APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Integrated Sugar Industry (Sugar 5000 TCD, Co-generation 29.5 MW, Grain based distillery 45 KLPD & Molasses/sugarcane juice/ Sugar Beet based distillery 60 KLPD)
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/82830/2018
Project Cost 30586 lacs
2.
S. No. in the schedule5(g) Distilleries
5(j) Sugar Industry
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Sugar 5000 TCD, Co-generation 29.5 MW, Grain based distillery 45 KLPD & Molasses/sugarcane juice/ Sugar Beet based distillery 60 KLPD) ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 3500 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage Pande, Tal. Karmala, Dist. Solapur, Maharashtra.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.235,238, 247, 248, 252, 254, 256
Town / VillagePande
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraSolapurKarmala
10.
Nearest railway station along with distance in kms Jeur Railway station, 17.5 km
Nearest airport along with distance in kms Baramati Airport, 70 km km
11. Nearest Town/City/District Headquarters along with distance in kms Karmala , 2.0 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Pande
13. Name of the Applicant vikramsinh
14. Registered Address At post Nimgaon, Tal. Madha, Dist. Solapur,
15.
Address for correspondance:
Name of the Company VITTHAL REFINED SUGARS LTD.
Name of the Applicant vikramsinh
Designation (Owner/ Partner/ CEO) Chairman
Pin code 413210
E-mail vrslsugar555@gmail.com
Telephone No. 217-00000000
Fax No. 217-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The barren plot near the sugar mill will be developed for distillery. The land is generally flat & does not come under flood zone. It does not have any human settlement. Said plot of land will be reformed / developed from its existing land use.
1.2 Clearance of existing land, vegetation and buildings? No Site preparation activities will be involved. However, land is vacant; there is no any residential settlement or vegetation on the plot.
1.3 Creation of new land uses? No Already under industrial land use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Preconstruction investigation of Hydro geological features will be conducted.
1.5 Construction works? Yes The civil works for the construction & development of the proposed project include earthworks; construction of factory sheds/ godowns; utilities; internal roads and storage tanks etc.
1.6 Demolition works? No No demolition require
1.7 Temporary sites used for construction works or housing of construction workers? No Local workers will be used for the construction activity and some temporary accommodation for a few outstation workers will be made within the project site.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Structures like distillation unit, fermentation unit, stack, boiler house etc. will be above the ground. However, excavations will be involved for foundations.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes The major unit operations for Sugar manufacturing are Extraction of Juice, clarification, evaporation, crystallization, and centrifugation. For Distillery: Continuous fermentation/Fed batch method to ferment molasses into alcohol, which is distilled in a multistage distillation/pressure vacuum column, system The major units for Grain based distillery are Grain Handling and Milling Section, Slurry Preparation and Liquefaction, Yeast Propagation and Fermentation, Multi pressure Distillation.
1.14 Facilities for storage of goods or materials? Yes During construction, temporary storage sheds will be provided. During operation, raw materials and finished products will be stored in a well-designated storage area within the project boundary Storage of molasses and alcohol as per norms of regulatory authority.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sugar unit: Primary clarifier & two stages ASP (Activated Sludge Process) treated to irrigation standards. Distillery units: Spent wash concentration in evaporator and then mixed with Bagasse/husk and utilization as fuel in boiler.
1.16 Facilities for long term housing of operational workers? Yes Local candidates will be employed. Therefore, existing colony could easily accommodate the minor increase.
1.17 New road, rail or sea traffic during construction or operation? No The site is well connected by road.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Surface water from Mangi Medium project permission of the same is available from Maharashtra Krushna Khore Vikas Mahamandal
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No change in water bodies or land surface due to this project.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The plant location has proper road linkages. Sate high way SH 67 and SH 141 are adjacent to project location. This will be used for transportation of materials, equipment’s and personnel during construction and operation phases.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning works are required to be carried out.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Factory will require about 460 people for operation of proposed integrated project.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable.
