S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Manufacturing unit of Vibhuti Alloys to manufacture Medium Carbon Ferro-Manganese & Low Carbon Ferro-Manganese 2400 TPA OR Ferro Molybdenum 80 TPA OR Ferro Vanadium 80 TPA OR Ferro Titanium 80 TPA By Thermite Process Manganese Oxide 2400 TPA
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/MH/IND/100767/2019
Project Cost 300 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Grinding of Manganese : 30000 TPA Grinding of Silico Manganese : 24000 TPA Grinding of Ferro Manganese : 24000 TPA Grinding of Coal : 2400 TPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/MH/IND/100764/1900
MoEFCC file number(Previous EC)MPCB/UAN No. 43657/1807000498
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 43657 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectAt Plot no.– B17/1 Butibori Industrial Area, Nagpur, Maharashtra
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.At Plot no.– B17/1
Town / VillageButibori MIDC, Nagpur, Maharashtra
State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraNagpurNagpur (Rural)
10.
Nearest railway station along with distance in kms Butibori Railway station, 5 km
Nearest airport along with distance in kms Dr. Babasaheb Ambedkar Airport, Nagpur, 20 km
11. Nearest Town/City/District Headquarters along with distance in kms Nagpur city , 22 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Butibori Industrial Area, Nagpur, Maharashtra.
13. Name of the Applicant Abhishek
14. Registered Address Mr. Abhishek Rai M/s. Vibhuti Alloys 10, East high court road, Ramdaspeth, Nagpur-10
15.
Address for correspondance:
Name of the Company VIBHUTI ALLOYS
Name of the Applicant Abhishek
Designation (Owner/ Partner/ CEO) Proprietor
Pin code 441122
E-mail vibhutialloys2019@gmail.com
Telephone No. 0712-2522724
Fax No. 0712-2543352
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Present use of land is Industrial. The Project will involve some changes/ alteration to existing shed and fabrication and installation of Plant & equipment for the production of Ferro Alloys.
1.2 Clearance of existing land, vegetation and buildings? No There will not be any clearance of vegetation and building.
1.3 Creation of new land uses? No No the land is already in Industrial area.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No The shed is already constructed.
1.5 Construction works? Yes Storage areas, rent room, admin office etc.
1.6 Demolition works? No No Demolition work is required for proposed new units.
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites will be constructed since nearby villagers will be employed in the construction of proposed units.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Furnace, Vessel, bag filter as air pollution control system of specified size followed by 30 m. stack. Excavation and earthworks shall be done for structures for erection of industrial installations as mentioned above
1.9 Underground works including mining or tunnelling? No Tunneling and mining works are not envisaged. Underground/below surface working pertaining to excavation/earthworks/ internal drainage/rainwater harvesting pits.
1.10 Reclamation works? No No reclamation works are envisaged in proposed project.
1.11 Dredging? No No dredging activity will be involved.
1.12 Offshore structures? No No offshore structures are envisaged in the proposed project.
1.13 Production and manufacturing processes? Yes The detailed manufacturing process for production of Manganese Oxide and Ferro Alloys is given in the Pre-Feasibility Report.
1.14 Facilities for storage of goods or materials? Yes Raw materials will be stored in covered shed.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Activity Description Jigging : The wastewater generated will be from Zigging process which will be treated in settling tank and reused in the process. Domestic waste Water: Shall be connected to MIDC Sewage Line Slag: Shall be reused for lining & Earth Preparation of Reaction vessels. And will be sold to Silico Manufacturers Ash: Will be sold to brick manufacturers.
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? No Existing road network are adequate to handle the traffic during operation of plant.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new road/rail/ air transport infrastructure is proposed.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing transport routes is envisaged.
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No damming, culverting, realignments are envisaged. There will not be any changes to the hydrology of watercourses or aquifers due to the proposed project.
1.22 Stream crossings? No No stream crossing is involved
1.23 Abstraction or transfers of water from ground or surface waters? No No changes in the ground or surface water are anticipated.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No changes in water bodies, drainage and land surface are anticipated
1.25 Transport of personnel or materials for construction, operation or decommissioning? No The raw material is being transported in tarpaulin covered trucks by road and stored in raw material storage yard. The transport of personnel during operation will be by public/private mode. The existing road network will be utilized for the transportation of personal in operation phase
1.26 Long-term dismantling or decommissioning or restoration works? No No such works are envisaged
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No such works are envisaged
1.28 Influx of people to an area in either temporarily or permanently? Yes New job opportunity due to proposed new units will create additional employment.
