APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Integrated Municipal Solid Waste Management Facility at Anupinakatte Village, Shimoga District, Karnataka
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/KA/MIS/82362/2018
Project Cost 2500 lacs
2.
S. No. in the schedule7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
Project Sector INFRA-2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Proposed capacity: 300 TPD/ Area: 10.7 ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/KA/MIS/82358/2008
MoEFCC file number(Previous EC)10-54/2009-IA-III
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 10.7 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
a) Protected areas notified under the wildlife (Protection) Act, 1972
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectAnupinakatte Village, Shimoga District, Karnataka
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Survey Nos. 198, 202, 203, 204, 205, 206, 208, 209, 210 and 214
Town / VillageAnupinakatte Village, Shimoga City
State of the projectKarnataka
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)KarnatakaShimogaShimoga
10.
Nearest railway station along with distance in kms Shimoga Railway station (E), 7.6 km
Nearest airport along with distance in kms Mangalore International Airport is located (SW), 125 km
11. Nearest Town/City/District Headquarters along with distance in kms Shimoga City (E) , 2.3 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Purdal Panchayat Shimoga District, Karnataka State Pincode-577204
13. Name of the Applicant Somasekhar
14. Registered Address 13th Floor, Ramky Grandiose, Ramky Towers Complex, gachibowli, Hyderabad
15.
Address for correspondance:
Name of the Company MS RAMKY ENVIRO ENGINEERS LTD
Name of the Applicant Somasekhar
Designation (Owner/ Partner/ CEO) SeniorManager
Pin code 500032
E-mail mswmanagement18@gmail.com
Telephone No. 040-23015000
Fax No. 040-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?Yes
StatusApplication for Wildlife Clearance yet to be submitted
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
23.
Whether any Forest Land Involved?Yes
Area of Forest land Involved (hectares)As per Sec 18-10.7Ha & as per proposed Sec 26A-0Ha ha.
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Not Applicable
1.2 Clearance of existing land, vegetation and buildings? Yes As the facility is already in operational phase, only clearance of vegetation is envisaged and it will be minimal
1.3 Creation of new land uses? No Not Applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Applicable
1.5 Construction works? Yes Civil construction activities are involved for expansion of facility
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Local manpower to be employed
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes The proposed project involves expansion of Integrated Municipal Solid Waste Management Facility which requires landfill development, expansion of buildings, etc.
1.9 Underground works including mining or tunnelling? No There will be no underground works during the project construction or operation phase
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No The site is not lying near the shore
1.13 Production and manufacturing processes? Yes Process description for the facility is explained in Pre-Feasibility Report
1.14 Facilities for storage of goods or materials? Yes Materials which are used for construction shall be stored in temporary sheds at site
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The inerts from the process will be disposed in secured landfill and the leachate after recirculation will be treated in effluent treatment plant
1.16 Facilities for long term housing of operational workers? No No housing is proposed
1.17 New road, rail or sea traffic during construction or operation? No Existing road network is sufficient
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing infrastructure is sufficient to cater the traffic load due to the proposed expansion
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No No streams are crossing within the project site
1.23 Abstraction or transfers of water from ground or surface waters? No Water requirement for the project will be met through existing bore well within the site
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Surface drainage will not be affected. Garland drain will be provided at the site to properly collect the leachate separately
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Facility is in operational phase and has several large dedicated containerized vehicles for transportation, and shall adopt the conditions specified in the Solid Waste Management Rules 2016
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? No Only during construction temporary manpower influx is expected
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Land is provided by city municipal council, Shimoga
2.2 Water (expected source & competing users) unit: KLD Yes The fresh water requirement is about 20 KLD and will be met through existing bore well within the site
2.3 Minerals (MT) No No minerals are required
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All the construction material such as sand, steel, cement etc. will be purchased local dealers or suppliers in the surrounding areas as per design requirement during construction
2.5 Forests and timber (source – MT) No No wood is required in the expansion of project, except small quantity for making door and window frames
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The required power is estimated to be up to 250 kVA, and it will be sourced from state electricity board. DG set(s) will be used for power backup
2.7 Any other natural resources (use appropriate standard units) No No other natural resources are required
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not Applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures will continue to adopt which will restrict stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Improves economic living condition
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No All the excavated material generated out of construction of landfill will be used for construction of embankment of the cell
4.2 Municipal waste (domestic and or commercial wastes) Yes Solid waste generated from the facility will be processed within the facility
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous waste like used oils, grease, salts from ATFD, etc. will be sent to the authorized recyclers/nearest authorized TSDF for ultimate disposal
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes The sludge generated from wastewater treatment plant will be sent to nearest authorized TSDF
4.7 Construction or demolition wastes No Not Applicable
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No None envisaged
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No PM, SO2 and NOX from DG set will be dispersed into atmosphere through stack meeting MoEFCC standards
5.2 Emissions from production processes Yes Odor is expected during composting, and it will be reduced by regular turning of windrow, maintaining C:N ratio, etc.
