APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Shree Doodhaganga Krishna Sahakari Sakkare Karkhane Niyamit
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/KA/IND2/102421/2019
Project Cost 10220 lacs
2.
S. No. in the schedule5(g) Distilleries
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 60KLPD ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/KA/IND2/102418/2000
MoEFCC file number(Previous EC)J-11011/8/2000-IA-II(I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 2.49 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectS.No.627, Kerur, Tal. Chikodi, Dist. Belgavi
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.S.No. 627
Town / VillageKerur
State of the projectKarnataka
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)KarnatakaBelgaumChikodi
10.
Nearest railway station along with distance in kms Raibag, 35 km
Nearest airport along with distance in kms Belgaum, 74 km
11. Nearest Town/City/District Headquarters along with distance in kms Chikodi , 9 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Kerur Grampanchayat, Tal. Chikodi, Dist. Balgavi, Karnataka State
13. Name of the Applicant Ravindra
14. Registered Address Nanadi, Tal.: Chikkodi, Dist.: Belgavi, Karnataka
15.
Address for correspondance:
Name of the Company SHREE DOODHAGANGA KRISHNA SAHAKARI SAKKARE KARKHANE NIYAMIT
Name of the Applicant Ravindra
Designation (Owner/ Partner/ CEO) MD
Pin code 591247
E-mail dk.sugar1@gmail.com
Telephone No. 08338-267200
Fax No. 08338-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No There would be no change in existing land use pattern since it is an expansion of distillery project that would be undertaken in existing premises. Refer Additional attachment for the plot layout.
1.2 Clearance of existing land, vegetation and buildings? No There would be no vegetation clearance since land is being used for existing activities of SDKSSKN. A land was kept vacant for expansion of distillery in existing premises.
1.3 Creation of new land uses? No Not Applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Applicable
1.5 Construction works? Yes Infrastructure like Admin Building, Common Utility, Canteen, Evaporator House etc. would be used from existing distillery. Equipments and machineries like fermentation tanks, distillation column, spent wash storage tanks, silos, alcohol storage tanks, boiler shed, cooling towers etc. as required for proposed expansion unit would be installed.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction works or housing of construction workers? Yes Temporary shelters for labors would be constructed on site which would be removed after completion of the construction work.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Refer point No. 1.5 above.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No There would be no change in topography, land use or change in water body due to manufacturing activities in, distillery plant unit. Molasses by product from sugar factory shall be used as raw material for distillery. Refer Additional attachment for manufacturing process description & flow chart.
1.14 Facilities for storage of goods or materials? Yes For the storage of raw materials and finished product (Alcohol) in distillery; separate arrangements would be done.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sp. wash generated from proposed distillery shall be conc. in MEE. Conc. sp.wash - burnt in incineration boiler & boiler ash shall be given to the brick manufactures. Other effluents, MEE condensate & spentlees from distillery – treat in proposed CPU & recycled back in process. Domestic effluent - treated in proposed STP.
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? Yes Minor road traffic is expected during transfer of material required for fabrication / construction from the local area shops to site. Also, minor road traffic will be expected during transportation of raw material as well as products.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There would be no change in hydrology of water sources due to SDKSSKN activities. Fresh Water required for distillery activities would be taken from the Krishna River.
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No No ground water shall be used for proposed distillery activity. The water required for various operations under SDKSSKN project would be met from Krishna River.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Work related to construction, installation of equipments and machineries as required under SDKSSKN distillery project activities would be done on site for which local labors shall be used. During the work, movement of equipment and machinery would occur at the project site.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Temporarily for equipment installation work there would be influx of people to the project site. However, it would be of a temporary nature.
1.29 Introduction of alien species? No Not Applicable.
1.30 Loss of native species or genetic diversity? No Not Applicable.
1.31 Any other actions? No Not Applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed expansion of distillery shall be takes place in existing premises of SDKSSKN. No any agricultural land is being diverted for proposed activities. Refer plot layout plan enclosed in Additional attachment for more details.
2.2 Water (expected source & competing users) unit: KLD Yes Water required for expansion of distillery plant would be taken from Krishna River. Distillery – Total water requirement after proposed expansion activity is 1025.2 CMD. Out of this, 682 CMD shall be recycled water and 343.2 CMD shall be fresh water. Refer Additional attachment for detailed water budget.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The required construction material would be purchased from nearby sources through the suppliers.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power required for distillery operation and construction work would be taken from existing 50 MW co-gen plant.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Product from distillery – Ethanol, RS, ENA shall be stored in tank which is highly flammable.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No There is no such report of occurrence of any waterborne diseases or any disease vectors. Moreover, under existing project, the Industry has hire qualified doctors to carry out regular health checkups of every worker. Also, record w.r.t. same are maintained on site. Programs related to health and hygiene is arranged & workshops as well as seminar are conducted in industry to create awareness.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Already due to existing project, provides employment opportunity. Moreover, After expansion of distillery, there would be a positive impact on the social and economic status of local people due to direct and indirect employment opportunities. This will help to improve the life style of local people in surrounding area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable, since it is proposed expansion project of distillery. During implementation of expansion activity there shall not be any major generation of overburden.
