S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s A new technical grade pesticides plant capacity of 750 MTPA by Popular Chemical Manufacturers And Supplies
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/KA/IND2/84318/2018
Project Cost 500 lacs
2.
S. No. in the schedule5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 750 MTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0.82 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKarantaka
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Survey No 380
Town / VillageKaragada
State of the projectKarnataka
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)KarnatakaHassanBelur
10.
Nearest railway station along with distance in kms Chikmagalur, 13 km
Nearest airport along with distance in kms Manglore Airport, 140 km
11. Nearest Town/City/District Headquarters along with distance in kms Hassan , 36.17 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village: Karagada Taluk Belur District Hassan
13. Name of the Applicant Vedanth
14. Registered Address Hastha Hosamane Extension Chikmagalur, Karnataka
15.
Address for correspondance:
Name of the Company MS POPULAR CHEMICAL MANUFACTURER AND SUPPLIES
Name of the Applicant Vedanth
Designation (Owner/ Partner/ CEO) Partner
Pin code 577101
E-mail chemicalspopular@gmail.com
Telephone No. 8262-239838
Fax No. 8262-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes There will be permanent change in the land cover and the intensity of land use w.r.t. project site. The site earmarked for pesticide project, is presently vacant/ covered with perennial vegetation, which will be changed to industrial land.
1.2 Clearance of existing land, vegetation and buildings? Yes Minor vegetation clearance required for the project. Except the herb and shrubs species no tree will be uprooted during the construction phase. There are no exiting structures present at the site therefore; no clearance of building will take place. Biodiversity of the surrounding area will be maintained with well-planned landscape and tree plantation
1.3 Creation of new land uses? No Creation of new land use from the proposed project is not envisaged
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing shall be done as per requirement
1.5 Construction works? Yes Construction work will be required for the development of industrial land.
1.6 Demolition works? No Not Required
1.7 Temporary sites used for construction works or housing of construction workers? No There will be no requirement of temporary sites & housing facility as the labour deployed will be local. Temporary shelter with proper sanitation shall be provided to constructed workers if required for long term workers also.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Excavation for the construction of footings of the buildings etc will be done. Excavated soil will be used for site leveling, back filling/filling and road construction. Top soil will be separately stored and used for landscaping/horticulture development work.
1.9 Underground works including mining or tunnelling? No No mining or tunneling is proposed
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes The detailed process flow diagram and chemical reaction with material balance in the manufacturing of technical grade pesticide are incorporated in pre feasibility report.
1.14 Facilities for storage of goods or materials? Yes Separate ware houses will be constructed for incoming material and finished goods.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid hazardous wastes will be sent to TSDF site while other solid wastes will be segregated in salable and non-salable waste. Salable waste will be sold off. Non salable waste will be sent to land fill. The waste water will be treated in effluent treatment plant and will be reused for gardening
1.16 Facilities for long term housing of operational workers? No There will be no provision for housing facility for workers within the area as they will be employed from local area.
1.17 New road, rail or sea traffic during construction or operation? Yes Proposed project site is well connected to SH-57. New road shall be constructed in the plant premises.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No There is no new rail, air borne transport infrastructures is required for the project.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No such closure and diversion of existing transport is envisaged.
1.20 New or diverted transmission lines or pipelines? No No such diversion shall be carried out.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No such changes envisaged.
1.22 Stream crossings? No There is no involvement of any stream crossing
1.23 Abstraction or transfers of water from ground or surface waters? No It shall not abstract / transfer of ground / surface water. The required water will be arrange by tanker (out sources) water supplier.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No, there will be no change in water bodies and land surface and not change in drainage or run off
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Due to the proposed project, there will be movement of material and man power, involving movement of vehicles in and out of the plant, thus contributing to fugitive emission and noise in the area which will be maintained in within norms.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes During the construction phase about 100-150 persons will be deployed on the site from nearby places. Influx of these people will be temporary in nature.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No No loss of native species or genetic diversity is envisaged. However, Biodiversity of surrounding area will be well maintained with the local floras.