5.3 Emissions from materials handling including storage or transport Yes Odor emission is expected from compost plant. Fugitive emission is expected due to vehicle movement
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions are likely during the construction & transportation activities due to use of construction equipment. These are temporary in nature
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is likely to be generated during construction phase of facility expansion; water sprinkling will be done to reduce dust emission. In addition to this, tarpaulin cover will be provided over stored raw material to reduce dust emission. Domestic wastewater will be treated in wastewater treatment plant
5.6 Emissions from incineration of waste No No incineration of waste will be done
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated during operation of equipment. However the effect of noise is temporary in nature and will be minimized by adopting proper maintenance of equipments such as greasing, oiling and insulation for noise abatement
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition No Not Applicable
6.4 From blasting or piling No No blasting or piling will be envisaged
6.5 From construction or operational traffic Yes Noise from vehicular movement is expected during construction and operational stage. It will be temporary in nature
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Hazardous waste like used oils, grease, salts from ATFD, etc. will be sent to the authorized recyclers/nearest authorized TSDF for ultimate disposal
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Contamination of land or water is not envisaged. Wastewater /leachate generated from the facility will be treated in wastewater treatment plant and the treated water will be reused for greenbelt
7.3 By deposition of pollutants emitted to air into the land or into water No The major emissions from the facility are PM, SO2 and NOx. Stack height meeting MOEFCC guidelines will be provided for proper dispersion of emissions. Hence chances of contamination of land and water by deposition of pollution is not envisaged
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Existing facility is an Integrated municipal solid waste management facility hence storage, handling, production of hazardous substances is not envisaged due to proper treatment methods adopted at the site. Adequate steps for firefighting will be taken to control fires in case of emergency. Proper EHS measures will be implemented.
8.2 From any other causes Yes Accidents during equipment and machinery operations are expected
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project area falls under earthquake zone II as per the Seismic Zoning Map of India, and it is classified as low damage risk zone
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Due to this project positive development is envisaged, as the socioeconomic conditions of the local population will be further improved
9.2 Lead to after-use of the site, which could have an impact on the environment No The landfill will be scientifically capped after the completion of project
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes As per Notification No. AFD:47, FWL:74: Proposed Section 26A - Shettihalli wildlife sanctuary is 0.9 km (W), Section 18 - Project site is within the Shettihalli wildlife sanctuary. Barehalla kere 3.1 km (W),Tunga river 5.5 km (SE),Tunga reservoir 9.2 km (S),Godwara kere 9.6 km (NW),Sidehalla kere 13.1 km (W). RF: Reserve Forest 0.6 km (NE),Puradahal 0.9 km (W),Bommenahalli 1.3 km (SW),Sakrebail 4.0 km (S),Anesara 4.5 km (W),Shankar Gudda 5.4 km (SW),Devabalu 6.9 km (N), etc.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes RF: Reserve Forest 0.6 km (NE), Puradahal 0.9 km (W), Bommenahalli 1.3 km (SW), Sakrebail 4.0 km (S), Anesara 4.5 km (W), Shankar Gudda 5.4 km (SW), Devabalu 6.9 km (N), Muddinakoppa 7.1 km (NW), Chorana Edehall 9.6 km (S), Kunchenhalli 10.1 km (N), Kudi 10.9 km (WNW), Hanigeri 13.4 km (WSW). Minor Forest: Basavapure 4.6 km (S), Siddilipur 6.0 km (N), Kadekal 10.5 km (S), Yeraganahalu 11.6 km (SE), Lakkinakoppa 13.5 km (SE), Chikka Danavandi 13.8 km (NW), Hubbanahalli 13.8
4 Inland, coastal, marine or underground waters Yes Surface Water bodies mentioned above, in Environmental sensitivity serial number 2.
5 State, National boundaries No None in the study area
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway (Bangalore – Honavar) NH 206 is 3.0 km (NE) and connects jog falls
7 Defence installations No None in the study area
8 Densely populated or built-up area Yes Nearest town is Shimoga City located at 2.3 km (E) from the facility
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Facilities like hospitals, schools, places of worship, and community facilities are available within 15 km, but away from the project site
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No None envisaged
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None envisaged
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project area falls under earthquake zone II as per the Seismic Zoning Map of India, and it is classified as low damage risk zone
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAKindly see the Final Minutes of 36th EAC Infra-II Meeting held on 26-28 November, 2018 04 Dec 2018
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSomasekhar
DesignationSeniorManager
Name of Company (Applicant Name should not be given here)MS RAMKY ENVIRO ENGINEERS LTD
Address13th Floor, Ramky Grandiose, Ramky Towers Complex, gachibowli, Hyderabad
Print