1.31 Any other actions? No No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Undeveloped land is in the possession
2.2 Water (expected source & competing users) unit: KLD Yes Medium dam water will be the water source. For the plant operation, fresh water to the tune of 1812.44 CMD will be needed. Necessary permissions from the concerned authority have obtained.
2.3 Minerals (MT) No No mineral will be needed in the manufacturing process
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Cement, metal and sand will be used during construction and operation as per requirement from local markets.
2.5 Forests and timber (source – MT) No No forest products and timber will be used for construction work as well as during operational work
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total power required of proposed project during operation phase is 8.5 MW and would be generated through boiler 150 TPH. Bagasse Requirement (TPH): 57.8 Spent wash – 175 TPD Indian coal – 138 TPD
2.7 Any other natural resources (use appropriate standard units) No No use of other natural resource
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No There will be no use of any hazardous material.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No NA
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project will open direct and indirect job opportunities in the neighborhood, which is likely to improve the living condition of the concerned people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No NA
3.5 Any other causes No There is no other cause in case of this project, which could be harmful to human health or the environment.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No NA
4.2 Municipal waste (domestic and or commercial wastes) Yes During Construction phase Construction debris will be used for construction site itself and therefore there will not be any solid waste problem from generation of construction-excavated earth materials. During Operation Phase Ash will be generated from plant process. Bottom& fly ash will be sold out to bricks manufactures in the nearby vicinity.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil/Spent oil:Collection, storage, transportation, sell to authorized recycler
4.4 Other industrial process wastes No No any
4.5 Surplus product No There will be no surplus product.
4.6 Sewage sludge or other sludge from effluent treatment No There will be no generation of sewage sludge.
4.7 Construction or demolition wastes Yes Construction waste like soil, brickbats, etc. will be utilized in leveling of land and construction of roads. No demolition wastes will be generated. Mostly fabrication work will be done
4.8 Redundant machinery or equipment No There will not be any redundant machinery or equipment.
4.9 Contaminated soils or other materials No No contaminated soils or other materials are involved.
4.10 Agricultural wastes No No agricultural waste will be generated.
4.11 Other solid wastes No There would be no other solid waste
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Gaseous emission from fuel burning, which consists of common pollutants like those that SO2, NOx, PM10 and PM2.5 would be discharged into atmosphere through stacks of suitable height. The D.G. sets will also have adequate stack height. The emissions will be limited through Electro Static Precipitator (ESP) having 99.98% efficiency.
5.2 Emissions from production processes No No major emissions envisaged CO2 will be generated during fermentation process. In coal handling facilities the main pollutant would be PM10 and PM2.5, some SO2 and NOx emission are expected due to movement of automobiles
5.3 Emissions from materials handling including storage or transport Yes The emission will be there due to the transportation activity and vehicular movements. All type raw materials & products will be received, stored and transported in closed containers; hence, release of pollutants to the air will be negligible. Particulate emission will be envisaged from ash handling system. Water sprinkling will be frequently carried out in ash handling area.
5.4 Emissions from construction activities including plant and equipment Yes Particulate emission in the form of dust due to vehicular traffic will be envisaged during construction phase. It will be controlled by regular water sprinkling in dust born area and within plant premises.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The emissions are negligible which will be only due to transportation activities. The construction activities will also involve negligible emissions, as most of the work will be of fabrication and erection of structures only and proper mitigation measures would be taken to reduce it further.
5.6 Emissions from incineration of waste Yes Emissions from incineration boilers are anticipated and main pollutant would be PM10 and PM2.5, some SO2 and NOx emission. However Electrostatic precipitator (ESP) will be installed as air pollution control equipment.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable as there will be no burning of waste in open air
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Due to operation of machinery, the noise Level near the machinery will be in the range of 75 to 80 dB (A). Proper noise abatement measures will be taken and persons working close to machine and machine operators will be provided with personal protective equipment viz. Earplugs / Ear muffs/defenders etc. for further protection. Vibrations due to any operation are ruled out. D.G sets are covered with acoustic to control noise level within permissible limit.