1.31 Any other actions? No None
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The plant will be located on agriculture land.
2.2 Water (expected source & competing users) unit: KLD Yes 29.5 KLD water will be arranged by outsources through tankers. Detail regarding water requirement with water balance is given in pre feasibility report .
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material will be purchased from local market.
2.5 Forests and timber (source – MT) No There will be no requirement of any forest timber for construction.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement: Total power requirement will be 300 KVA which will be sourced from State electricity board. DG set to be installed for power backup. Fuel Consumption For Power backup, HSD used as a fuel for D.G sets DG set of adequate capacity will be provided for emergency power supply.
2.7 Any other natural resources (use appropriate standard units) No There will be no any other natural resources. Rice Husk Briquette will be used for boiler.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Storage, transport & handling of hazardous substances shall be done as per norms and guidelines of manufacturer. MSDS shall be available within unit. Industry will carry out risk assessment study onsite/ offsite emergency plan as well as disaster management plan to avoid such incidents.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Project activities will not likely cause changes in occurrence of disease or affect disease vectors. During the construction period, adequate precaution will be taken to avoid stagnation of water to avoid mosquito breeding. Labour will be provided with purified water to avoid spread of waterborne diseases. Contamination of ground water will be avoided through proper drainage and housekeeping surface runoffs will be secured by efficient flow management.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Positive impact due to enhanced and hygienic living conditions on surrounding area. Aesthetic value of area will be improved; it will provide employment opportunities to the local people in terms of skilled and unskilled labour during construction and operational phase.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable.
3.5 Any other causes No Not Applicable.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable.
4.2 Municipal waste (domestic and or commercial wastes) Yes Due to propose new project some domestic waste will be increase. Entire Domestic waste will be segregated as biodegradable and non-biodegradable. Domestic waste will be disposed off properly to the earmarked area and will be sale to local vendors.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Solid hazardous wastes will be sent to TSDF site while other solid wastes will be segregated in salable and non-salable waste. Salable waste will be sold off. Non salable waste will be sent to land fill.
4.4 Other industrial process wastes No No other industrial process wastes generated will be generated
4.5 Surplus product No No surplus product will be generated.
4.6 Sewage sludge or other sludge from effluent treatment Yes The sewage will be treated in septic tanks. Sludge will be generated from effluent treatment plant which will be dried and packed in HDPE bags and send to TSDF site
4.7 Construction or demolition wastes Yes Other construction waste like bricks, concrete etc will be used in road works / manholes etc. Gunny bags, cardboards will be sent to a local licensed vendor. Demolition work is not involved.
4.8 Redundant machinery or equipment Yes The project shall generate redundant machinery and / or equipment as when its life is over. These machines will be sold to authorized scrape dealers.
4.9 Contaminated soils or other materials No The proposed project will not generate such waste.
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Flue gases will be generated from of combustion of Rice husk briquette and stand by Diesel Generating set
5.2 Emissions from production processes Yes P2O5 GAS will be generated from manufacturing process of aluminum Phosphide which will be scrubbed in water to produce H3PO4 (by product)
5.3 Emissions from materials handling including storage or transport No There will be very insignificant emission from material handling as the maximum raw material will be transported in closed containers and barrels only.
5.4 Emissions from construction activities including plant and equipment Yes There will be construction activity in this new project. During construction work, water sprinkling will be done
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will generate from loading and unloading of raw material for that regular water spraying will be done. Dust will be generated by movement of transport vehicles hence tar road will be constructed in the premises.
5.6 Emissions from incineration of waste No NA
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No burning of waste in open air will be done.
5.8 Emissions from any other sources No Not Envisaged
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes D.G Set will be used in case of power failure. Noise from DG set will be controlled by caustic enclosure as per law.
6.2 From industrial or similar processes No Noise and Vibration will be maintained with in norms in plant area. Ear plugs will be provided to workers in high noise prone area.
