars of molasses into alcohol. This alcohol is separated from rest of waste material by the process of distillation. The process produces wastewater in the form of spentwash, spent lees and solid waste in the form of sludge. | 1.14 | Facilities for storage of goods or materials? | Yes | Molasses storage tanks
Existing: 2 Nos. having capacity 4000 MT each
Proposed: Rectified spirit storage tanks 600M3, ENA storage tanks 600M3, Impure spirit storage tank 200M3 | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Spent wash will be treated in following way.
Primary treatment: Multi Effect Evaporation (MEE)
Secondary treatment: Bio-composting
Spent lees and condensate: Condensate Polishing unit (CPU)
Sludge and ash: Composting
Holding tanks/lagoons for temporary storage of spentwash | 1.16 | Facilities for long term housing of operational workers? | No | Mostly, factory will hire local candidates but for few requirements housing will be provided in the existing apartments only (Developed for sugar unit) | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing facilities will be utilized for proposed unit | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | No new road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports, etc. required.
Existing road and other infrastructure will be used. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No need for closure or diversion of
existing transport routes or infrastructure leading to changes in traffic movements. | 1.20 | New or diverted transmission lines or pipelines? | No | No need of such diversion | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No such changes to the hydrology of water courses or aquifers | 1.22 | Stream crossings? | No | No stream crossing at/near the site. | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No Need | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not required | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Steel, cement, stone, sand etc shall be transported for
construction /foundation work from the nearby market thro’
authorized transporters. Workers during construction and operation through’ authorized transporters | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not required | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | No decommissioning | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Very Minor | 1.29 | Introduction of alien species? | No | There is no possibility of introduction of alien species due to
the project | 1.30 | Loss of native species or genetic diversity? | No | There would not be any loss of native
species or genetic diversity due to the project | 1.31 | Any other actions? | No | -- | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The sugar factory is holding adequate land, from which land will be allocated for distillery unit and ancillary activities in the following manner. Unit Land Allocation (in Acre) Distillery, evaporation & storage lagoon: 4.0, Biocomposting :6.0
Greenbelt: 4.0 Total: 14 | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water requirement = 1128 m3/day
Total fresh water requirement =543 m3/day
Recycle water =585 m3/day
Source :-Back water of Palkhed Dam (~4 KM) | 2.3 | Minerals (MT) | Yes | As per requirement – it will be sourced from nearby area | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | As per requirement – it will be sourced from nearby area | 2.5 | Forests and timber (source – MT) | Yes | Very minor timber for doors and furniture purpose | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity–1.0 MW – captive power generation is proposed in distillery.
Alternative source: supply from state electricity board. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not required | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | No change in occurrence of disease or affect disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Living conditions are anticipated to improve due to employment received from the project | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No vulnerable groups of people would be affected by the project. | 3.5 | Any other causes | No | No any | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | Soils and stones due to excavation for foundations as well as spentwash storage lagoons | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic waste is in small quantities. No additional residential colony is proposed. Local workers will be employed | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | There is no hazardous waste generation | 4.4 | Other industrial process wastes | No | No any | 4.5 | Surplus product | No | No any | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from fermenters, CPU/ETP (~1-2.5TPD) | 4.7 | Construction or demolition wastes | Yes | Construction waste will be very minor and disposed off as per norms of local authority | 4.8 | Redundant machinery or equipment | No | No any | 4.9 | Contaminated soils or other materials | No | No any | 4.10 | Agricultural wastes | No | No any | 4.11 | Other solid wastes | Yes | Ash due to burning of bagasse in the furnace (~2.35 TPD) | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Bagasse and biogas will be used as fuel in the boiler, it will produce SPM and CO2, SO2. Diesel will be used fort rucks, all being mobile sources. They are likely to produce HC, PM, SO2& NOx | 5.2 | Emissions from production processes | Yes | Mainly CO2 from fermentation process | 5.3 | Emissions from materials handling including storage or transport | Yes | Particulate matter due to handling of bagasse, boiler ash, movements of vehicles etc. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Mainly particulate matter due construction activity and
Particulate matter, HC, CO2 and NO2 due to use of diesel engine based construction machinery | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Odour due to spent wash storage | 5.6 | Emissions from incineration of waste | No | Incineration is not involved | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | No need of such open burning | 5.8 | Emissions from any other sources | No | -- | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Mainly Noise - from pumps and motors, machinery, conveyors, etc. | 6.2 | From industrial or similar processes | Yes | Noise from boiler unit | 6.3 | From construction or demolition | Yes | Due to operation of construction equipments | 6.4 | From blasting or piling | No | Not required | 6.5 | From construction or operational traffic | Yes | Minor increase in traffic due to transportation of finished product | 6.6 | From lighting or cooling systems | No | No Noise due to cooling tower | 6.7 | From any other sources | No | -- | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Due to accidental release or spillage of spent wash | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Due to handling and storage of spent wash; it will be disposed off by bio-composting. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Composting process is anticipated to produce CO2 and methane | 7.4 | From any other sources | No | No Any | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | The pollutants are biodegradable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Molasses and spirit storage areas are prone to such risk | 8.2 | From any other causes | No | -- | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The site is located in Seismic Zone III
In this zone, the probable earthquake intensity of 5 to 7 Richter scale could be observed | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Minor developments are anticipated in the vicinity due to the project | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | NA | 9.3 | Set a precedent for later developments | No | NA | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | NA | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | NA | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | NA | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | NA | 4 | Inland, coastal, marine or underground waters | No | NA | 5 | State, National boundaries | No | NA | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NA | 7 | Defence installations | No | NA | 8 | Densely populated or built-up area | No | NA | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Dindori (12km) | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | NA | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NA | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Seismic zone III | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Balasaheb | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | KADWA SHAHAKARI SAKHAR KARKHANA LTD MATEREWADI | Address | Kadwa Sahakari Sakhar Karkhana Ltd, Materewadi (Rajaramnagar)At.Post.Materewadi Tal.Dindori Dist.Nashik. |
| |
|