APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s West Coast Refinery and Petrochemicals project at Babulwadi, Rajapur Tehsil, Ratnagiri district, Maharashtra
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND2/65093/2017
Project Cost 270000000 lacs
2.
S. No. in the schedule4(a) Petroleum refining industry
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 60 MMTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectBabulwadi
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.xx
Town / VillageBabulwadi
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraRatnagiriRajapur
10.
Nearest railway station along with distance in kms Rajapur Road, 20 km
Nearest airport along with distance in kms Dabolim Airport, Goa, 180 km
11. Nearest Town/City/District Headquarters along with distance in kms Rajapur , 20 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Kumbhavade Panchayat, Rajapur taluka
13. Name of the Applicant Sanjeev
14. Registered Address Scope Complex, Core-2 Lodhi Road
15.
Address for correspondance:
Name of the Company INDIAN OIL COPERATION LIMITED
Name of the Applicant Sanjeev
Designation (Owner/ Partner/ CEO) CGM
Pin code 110003
E-mail vermas@indianoil.in
Telephone No. 011-71726273
Fax No. 011-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?Yes
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Main processing facilities at Babulwadi including utilities, COT, Offsite, township.
1.2 Clearance of existing land, vegetation and buildings? No Not Applicable
1.3 Creation of new land uses? Yes New building and processing facilities will be made.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing activity shall be taken up.
1.5 Construction works? Yes Development of refinery cum petrochemical complex, COT and township shall be carried out.
1.6 Demolition works? Yes Site leveling activities shall be taken up.
1.7 Temporary sites used for construction works or housing of construction workers? Yes Site development activities shall be taken up.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Site development activities shall be taken up.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? Yes Site development activities shall be taken up.
1.11 Dredging? Yes Development of COT facilities shall be taken up.
1.12 Offshore structures? Yes Development of COT facilities shall be taken up.
1.13 Production and manufacturing processes? Yes Crude processing, production of petroleum products & petrochemicals.
1.14 Facilities for storage of goods or materials? Yes Crude & product storage facility and warehouses for Petrochemical products.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Effluent treatment facility would be installed along with refinery for zero discharge effluent to outside.
1.16 Facilities for long term housing of operational workers? Yes Township shall be built.
1.17 New road, rail or sea traffic during construction or operation? Yes NH and SH exists at nearby area. However connecting road shall be made.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes Connectivity from NH & SH to the site.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? Yes SH 113 will be re-routed.
1.20 New or diverted transmission lines or pipelines? Yes The New pipelines will be routed through Solapur for dispatching of products.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No changes to the hydrology of watercourses or aquifers.
1.22 Stream crossings? Yes Pipeline from COT to refinery will cross the creek nearby.
1.23 Abstraction or transfers of water from ground or surface waters? Yes In addition to desalination, Koyana dam excess water will be utilized for the project.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes For Construction: Only materials/equipment will be transported from vendors’ site to West coast project area. Contract workers will come from nearby area by local movement. For operations: Personnel shall be coming from the proposed refinery township
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Commissioning people will be deployed in nearby area on temporary basis. Permanent employees shall be accommodated in proposed township and nearby area.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Mostly Barren & Undulating The total area is Rocky from the surface itself.
2.2 Water (expected source & competing users) unit: KLD Yes In addition to desalination, Koyana dam excess water will be utilized for the project. Estimated raw water requirement for the Refinery-Cum-Petrochemical Complex is 180 MGD.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Sand, stone aggregates will be sourced from authorized/govt. approved vendors.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 1500 MW
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes The list of chemicals to be used in process and utility area is as below: • Hydrogen sulphide • Ammonia • Chlorine • Caustic soda • MDEA • Phosphate solution • Antifoam agent • Biocide • Corrosion inhibitor • Other dosing chemicals • Benzene • Toluene • Acetic acid • Phenol • Acryonitrile
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes There will be significant positive development towards economic front of the local people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) No Not Applicable
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Spent catalyst will be generated every 4-5 years. All statutory rules/guidelines of MoEFCC/CPCB will be complied prior to recycle, reclamation or sale of spent catalyst.
4.4 Other industrial process wastes Yes Certain polymer and scum shall be generated.
4.5 Surplus product Yes Surplus product shall be stored in designed warehouses.
4.6 Sewage sludge or other sludge from effluent treatment Yes Effluent shall be treated in ETP.
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No Not Applicable
5.2 Emissions from production processes Yes Estimated SOx emission =150 TPD.
5.3 Emissions from materials handling including storage or transport Yes Marginal emission due to vehicular movement for transportation and storage, coal/Petcoke handling.
5.4 Emissions from construction activities including plant and equipment No Not Applicable
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Only dust could be there, no odour. Sewage generated during construction /operation will be collected and disposed.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No waste will be burnt. Construction debris will be kept in earmarked area, while metal scraps will be sold.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.2 From industrial or similar processes Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.3 From construction or demolition Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.4 From blasting or piling Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.5 From construction or operational traffic Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.6 From lighting or cooling systems Yes Noise from equipment will be within statutory limits, applicable for industrial area.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Entire plant area will be paved and all contaminated discharges will be routed to Effluent treatment. No discharge to outside. Solid waste generated will be disposed through authorized agency.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes The treated effluent will be totally Recycled.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Flare system has been envisaged in this project.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No New Occupational Health and Safety Management meeting international management System standard (OHSAS-18001) will be put in place to control/avoid any such eventualities backed by strong Fire & Safety department. New system comprising of fire water storage, fire water pumps, service water tanks and distribution piping network has been considered.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The site falls under seismic zone IV.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes There will be significant positive development in economic front of the local area.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Kumbhavade and Dongar are Ecologically Sensitive villages listed in Kasturirangan Report.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Vaghotan river is adjacent to COT facilities.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters Yes Vaghotan river is adjacent to COT facilities.
5 State, National boundaries Yes Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area No Not Applicable
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Not Applicable
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The site falls under seismic zone IV.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
Additional Attachments, if any
Attached File
ADS Letter
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of Additional details sought by Member Secretary is attached herewith. 06 Jul 2017
2.NAEAC after detailed deliberation has deferred the proposal for want of following information/documents: i. PP shall submit a letter from the concerned authority that the project does not fall in the ESA and the proposed activities are permitted in the area. ii. Details of structure/pipeline connecting Plot 1 & Plot 2. iii. Land ownership certificate from the concerned authority/letter from MSIDC. iv. PP shall submit details of site selection analysis and also the details of studies conducted for alternate site analysis. v. Video coverage of the area to understand the real habitat. vi. Construction of jetties and ports shall be submitted to the concerned EAC for appraisal. PP shall also obtain the recommendation of SCZMA for CRZ clearance. 04 Jul 2017
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSanjeev
DesignationCGM
Name of Company (Applicant Name should not be given here)INDIAN OIL COPERATION LIMITED
AddressScope Complex, Core-2 Lodhi Road