FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Manufacturing of Manganese oxide and Ferro Alloys (By Thermite Process) of M/s. Shree Pawan Metal & Minerals
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND/89204/2018
Project Cost 216 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Sr.No Product Production 1 Manganese Oxide powder 3600 M.T. per annum 2. Ferro Manganese M.C./L.C OR 600 M.T. per annum 3. Ferro Chrome L.C. OR 600 M.T. per annum 4. Ferro Titanium OR 600 M.T. per annum 5. Ferro Vanadium OR 600 M.T. per annum 6. Ferro Molybdenum 120 M.T. per annum 7. Aluminum Ingots 120 M.T. per annum ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/MH/IND/89203/1900
MoEFCC file number(Previous EC)------
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 0.54 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
c) Notified Eco-sensitive areas
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectMIDC Deori
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot No. C-3
Town / VillageMIDC Deori
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraGondiaDeori
10.
Nearest railway station along with distance in kms Saundad, 29 km
Nearest airport along with distance in kms Birsi Airport Gondia, 56 km
11. Nearest Town/City/District Headquarters along with distance in kms Gondia , 46 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) MIDC
13. Name of the Applicant Pandurang
14. Registered Address Plot No. C-3 MIDC Industrial Area, Deori, Gondia, Maharashtra
15.
Address for correspondance:
Name of the Company SHREE PAWAN METAL & MINERALS
Name of the Applicant Pandurang
Designation (Owner/ Partner/ CEO) Owner
Pin code 441901
E-mail pawanmetals2018@gmail.com
Telephone No. 0712-2293225
Fax No. 0712-2293225
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The activity is proposed in existing premises of MnO2 unit which is already in industrial use. Therefore, no change in the land use envisaged.
1.2 Clearance of existing land, vegetation and buildings? No There will not be any clearance of vegetation and building as it is in industrial use.
1.3 Creation of new land uses? No No the land is already in Industrial use & it will remain same after the proposed project also.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing shall be carried out for finalization of construction drawing.
1.5 Construction works? Yes Office, Labour Quarters & washrooms, Testing laboratory, stores etc are already constructed in existing plant. Furnaces will be constructed for the proposed project.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Not Applicable
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Furnace with wet scrubbers as air pollution control system followed by 30 m. stack. Excavation and earthworks shall be done for structures for erection of industrial installations as mentioned above
1.9 Underground works including mining or tunnelling? Yes Tunneling and mining works are not envisaged. Underground/below surface working pertaining to excavation/earthworks/ internal drainage/rainwater harvesting pits
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes The detailed manufacturing process is given in the Pre-Feasibility Report.
1.14 Facilities for storage of goods or materials? Yes During the operational phase, raw material will be stored in the raw material storage sheds.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Waste Water: The wastewater generated in zigging process will be treated in settling tank and reused. Solid waste: Slag: 500 TPA Ash : 45 TPA The ash generated will be sold to brick manufacturers. Slag will be sold to brick and construction industry.
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? No Existing road network are adequate to handle the traffic during operation of plant.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new road/rail/ air transport infrastructure is proposed.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing transport routes is envisaged.
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No No stream crossing is involved
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water Requirement : 12 KLD Source : MIDC along with execution of tube well.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No changes in water bodies, drainage and land surface are anticipated
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The raw material is being transported in tarpaulin covered trucks by road and stored in raw material storage yard. The transport of personnel during operation will be by public/private mode. The existing road network will be utilized for the transportation of personal in operation phase
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes New job opportunity due to proposed project will create additional employment.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed project is in the existing premises of the plant which is already in industrial use. Hence there is no change in land use.
2.2 Water (expected source & competing users) unit: KLD Yes Water Requirement : 12 KLD Source : MIDC along with execution of tube well.
