APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s New 30 KLPD Molasses Based Distillery
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/82847/2018
Project Cost 6099.36 lacs
2.
S. No. in the schedule5(g) Distilleries
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 30 KLPD ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 00 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKurunda
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.291
Town / VillageKurunda
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraHingoliBasmath
(2.)MaharashtraHingoliBasmath
10.
Nearest railway station along with distance in kms Basmath, 18 km
Nearest airport along with distance in kms Nanded, 30 km
11. Nearest Town/City/District Headquarters along with distance in kms Basmath , 18 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village: Pardi Bk. (Kurunda), Tal: Basmath, Dist: Hingoli
13. Name of the Applicant Keshav
14. Registered Address Village: Kurunda, Tq. Basmath
15.
Address for correspondance:
Name of the Company TOKAI SAHAKARI SAKHAR KARKHANA LTD
Name of the Applicant Keshav
Designation (Owner/ Partner/ CEO) MD
Pin code 431512
E-mail tokaissk@gmail.com
Telephone No. 02454-223111
Fax No. 02454-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Since, the land is already under the possession of the industry (industrial land use) and the plot near the sugar mill will be developed into a distillery
1.2 Clearance of existing land, vegetation and buildings? No No need of clearance for existing land and buildings Vegetation in the form of wild grasses and shrubs need to be cleared
1.3 Creation of new land uses? Yes Due to erection of the distillery and its ancillary unit on existing barren land
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not available
1.5 Construction works? Yes Construction work involves - foundation for various units of distillery, boiling house, spent wash storage lagoons, storage tanks, office and other ancillary set up
1.6 Demolition works? No No demolition is needed
1.7 Temporary sites used for construction works or housing of construction workers? No Local workers from neighboring areas will be used so there is no need for their housing.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Construction work involves – distillery and fermentation unit, spirit storage tanks, office and other ancillary set up Excavation work involves foundation for various units of distillery, MEE, spent wash storage lagoons
1.9 Underground works including mining or tunnelling? No Not required
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Molasses is diluted and feed to fermentation tanks where yeast converts the reducing sugars of molasses into alcohol. This alcohol is separated from rest of waste material by the process of distillation. The process produces wastewater in the form of spentwash, spent lees and solid waste in the form of sludge.
1.14 Facilities for storage of goods or materials? Yes Molasses storage tanks Existing: 1 Nos. having capacity 6000MT each Proposed: Rectified spirit storage tanks 600M3, ENA storage tanks 600M3, Impure spirit storage tank 200M3
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Spent wash will be treated in following way. Primary treatment: Multi Effect Evaporation (MEE) Secondary treatment: Incineration Spent lees and condensate: Condensate Polishing unit (CPU) Sludge and ash: Incineration Holding tanks/lagoons for temporary storage of spentwash
1.16 Facilities for long term housing of operational workers? No Mostly, factory will hire local candidates but for few requirements housing will be provided in the existing apartments only (Developed for sugar unit)
1.17 New road, rail or sea traffic during construction or operation? No Existing facilities will be utilized for proposed unit
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports, etc. required. Existing road and other infrastructure will be used.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No need for closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No No need of such diversion
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No such changes to the hydrology of water courses or aquifers
1.22 Stream crossings? No No stream crossing at/near the site
1.23 Abstraction or transfers of water from ground or surface waters? No No Need
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not required
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Steel, cement, stone, sand etc shall be transported for construction /foundation work from the nearby market thro’ authorized transporters. Workers during construction and operation through’ authorized transporters
1.26 Long-term dismantling or decommissioning or restoration works? No Not required
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No decommissioning
1.28 Influx of people to an area in either temporarily or permanently? Yes Very Minor
1.29 Introduction of alien species? No There is no possibility of introduction of alien species due to the project
1.30 Loss of native species or genetic diversity? No There would not be any loss of native species or genetic diversity due to the project
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The sugar factory is holding ~75 acres of land, from which land will be allocated for distillery unit and ancillary activities in the following manner. Unit Land Allocation (in Acre) Distillery, evaporation & storage lagoon: 2.0 Greenbelt: 1.5 Total: 3.5
2.2 Water (expected source & competing users) unit: KLD Yes Total water requirement = 980m3/day Total fresh water requirement =336 m3/day Recycle water =336m3/day Source :- Urdhwa Painganga canal
2.3 Minerals (MT) Yes As per requirement – it will be sourced from nearby area.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes As per requirement – it will be sourced from nearby area.