1.29 Introduction of alien species? No No such activity is envisaged
1.30 Loss of native species or genetic diversity? No No loss of native species or genetic diversity.
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed project is on an Industrial Plot.
2.2 Water (expected source & competing users) unit: KLD Yes Requirement : Max 5 KLD Source: MIDC Butibori
2.3 Minerals (MT) Yes All quantity in TPA Low / Med. Carbon Fe. Mn. : Manganese Ore:2280 Aluminium Scrap :410 Lime Powder/ Flourspar:548 Silico Manganese:1416 Ferro Titanium: Ilmenite:104 Aluminium Powder: 47 Lime Powder:1 Iron Ore :16 Ferro Molybdenum: Moybdenum Concentrate :81 Aluminium Powder:9 Lime Powder:8 Mill Scale :45 Ferro Silicon:30 Ferro Vanadium: Vanadium Pentoxide (flakes): 77 Aluminium Shots :40 Flourspar:5 Iron Scrap:41 Manganese Oxide: Manganese Ore:3000 Coal:272
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No MIDC has leased 1000 sq mt of land with 500 sq mt constructed shed
2.5 Forests and timber (source – MT) No Nil
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement : 47 KW Source : State Electricity Board.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No The raw materials / substances are not hazardous to human health or environment.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Shall increase the employment potential for locals and affect the living conditions for betterment.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Only domestic waste shall be generated and shall be connected to MIDC sewage line.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used machine oil shall be generated during maintenance and overhauling and shall be stored in environment friendly manner and sell to registered vendors only.
4.4 Other industrial process wastes Yes Slag generated from Ferro Alloys shall be reused for lining & Earth Preparation of Reaction vessels & will be sold to Silico Manufacturers
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment No Not Applicable
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes During operation coal will be burned The reaction vessel shall be connected to Dust Extraction System and Bag Filters.
5.2 Emissions from production processes Yes During operation the reaction vessel shall be connected to Dust Extraction System and Bag Filters.
5.3 Emissions from materials handling including storage or transport Yes Emission will be there in raw material handling, and internal transportation.
5.4 Emissions from construction activities including plant and equipment Yes Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the plant premises.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Odor will not be generated.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources Yes Wherever possibility of dust generation is mere, shall be connected to a de-dusting system
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Operation of equipment and vehicles will generate noise.
6.2 From industrial or similar processes Yes Mainly at the time of charging of raw material will generate additional noise. The effect of this noise will be within working premises only.
6.3 From construction or demolition Yes Due to operation of heavy machinery during construction.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Due to movement of heavy vehicles.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Spillage of used oil during Handling while loading and unloading may occur.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Zero liquid discharge shall be maintained.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Proper care will be taken by installing Bag filters followed by Stack to control source emission. Hence there will not be any major deposition of pollutants into air, land and water.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes It may occur, proper arrangements for firefighting etc. exist for proposed project.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not Anticipated
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Additional Employment generation
9.2 Lead to after-use of the site, which could have an impact on the environment No Not anticipated.
9.3 Set a precedent for later developments No Not anticipated.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not anticipated.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Reserve forest : Bid Sukli R.F. : 1 Kms : (W) Dongargaon R.F. : 5 Kms : (SE) Junapani R.F. : 7 Kms : (S) Water Bodies Vena river : 3 kms : (E) Krishna nala : 3kms : (SW) Kanholi Canal : 6.0 km : (SW) Vadgaon lake : 9.6 kms : (SE)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No No such area comes under the vicinity of the project.
8 Densely populated or built-up area Yes Butibori, Borkhedi, Kinhi, Tembhri etc.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospital, schools, places of worship, community facilities are present.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAbhishek
DesignationProprietor
Name of Company (Applicant Name should not be given here)VIBHUTI ALLOYS
AddressMr. Abhishek Rai M/s. Vibhuti Alloys 10, East high court road, Ramdaspeth, Nagpur-10