4.2 Municipal waste (domestic and or commercial wastes) No Not Applicable
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes As per the Hazardous Wastes (HW) (Handling, Management & Transboundary Movement) Forth Amended Rules, 2010; the HW generated after proposed expansion activities would be in the form of Used Oil under Cat. No. 5.1 to the tune of 0.45 MT/M which would be burnt in boiler as fuel.
4.4 Other industrial process wastes Yes Ash generated from sp. Wash & coal incineration would be sold to brick manufacturer. Yeast sludge generated after expansion to the tune of 17 MT/M, CPU sludge to the tune of 42 MT/M would be used for the incineration.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Refer Point No. 4.4 above.
4.7 Construction or demolition wastes Yes Negligible quantity of construction waste would be generated same would be used for filling low lying areas in factory premises. Scrap if any shall be sold to outside parties for reuse.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Under proposed distillery expansion, a boiler of 20 TPH shall be installed. Sp. wash (116 MT/D) + Coal (44 MT/D) would be used as fuel. APC - ESP followed by stack of 59 M.
5.2 Emissions from production processes Yes After expansion of distillery, from manufacturing there would be process emission in the form of CO2 76 MT/D. Same would be collected, purified, compressed and filled in cylinders & sold out for production of Beverages. Thus, no any problems to the surrounding area would be created due to the Air Pollution aspect.
5.3 Emissions from materials handling including storage or transport Yes Negligible amount of emissions would be generated from storage or transport.
5.4 Emissions from construction activities including plant and equipment Yes Dust would be generated during construction activity. Same shall be curbed by sprinkling water in premises. Also, during assembling the pre fabricated structure of tank & column there may be emissions from welding activity. But same may be negligible & temporary.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Molasses and spent wash are putrifiable substances. Hence, if GMP is not followed then it may lead to odor nuisance.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable, since no any waste would be burnt in open air.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Probable sources of noise are boiler, distillation assembly, D.G. Sets etc. Proper acoustic treatments are provided to keep noise levels below permissible limits as per CPCB standards. Workers are provided with PPE’s. The same shall be followed under expansion.
6.2 From industrial or similar processes Yes Same as point No. 6.1
6.3 From construction or demolition Yes During the construction, minor noise would be generated from fabrication work and operations of machinery. However, the same would be of temporary nature and workers getting exposed to same would be provided with PPE.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes During the construction, minor noise would be generated from fabrication work and operations of machinery. However, the same would be of temporary nature and workers getting exposed to same would be provided with PPE.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Ethanol, product of distillery is a hazardous chemical as per MSIHC rules. Same will be stored on site as per OISD standards. Handling of alcohol will be done through closed & automatic system. Also, fire frightening system & Dyke walls will be provided around alcohol storage tank.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Total effluent after expansion of distillery, Spent wash would be 720 CMD. The same shall be concentrated in evaporators. Further, the conc. spent wash 144 CMD shall be subjected to incineration in boiler. Other Effluents viz. spent leese 127 CMD, cooling tower b/d, boiler b/d, lab & washing 40 CMD will treat in CPU. Treated water - recycled & thereby achieving ZLD. Domestic effluent of 5 CMD treated in proposed STP.
7.3 By deposition of pollutants emitted to air into the land or into water No Under proposed expansion of distillery a incineration boiler would be installed. Same shall be provided with ESP as APC equipment followed by adequate stack height.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Based on preliminary hazard identification, storage & handling facilities of alcohol have been recognized as distinctive & relatively evidential risk source. Alcohol shall be stored in tank provided with dyke wall. Bagasse & coal - stored separately in storage yards. Training shall be given to workers regarding Fire-Fighting & made aware.
8.2 From any other causes No Not Applicable.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The possibility of project getting affected by earthquake resulting in to subsequent environmental damage is very negligible
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Permanent buildings, structures as required for establishment & operation of expansion would be built. Moreover, there would be development of roads inside the plant area as well as power supply arrangements for plant & machinery operations & for lighting.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable.
9.3 Set a precedent for later developments No Not Applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes 1. Venkateshwara Power Project Ltd., A/P – Bedkihal, Tal. – Chikodi. 2. Shree Chandreshwari Chemicals Pvt. Ltd., Nej, Tal. Chikodi.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not Applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters No Not Applicable
5 State, National boundaries No State Boundary Maharashtra-Karnataka – at 7 Km distance from current project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway (NH- 4) is about 27 Km & State Highway (SH - 72) is about 2.8 Km away from project site.
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes Chikodi
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) No Not Applicable
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Krishna River is about 8 Km away from project site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
IEM Certificate
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRavindra
DesignationMD
Name of Company (Applicant Name should not be given here)SHREE DOODHAGANGA KRISHNA SAHAKARI SAKKARE KARKHANE NIYAMIT
AddressNanadi, Tal.: Chikkodi, Dist.: Belgavi, Karnataka