2.5 Forests and timber (source – MT) Yes Very minor timber for doors and furniture purpose
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity–1.0 MW – captive power generation is proposed in distillery. Alternative source: supply from state electricity board.
2.7 Any other natural resources (use appropriate standard units) No Not required
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No change in occurrence of disease or affect disease vectors
3.3 Affect the welfare of people e.g. by changing living conditions? No Living conditions are anticipated to improve due to employment received from the project
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No vulnerable groups of people would be affected by the project.
3.5 Any other causes No --
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Minor, only from plinth construction
4.2 Municipal waste (domestic and or commercial wastes) Yes Domestic waste is in small quantities. No additional residential colony is proposed. Local workers will be employed
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No There is no hazardous waste generation
4.4 Other industrial process wastes No No Any
4.5 Surplus product No No Any
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from fermenters, CPU/ETP (~1-2.5TPD)
4.7 Construction or demolition wastes Yes Construction waste will be very minor and disposed off as per norms of local authority
4.8 Redundant machinery or equipment No No any
4.9 Contaminated soils or other materials No No any
4.10 Agricultural wastes No No any
4.11 Other solid wastes Yes Ash due to burning of bagasse in the furnace (~3-4 TPD)
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Bagasse and spent wash will be used as fuel in the boiler, it will produce SPM and CO2, SO2. Diesel will be used fort rucks, all being mobile sources. They are likely to produce HC, PM, SO2& NOx
5.2 Emissions from production processes Yes Mainly CO2 from fermentation process
5.3 Emissions from materials handling including storage or transport Yes Particulate matter due to handling of bagasse, boiler ash, movements of vehicles etc.
5.4 Emissions from construction activities including plant and equipment Yes Mainly particulate matter due construction activity and Particulate matter, HC, CO2 and NO2 due to use of diesel engine based construction machinery
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Odour due to spent wash storage
5.6 Emissions from incineration of waste Yes Bagasse and spent wash will be used as fuel in the incineration boiler, it will produce SPM and CO2,SO2.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No need of such open burning
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Mainly Noise - from pumps and motors, machinery, conveyors, etc.
6.2 From industrial or similar processes Yes Noise from boiler unit
6.3 From construction or demolition Yes Due to operation of construction equipment's
6.4 From blasting or piling No Not required
6.5 From construction or operational traffic Yes Minor increase in traffic due to transportation of finished product
6.6 From lighting or cooling systems No No Noise due to cooling tower
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Due to accidental release or spillage of spent wash, Molasses, spirit etc.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Due to handling and storage of spentwash; it will be disposed off by incinerating in the boiler
7.3 By deposition of pollutants emitted to air into the land or into water No NA
7.4 From any other sources No NA
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No NA
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Molasses and spirit storage areas are prone to such risk
8.2 From any other causes No NA
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The site is located in Seismic Zone II In this zone, the probable earthquake intensity of 5 Richter scale could be observed
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Minor developments are anticipated in the vicinity due to the project
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments No NA
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No NA
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NA
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No NA
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No NA
4 Inland, coastal, marine or underground waters No NA
5 State, National boundaries No NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No NA
7 Defence installations No NA
8 Densely populated or built-up area No NA
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Kurunda (05 km), Basmath (15 km)
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No NA
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No NA
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Seismic zone II
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
Additional Attachments, if any
Attached File
EDS Complience
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 23 Oct 2018
2.NAAvailability of the proposed land with the PP and permission for its industrial use may be provided 18 Oct 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantKeshav
DesignationMD
Name of Company (Applicant Name should not be given here)TOKAI SAHAKARI SAKHAR KARKHANA LTD
AddressVillage: Kurunda, Tq. Basmath