APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Integrated Project consisting of PVC Plant, PMB Plant, Gas Storage Terminal, LPG Bottling Plant, Gas Based Captive Power Plant, Sea Water Desalination Plant (RO process) for captive consumption by Veritas Polychem Pvt Ltd | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND2/80916/2018 | Project Cost | 132707 lacs | |
| 2. | |
S. No. in the schedule | 5(e) Petrochemical based processing (processes other than cracking &
| Project Sector | Industrial Projects - 2 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | PVC Plant: - 150,000 TPA, PMB Plant: - 360,000 TPA, Gas Storage: - 40,000 CBM, Power Plant: - 18 MW, SWRO: - 2000 KLD, LPG Bottling Plant: - approx. 2.0 Million composite Cylinders of various sizes per Month ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 0 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Dighi Port Area. Village Dighi, Taluka Shriwardhan , Dist. Raigad, Maharashtra, 402402 | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Dighi Port Area | Town / Village | Dighi | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Raigad | Shrivardhan | | 10. | |
Nearest railway station along with distance in kms | Roha railway Station, 40 km | Nearest airport along with distance in kms | Chhatrapati Shivaji International Airport, 200 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Shrivardhan , 30 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Shrivardhan Municipal Council
Ravindra Narayan Raut Administrative building
Shivaji Road Shriwardhan
District :- Raigad
State :- Maharashtra
Pincode :- 402110
Tel :- 02147222378 | | 13. | Name of the Applicant | praveen | | 14. | Registered Address | 701, Embassy Centre, Nariman Point, Mumbai | | 15. | |
Address for correspondance: | Name of the Company | VERITAS POLYCHEM PVT LTD | Name of the Applicant | praveen | Designation (Owner/ Partner/ CEO) | headprojects | Pin code | 400001 | E-mail | praveen.b@groupeveritas.com | Telephone No. | 022-22824444 | Fax No. | 022-22824440 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | Yes | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The proposed project will be developed and commissioned within Dighi Port limits. | 1.2 | Clearance of existing land, vegetation and buildings? | No | The project will be developed on the vacant land within the Dighi Port limits. | 1.3 | Creation of new land uses? | No | Dighi Port land has approval of port related /Industrial use | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | The detailed Geotechnical Investigation is being carried out. | 1.5 | Construction works? | No | Construction for setting up of Plants and Infrastructure will be carried out after NOC / EC from MOEFCC is granted. | 1.6 | Demolition works? | No | Not Applicable | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not Applicable | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Construction for setting up of Plants and Infrastructure will be carried out after NOC / EC from MOEFCC is granted. | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | Yes | There would be steel
structures for Intake and Outfall of SWRO Desalination Plant will be constructed. | 1.13 | Production and manufacturing processes? | Yes | Attached as Annexure . | 1.14 | Facilities for storage of goods or materials? | Yes | During Construction Phase
sand, cement, aggregates
and steel will be stored at
site.
Operation Phase the proposal includes the storage of Liquefied gases, Bitumen and Chemicals at the site. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Construction Phase: For disposing sewage to Septic Tank. Excavated material will be reused in backfilling. Other recyclable waste’s will be
sold to recycler. Other inert wastes to local facility. Operation Phase: 250kgs per day of Municipal Solid waste to authorized 5
facility. Sewage (28 CMD) STP (30CMD), treated sewage to Gardening. Sludge as manure. Effluent (80 CMD) to ETP. Treated effluent to Gardening and Flushing | 1.16 | Facilities for long term housing of operational workers? | No | Not Applicable | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Not Applicable | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not Applicable | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | There will be transportation of construction material and personnel in the project site during construction phase. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | During construction phase contractor personnel will be deployed at site from nearby places. Influx of these people will be temporary in nature.
Operation Phase:- The total employment of the whole 6 project will be approx. 267 out of which factory work force /labour will be 180 Nos and
administration staff will be 87 Nos. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Not Applicable | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Construction Phase Total Water Requirement
during construction phase will be 23 CMD.
Domestic use of workers = 8 CMD. Construction Work = 15 CMD. Operation Phase Total Water requirement: 3274 CMD
Source : SWRO | 2.3 | Minerals (MT) | No | Not Applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | M-Sand- 2,57,000 MT
Aggregate: 32,000 MT
River Sand: 17,000 MT
Soil / Murum : 1,45,000 MT | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity: - 18 MW, (Produced from Captive Power Plant.)