6.3 From construction or demolition Yes During various construction activities, noise will slightly increase for that particular time.
6.4 From blasting or piling No Not required
6.5 From construction or operational traffic Yes During the construction period noise will be slightly increase due to transportation and movement of vehicles.
6.6 From lighting or cooling systems No No noise generated from latest LED lightings. The cooling tower & pump will be designed to low noise.
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Handling of chemical will be done systematically. Precaution will be taken while storing chemicals. Secondary containment will be used Storage tank will have proper dyke walls.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage will treat in septic tank followed by soak pit. Waste water will be treated in ETP then it will used in gardening purpose. This is zero discharge project.
7.3 By deposition of pollutants emitted to air into the land or into water No No such pollutants are envisaged.
7.4 From any other sources No No additional source is installed in premises.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No As proper mitigative measure of dust control will be incorporated so that there is no risk of long term buildup off.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes During the operation Phase, no major risk of accidents will be anticipated. Risk assessment study will be carried out and all recommended safety measures would be incorporated in the plant. Adequate firefighting system and safety measures will be installed in the plant to prevent and control risks/ accidents.
8.2 From any other causes No No other sources foreseen.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The area falls under Seismic zone II
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The proposed project will not have any impact on additional development of houses because it shall source local workers. Local population already has housing facility. It will increase some transportation facility by increase in movement of raw material and finished products. It will increase some ancillary facility associated with industrial activity like information technology, transport services etc. in fact it shall improve infrastructure, and earning of local people and surrounding area
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes It shall increase employment and income of local habitant of area. The increase in income shall improve better life and environment.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No No cumulative effect is expected. Presently there is no other similar type of project is under operation or being planned.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No there is no such areas envisage.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes S.No. Name Distance (In km) Direction 1. Kalasapur State Forest 5.07 ENE Water Bodies S.No. Name Distance (In km) Direction 1. Yogachi River/Reservoir 4.61 South 2. Magadi Pond 4.56 North 3. Galihalli Pond 9.1 ENE 4. Kodihalli Pond 5.6 WNW 5. Birani Halla 3.6 SW 6. Vedawati Halla 7.21 SW 7. Arasana Channel 3.24 SW 8. Tamasandi Channel 4.58 SW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Yes there is a Kalasapur State Forest present at distance of 5.07 km in ENE direction from the project site.
4 Inland, coastal, marine or underground waters No No Inland, coastal, marine or underground waters found within the 15 km from the proposed project site.
5 State, National boundaries No No State, National boundaries found within the 15 km from the proposed project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Name Distance (In km) Direction SH-57 0.49 East NH-234 8.81 SE SH-110 9.23 SE
7 Defence installations No Not envisaged
8 Densely populated or built-up area Yes Yes there are small villages present near the project site which are not densely populated. However, the proposed project site is located near taluk belur which is at distance of 9.06 km in south direction and Chikkamagaluru district is located at 9.79 km in NW direction from the project site, which are highly densely populated area.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There are few hospitals, schools, a place of worship and community facilities has been observed within the 15 km range of study areas. Some of them are given below S.No. Particulars Distance (In km) Direction 1. Siddeshwar Temple 2.2 SE 2. Channabasaveshwara Temple 2.96 SE 3. Anjaneya Temple 2.33 SW 4. Naryana Swami Temple 2.33 SW 5. Sai Angle School 7.93 NW 6. Malalur Government Higher Primary School
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not envisaged
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not envisaged
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The project is located at seismic zone II according to Indian Standard Seismic Zoning Map. There are no possibilities of the proposed project site getting flooded as per available records. Landslides not applicable as the project site & surrounding land are flat.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 16 Nov 2018
2.NAPlease confirm the availability of the land with the PP and permission for its Industrial use. 05 Nov 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantVedanth
DesignationPartner
Name of Company (Applicant Name should not be given here)MS POPULAR CHEMICAL MANUFACTURER AND SUPPLIES
AddressHastha Hosamane Extension Chikmagalur, Karnataka
Print