APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Manufacturing unit of Vibhuti Alloys to manufacture Medium Carbon Ferro-Manganese & Low Carbon Ferro-Manganese 2400 TPA OR Ferro Molybdenum 80 TPA OR Ferro Vanadium 80 TPA OR Ferro Titanium 80 TPA By Thermite Process Manganese Oxide 2400 TPA | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/MH/IND/100767/2019 | Project Cost | 300 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Grinding of Manganese : 30000 TPA Grinding of Silico Manganese : 24000 TPA Grinding of Ferro Manganese : 24000 TPA Grinding of Coal : 2400 TPA ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/MH/IND/100764/1900 | MoEFCC file number(Previous EC) | MPCB/UAN No. 43657/1807000498 | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 43657 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | At Plot no.– B17/1 Butibori Industrial Area, Nagpur, Maharashtra | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | At Plot no.– B17/1 | Town / Village | Butibori MIDC, Nagpur, Maharashtra | State of the project | Maharashtra | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Maharashtra | Nagpur | Nagpur (Rural) | | 10. | |
Nearest railway station along with distance in kms | Butibori Railway station, 5 km | Nearest airport along with distance in kms | Dr. Babasaheb Ambedkar Airport, Nagpur, 20 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Nagpur city , 22 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Butibori Industrial Area, Nagpur, Maharashtra. | | 13. | Name of the Applicant | Abhishek | | 14. | Registered Address | Mr. Abhishek Rai
M/s. Vibhuti Alloys
10, East high court road, Ramdaspeth, Nagpur-10 | | 15. | |
Address for correspondance: | Name of the Company | VIBHUTI ALLOYS | Name of the Applicant | Abhishek | Designation (Owner/ Partner/ CEO) | Proprietor | Pin code | 441122 | E-mail | vibhutialloys2019@gmail.com | Telephone No. | 0712-2522724 | Fax No. | 0712-2543352 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Present use of land is Industrial. The Project will involve some changes/ alteration to existing shed and fabrication and installation of Plant & equipment for the production of Ferro Alloys. | 1.2 | Clearance of existing land, vegetation and buildings? | No | There will not be any clearance of vegetation and building. | 1.3 | Creation of new land uses? | No | No the land is already in Industrial area. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | The shed is already constructed. | 1.5 | Construction works? | Yes | Storage areas, rent room, admin office etc. | 1.6 | Demolition works? | No | No Demolition work is required for proposed new units. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No temporary sites will be constructed since nearby villagers will be employed in the construction of proposed units. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Furnace, Vessel, bag filter as air pollution control system of specified size followed by 30 m. stack.
Excavation and earthworks shall be done for structures for erection of industrial installations as mentioned above | 1.9 | Underground works including mining or tunnelling? | No | Tunneling and mining works are not envisaged.
Underground/below surface working pertaining to excavation/earthworks/ internal drainage/rainwater harvesting pits. | 1.10 | Reclamation works? | No | No reclamation works are envisaged in proposed project. | 1.11 | Dredging? | No | No dredging activity will be involved. | 1.12 | Offshore structures? | No | No offshore structures are envisaged in the proposed project. | 1.13 | Production and manufacturing processes? | Yes | The detailed manufacturing process for production of Manganese Oxide and Ferro Alloys is given in the Pre-Feasibility Report. | 1.14 | Facilities for storage of goods or materials? | Yes | Raw materials will be stored in covered shed. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Activity Description
Jigging : The wastewater generated will be from
Zigging process which will be treated in
settling tank and reused in the process.
Domestic waste Water: Shall be connected to
MIDC Sewage Line
Slag: Shall be reused for lining & Earth
Preparation of Reaction vessels. And will be
sold to Silico Manufacturers
Ash: Will be sold to brick manufacturers. | 1.16 | Facilities for long term housing of operational workers? | No | Not Applicable | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing road network are adequate to handle the traffic during operation of plant. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | No new road/rail/ air transport infrastructure is proposed. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No closure or diversion of existing transport routes is envisaged. | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No damming, culverting, realignments are envisaged. There will not be any changes to the hydrology of watercourses or aquifers due to the proposed project. | 1.22 | Stream crossings? | No | No stream crossing is involved | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No changes in the ground or surface water are anticipated. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | No changes in water bodies, drainage and land surface are anticipated | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | No | The raw material is being transported in tarpaulin covered trucks by road and stored in raw material storage yard.