LNG (Fuel) for Captive Power Plant: 0.168MT/MWH LNG (Fuel) for Boiler: - 0.018
7 MT/Hr. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Liquefied gases (Under Pressure) will be stored /
Filled / Used for Process. However, the storage and handling of hazardous liquefied gases will be as per MSIHC Norms / Rules | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not Applicable | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Construction Period: Excavated Earth will be reused for backfilling. Operation Period: Solid waste / Bio waste shall be disposed off through
authorized agencies. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | Not Applicable | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The sludge will be treated and will be used as organic manure for gardening and agriculture, etc. | 4.7 | Construction or demolition wastes | Yes | There shall be no demolition, however the waste generated during construction shall be used for back filling and the waste which cannot be used
shall be disposed off through authorized agencies. | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | Yes | Shall be disposed off through authorized agencies. | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | There will be stack emissions from combustion of fuel oil in machineries such as Boiler, DG etc. The emission will be controlled by provision of Air
Pollution Control Equipment’s such as Scrubber, Dust Collectors, Bag Filters etc. | 5.2 | Emissions from production processes | Yes | There will be emissions from production activity. The adequate stacks/ vents will be provided. The emission will be controlled by provision of Air
Pollution Control Equipment’s such as Wet Scrubber, Dust Collectors, Bag Filters etc. | 5.3 | Emissions from materials handling including storage or transport | Yes | There will be generation of fugitive emission from storage and handling of materials. | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be emission of dust and other gaseous material during construction activities due to operation of construction material, construction vehicle, handling of materials. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | There will be emission of dust and other gaseous material during construction activities due to operation of construction material, construction vehicle, handling of materials. | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | Not applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | DG / Gas Generator sets shall have acoustic enclosures in order to keep the noise within
limits. There will not be any vibrations on these engines. | 6.2 | From industrial or similar processes | Yes | There will be noise generation due to operation of plant machinery, handling of materials, vehicle movement etc. during operation phase which will be addressed by:
1. Providing noise barriers in the form of Green
Belt around the premises.
2. Proper maintenance of plant and machineries.
3. Proper equipment’s for loading and unloading
of transport vehicles. | 6.3 | From construction or demolition | No | There will be no demolition during the entire project, however during construction noise will be generated due to various equipment’s running
at site. | 6.4 | From blasting or piling | Yes | There will be no blasting, however noise and generation of vibration will be through Piling only during construction stage. | 6.5 | From construction or operational traffic | Yes | Construction Phase: Cranes, Dumpers, Excavators, Dozers, Trucks and Trailers shall be used. Operation Phase: - Trucks, Tankers and trailers. | 6.6 | From lighting or cooling systems | No | There will not be any noise generation for lighting, however noise occurring due to cooling systems shall be kept to minimum levels by
having proper enclosures. | 6.7 | From any other sources | No | Not applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Precautions will be taken during transportation,
loading/unloading etc. MSDS will be followed. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Wastewater generated during operation phase will be treated in ETP and the treated water will be reused for Gardening, Flushing etc. Under no circumstances treated or untreated liquid
waste will be poured with marine water. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Air Pollution Control equipment will be provided at
source to prevent emissions in air. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Disaster and risk management plan will be
prepared and implemented. | 8.2 | From any other causes | No | Not applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The project will be designed by taking into consideration these factors as per relevant
codes and standards. The proposed project site has not reported any kind of natural disasters like earthquake, floods, Tsunami etc. However,
a proper DMP will be prepared and executed in
case of any such eventualities. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The project will have positive impact of supply industries, due to procurement of raw
materials etc. required for production. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | No | Not Applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Phansad wildlife sanctuary located at a distance of 11 km towards the North East. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Proposed project is located within Dighi Port situated near Rajapuri Creek. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | Yes | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Murud Jangira Fort: 4 km East across the creek | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | Roha: 40 km | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Dr. A.R. Undre English High School & Junior College, Diveagar: 13 km South. • Sir
S. A. High School, Murud: 4.60 North East | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The project will be designed by taking into consideration these factors as per relevant
codes and standards. The proposed project site has not reported any kind of natural disasters like earthquake, floods, Tsunami etc. However,
a proper DMP will be prepared and executed in
case of any such eventualities. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 26 Oct 2018 | 2. | NA | As per the information available, the proposed activities are permissible in the CRZ area, if required, you may come for a discussion in the Ministry, with documents. | 17 Oct 2018 | 3. | NA | The correction have been made as per the instruction received | 04 Oct 2018 | 4. | NA | Please inform the following:
(1) Whether Ministry/EAC has already taken a decision on a same project in the same location.
(2) Whether the proposed activities are permissible in the CRZ area | 04 Oct 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | praveen | Designation | headprojects | Name of Company (Applicant Name should not be given here) | VERITAS POLYCHEM PVT LTD | Address | 701, Embassy Centre, Nariman Point, Mumbai |
|
|