6.2 From industrial or similar processes Yes The sources of noise generation in the proposed project will be TG, boiler, and compressors etc. Ambient noise levels will be accordance with MoEF notification dated 14-02-2000, i.e. noise levels will be < 75 dB (A) during daytime and < 70 dB (A) during nighttime.
6.3 From construction or demolition Yes Construction equipment will cause some noise. Earplugs will be provided to construction workers who work near the noise generating equipment. Construction activity will be carried out in day time only.
6.4 From blasting or piling No There is no piling or blasting involved.
6.5 From construction or operational traffic Yes About 65 – 70 dB(A) There will be momentary increase in the noise level due to traffic during construction phase, as roads will bring lot of construction material. Similarly, operation phase will also add to some noise generation from loading/ unloading operation and from transportation of finished goods. However, to control noise generation within the prescribed standard, all the vehicles carrying goods will be checked for fitness and certification from RTO.
6.6 From lighting or cooling systems No Adequate control and mitigation measures will be initiated to avoid the release or generation of noise, vibration, or emission of light and heat.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No any hazardous substances required for process or likely to be generated through the process.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no discharge of any effluent outside the plant boundary. Treated effluent will be used in non-critical purposes within the plant. Zero Liquid Discharge (ZLD) system shall be adopted. The treated effluent will be used for green belt development.
7.3 By deposition of pollutants emitted to air into the land or into water Yes ESP will be installed to boiler. Unloading areas will be provided with water sprinklers to prevent the fugitive dust. All conveyors will be completely covered with GI sheets. Coal in coal yard and ash will be stored in silos under shed. Proper care will be taken to reduce dust emission, wherever possible.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No During process of manufacturing, storage, handling or transportation, no emission will take place, as the manufacturing process is a closed process. The emission of pollutants into the air will dispersed the pollutants due to wind. Hence, there is no possibility of pollutants getting built-up. To avoid such risk, regular ambient as well as workplace monitoring will be performed periodically to assess the concentration of individual pollutants to initiate required control measures if any.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risk is involved due to fire, spillages, and explosion. Proper firefighting will be designed. Codes and standards Of National Fire Protection Association (NFPA) will be followed as applicable. Moreover, risk analysis will be carried out and mitigation measure will be implemented.
8.2 From any other causes Yes There is a risk of accident during construction and operation. However, proper safety measures will be taken.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No As per IS 1893 and IS: 13920, seismic forces will be considered during construction of proposed structures/ buildings. To mitigate the effect of natural disaster like floods, earthquakes and cloudburst, appropriate disaster management plan will be developed and implemented to minimize the effects on environment and human health.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No All activity of the proposed project will be mainly using raw material and infrastructure of existing sugar factory. The infrastructure outside the sugar factory is adequate to accommodate the requirements of the new unit.
9.2 Lead to after-use of the site, which could have an impact on the environment No No any
9.3 Set a precedent for later developments Yes Area is relatively under developed. The project will play an important role in the overall development of the area. Possibility of developing supporting industrial activities in surrounding areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No No impact is anticipated.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No any
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Sina river, Mangi lake,5.0 km and 7.5 Km rec.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No No any
4 Inland, coastal, marine or underground waters No No any
5 State, National boundaries No No any
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No any
7 Defence installations No No any
8 Densely populated or built-up area Yes Karmala at 2.0 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No No any
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No No any
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No any
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No any
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
Public hearing minutes
Earlier approved ToR
Plant Layout
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 17 Nov 2018
2.NAFollowing information may be provided: (1) Availability of proposed land with the PP and permission for its industrial use. (2) Justification for applying afresh without executing the existing ToR 18 Oct 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of Applicantvikramsinh
DesignationChairman
Name of Company (Applicant Name should not be given here)VITTHAL REFINED SUGARS LTD.
AddressAt post Nimgaon, Tal. Madha, Dist. Solapur,