The transport of personnel during operation will be by public/private mode.
The existing road network will be utilized for the transportation of personal in operation phase | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No such works are envisaged | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | No such works are envisaged | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | New job opportunity due to proposed new units will create additional employment. | 1.29 | Introduction of alien species? | No | No such activity is envisaged | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity. | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The proposed project is on an Industrial Plot. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Requirement : Max 5 KLD
Source: MIDC Butibori | 2.3 | Minerals (MT) | Yes | All quantity in TPA
Low / Med. Carbon Fe. Mn. :
Manganese Ore:2280
Aluminium Scrap :410
Lime Powder/ Flourspar:548
Silico Manganese:1416
Ferro Titanium:
Ilmenite:104
Aluminium Powder: 47
Lime Powder:1
Iron Ore :16
Ferro Molybdenum:
Moybdenum Concentrate :81
Aluminium Powder:9
Lime Powder:8
Mill Scale :45
Ferro Silicon:30
Ferro Vanadium:
Vanadium Pentoxide (flakes): 77
Aluminium Shots :40
Flourspar:5
Iron Scrap:41
Manganese Oxide:
Manganese Ore:3000
Coal:272 | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | MIDC has leased 1000 sq mt of land with 500 sq mt constructed shed | 2.5 | Forests and timber (source – MT) | No | Nil | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power requirement : 47 KW
Source : State Electricity Board. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | The raw materials / substances are not hazardous to human health or environment. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Shall increase the employment potential for locals and affect the living conditions for betterment. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Only domestic waste shall be generated and shall be connected to MIDC sewage line. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used machine oil shall be generated during maintenance and overhauling and shall be stored in environment friendly manner and sell to registered vendors only. | 4.4 | Other industrial process wastes | Yes | Slag generated from Ferro Alloys shall be reused for lining & Earth Preparation of Reaction vessels & will be sold to Silico Manufacturers | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | No | Not Applicable | 4.7 | Construction or demolition wastes | No | Not Applicable | 4.8 | Redundant machinery or equipment | No | Not Applicable | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | No | Not Applicable | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | During operation coal will be burned The reaction vessel shall be connected to Dust Extraction System and Bag Filters. | 5.2 | Emissions from production processes | Yes | During operation the reaction vessel shall be connected to Dust Extraction System and Bag Filters. | 5.3 | Emissions from materials handling including storage or transport | Yes | Emission will be there in raw material handling, and internal transportation. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the plant premises. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Odor will not be generated. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | Yes | Wherever possibility of dust generation is mere, shall be connected to a de-dusting system | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Operation of equipment and vehicles will generate noise. | 6.2 | From industrial or similar processes | Yes | Mainly at the time of charging of raw material will generate additional noise. The effect of this noise will be within working premises only. | 6.3 | From construction or demolition | Yes | Due to operation of heavy machinery during construction. | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | Due to movement of heavy vehicles. | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Spillage of used oil during Handling while loading and unloading may occur. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Zero liquid discharge shall be maintained. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Proper care will be taken by installing Bag filters followed by Stack to control source emission. Hence there will not be any major deposition of pollutants into air, land and water. | 7.4 | From any other sources | No | Not Applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not Applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | It may occur, proper arrangements for firefighting etc. exist for proposed project. | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Not Anticipated | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Additional Employment generation | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not anticipated. | 9.3 | Set a precedent for later developments | No | Not anticipated. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not anticipated. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Reserve forest :
Bid Sukli R.F. : 1 Kms : (W)
Dongargaon R.F. : 5 Kms : (SE)
Junapani R.F. : 7 Kms : (S)
Water Bodies
Vena river : 3 kms : (E)
Krishna nala : 3kms : (SW)
Kanholi Canal : 6.0 km : (SW)
Vadgaon lake : 9.6 kms : (SE) | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | 7 | Defence installations | No | No such area comes under the vicinity of the project. | 8 | Densely populated or built-up area | Yes | Butibori, Borkhedi, Kinhi, Tembhri etc. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospital, schools, places of worship, community facilities are present. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Abhishek | Designation | Proprietor | Name of Company (Applicant Name should not be given here) | VIBHUTI ALLOYS | Address | Mr. Abhishek Rai
M/s. Vibhuti Alloys
10, East high court road, Ramdaspeth, Nagpur-10 |
| |
|