2.3 Minerals (MT) Yes Raw Material Required (Proposed) for Manganese Oxide Production- Sr.No Product Raw Material Quantity 1 Manganese Ore 4500 M.T. per annum 2. Steam coal/Hard coke 450 M.T. per annum Raw Material Required (Proposed) for Ferro Alloys Production (By Thermite process)- Sr.No Product Raw Material Quantity 1. Ferro Manganese M.C./L.C For 600 M.T. per annum Production Manganese powder Silico Manganese powder Aluminum powder Lime/Fluorspar 660 M.T. per annum
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Will be finalized after design and drawing
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity Total including proposed project:120KW Source : State Electricity Board
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The raw materials / substances are not hazardous to human health or environment.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Increase in employment potential for locals and improve the living conditions.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Only domestic waste shall be generated which will be treated in Packaged type STP.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No No hazardous waste generated from the proposed project.
4.4 Other industrial process wastes Yes The ash generated will be sold to brick manufacturers. Slag will be sold to brick and construction industry.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment No Not Applicable
4.7 Construction or demolition wastes No Will be used for making internal roads, fencing etc.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Coal will be used in production of MnO for roasting of MnO2. Emissions from the furnace will be controlled by wet scrubbers followed by 30 m stack. There will be small amount of exhaust from the vehicles engage in transportation. All the vehicles are designed to comply Norms.
5.2 Emissions from production processes Yes During operation of furnaces for MnO, some emissions are envisaged. Proper care will be taken by installing wet scrubbers followed by Stack.
5.3 Emissions from materials handling including storage or transport Yes Dust emission will be envisage due to vehicles movement following measures will be adopted to control fugitive emission: • Installation of water sprinklers along the road side. • Water spraying will be done at raw material handling areas. • Internal roads will be concreted. • Development of good greenery.
5.4 Emissions from construction activities including plant and equipment Yes Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the plant premises.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Very Small Quantity of solid waste & Liquid waste are envisaged during construction period
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Earplugs will be provided to workers working in the noise prone areas. Ambient noise level will be <75dB (A) during daytime and <70dB (A) during nighttime.
6.2 From industrial or similar processes Yes Earplugs will be provided to workers working in the noise prone areas. Ambient noise level will be <75dB (A) during daytime and <70dB (A) during nighttime.
6.3 From construction or demolition Yes Construction equipment will cause some noise. Earplugs will be provided to construction workers who worked near the noise generating equipment.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Due to movement of heavy vehicles
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Good housekeeping practice will be maintained. This will eliminate any spillages. No hazardous material will be required.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Zero liquid discharge shall be maintained..
7.3 By deposition of pollutants emitted to air into the land or into water Yes Controlled air emissions due to source and fugitive is envisaged due to operation of plant. Deposition of pollutants depending upon dispersion and dilution factors of the local meteorological conditions. Though the deposition of pollutants is natural phenomenon, no risk of contamination is envisaged due to local dilution factors. Proper care will be taken by installing wet scrubbers followed by Stack to control source emission. Hence there will not be any major deposition of pollutants into air,
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No It may occur, proper arrangements for firefighting etc. exist.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not Applicable
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Additional Employment generation
9.2 Lead to after-use of the site, which could have an impact on the environment No Not anticipated.
9.3 Set a precedent for later developments No Not anticipated.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not anticipated.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes FOREST Reserved Forest Patch : 1.0 km (N) Reserved Forest Patch : 1.5 km (SSW) Reserved Forest Patch : 2.0 km (W) Reserved Forest Patch : 5.5 km (W) Reserved Forest Patch : 4.5 km (NW) Reserved Forest Patch : 5.0 km (N) Reserved Forest Patch : 3.5 km (SW) According to the Notification S.O. 612(E) dated 25th February 2016 Distance from Eco-Sensitive Zone around Nagzira Wildlife Sanctuary, New Nagzira Wildlife Sanctuary, Koka Wildlife Sanctuary, Navegaon Wildlife Sanctuary and Navegaon Na
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No Maharashtra Chattisgarh : 7.5 kms (E)
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes Deori: 0.5 Km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals Krishna Hospital : 0.8 km Government Hospital: 1.0 km
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantPandurang
DesignationOwner
Name of Company (Applicant Name should not be given here)SHREE PAWAN METAL & MINERALS
AddressPlot No. C-3 MIDC Industrial Area, Deori, Gondia, Maharashtra