APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Expansion of Pesticides Industry and Pesticide Specific Intermediates by M/s. Nichino Chemical India Private Limited
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/KA/IND2/102356/2019
Project Cost 12689 lacs
2.
S. No. in the schedule5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Proposed Capacity: 7051.8 TPA, Total Area; 5.46 Ha ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/KA/IND2/102355/2010
MoEFCC file number(Previous EC)J-11011/132/2010-IA II (I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 5.46 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPlot nos. 50, 82P, 83 and 84P of Karnataka Industrial Area Development Board (KIADB), Industrial Area, Humnabad Taluk, Bidar district, Karnataka
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Plot nos. 50, 82P, 83 and 84P
Town / VillageKarnataka Industrial Area Development Board (KIADB), Industrial Area, Humnabad Taluk
State of the projectKarnataka
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)KarnatakaBidarHomnabad
10.
Nearest railway station along with distance in kms Humnabad railway station, 4.7 km
Nearest airport along with distance in kms Kalaburagi Airport, 52 km
11. Nearest Town/City/District Headquarters along with distance in kms Bidar , 42 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayat address (local body): KIADB, Humnabad Taluk, Bidar District, Karnataka State
13. Name of the Applicant BabuRao
14. Registered Address Nichino Chemical India Pvt. Ltd.
15.
Address for correspondance:
Name of the Company NICHINO CHEMICAL INDIA PVT LTD
Name of the Applicant BabuRao
Designation (Owner/ Partner/ CEO) SeniorWorksManager
Pin code 585330
E-mail nichinochemical@gmail.com
Telephone No. 040-23772502
Fax No. 040-23772595
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Addition of buildings in the existing premises. Please refer Annexure-XVII in Pre-Feasibility Report (PFR) for Plant Layout.
1.2 Clearance of existing land, vegetation and buildings? No Not Envisaged. Additional buildings in the open land of existing premises.
1.3 Creation of new land uses? No Expansion in the existing premises located in the Notified Industrial Area. Please refer Annexure-XVII in Pre-Feasibility Report (PFR) for Plant Layout.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil and water analysis reports are enclosed in PFR report as Annexure –XXI & XXV.
1.5 Construction works? Yes Addition of Buildings in the existing premises. Please refer Annexure-XVII in Pre-Feasibility Report (PFR) for Plant Layout.
1.6 Demolition works? No Not envisaged
1.7 Temporary sites used for construction works or housing of construction workers? No Addition of buildings in the existing premises. Construction Workers are coming from nearby villages.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Addition of Buildings in the existing premises. Please refer Annexure-XVII in Pre-Feasibility Report (PFR) for Plant Layout.
1.9 Underground works including mining or tunnelling? No Not envisaged.
1.10 Reclamation works? No Not envisaged.
1.11 Dredging? No Not envisaged.
1.12 Offshore structures? No Not envisaged.
1.13 Production and manufacturing processes? Yes Please refer Annexure – XVIII in PFR for manufacturing process
1.14 Facilities for storage of goods or materials? Yes Additional storage facility to meet the expansion requirements.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Existing facilities will be upgraded to meet the proposed requirements of Solid waste or Liquid effluent. Please refer Table 10 of PFR for details of solid waste disposal.
1.16 Facilities for long term housing of operational workers? No Most of the workers are locals and nearby villages.
1.17 New road, rail or sea traffic during construction or operation? No Expansion in the Existing unit
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Expansion in the Existing unit
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Expansion in the Existing unit
1.20 New or diverted transmission lines or pipelines? No Expansion in the Existing unit
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Expansion in the Existing unit
1.22 Stream crossings? No Expansion in the Existing unit
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water requirement for the industry will be met through private tankers.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Expansion in the Existing premises located in the Notified Industrial Area.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Expansion in the existing premises located in the Notified Industrial Area. The sources of raw materials and machinery for operation will vary based on market driven forces, which will be transported via roads.
1.26 Long-term dismantling or decommissioning or restoration works? No Expansion in the open land of Existing premises
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Expansion in the open land of Existing premises.
1.28 Influx of people to an area in either temporarily or permanently? Yes Workers / employees will be increased and the working hours are in shifts / general.
1.29 Introduction of alien species? No Not envisaged.
1.30 Loss of native species or genetic diversity? No Expansion in the open land of Existing premises.
1.31 Any other actions? No -
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Expansion in the existing premises located in the Notified Industrial Area.
2.2 Water (expected source & competing users) unit: KLD Yes Water source: Supply from private tankers s. Quantity: 507 KLD (Fresh Water: 368.5 KLD) Please refer Table 7 of PFR for Water Balance.
2.3 Minerals (MT) No Not applicable.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials are procured from the local market and construction is based on the plant layout. Please refer Annexure-XVII in Pre-Feasibility Report (PFR) for Plant Layout.
2.5 Forests and timber (source – MT) No Not applicable.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Existing power requirement is 900 KVA and after expansion it will be 1350 KVA power (electricity). About 60 TPD of coal / Bio fuel will be used for proposed 2 nos. of 5 TPH coal/bio fuel fired boilers along with existing 3 & 2 TPH boiler. About 300 lit/hr diesel will be used for proposed 625 KVA DG sets along with existing DG sets of 625 KVA and 250KVA.
2.7 Any other natural resources (use appropriate standard units) No -
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes List of Hazardous Chemicals used in the proposed products are enclosed in Annexure-XX in PFR.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Effluent will be sent to ETP-ZLD system. Treated water will be reused in cooling towers. All solid waste will be stored in the covered platform with leachate collection system and sent to TSDF / Authorized agencies. Process emissions will be scrubbed in the scrubbers.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The welfare of the people will have positive effects as the industry will continue to participate in the village welfare measures. Developing the greenbelt in and around the plant site and vacant places of industry.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Industry is located in Notified Industrial Area and Plant boundary is more than 2 km away from the nearest habitation.
3.5 Any other causes No -
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not envisaged.
4.2 Municipal waste (domestic and or commercial wastes) Yes The commercial waste from the administration building is generated and is sent to scrap vendors.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Please refer Table 10 of PFR for details of Hazardous wastes generated from the proposed products.
4.4 Other industrial process wastes Yes Please refer Table 10 of PFR for details of Hazardous wastes generated from the proposed products.
4.5 Surplus product No Production will be based on the market demand. Hence No surplus production will be generated.
4.6 Sewage sludge or other sludge from effluent treatment Yes Domestic wastewater is sent to ETP- Biological treatment. Please refer Table 10 of PFR for ETP Sludge generation details.
4.7 Construction or demolition wastes Yes Construction is as per plant layout and ensures to reduce the construction or demolition waste.
4.8 Redundant machinery or equipment No Not envisaged.
4.9 Contaminated soils or other materials No Not envisaged.
4.10 Agricultural wastes No Nil
4.11 Other solid wastes Yes Industry will also generate the solid / hazardous waste, E-waste, Municipal waste from canteen and Bio-medical waste. Spillages such as wastewater / solid wastes / raw materials are possible and the risk of this would be limited to within the premises of the manufacturing facility.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes About 60 TPD coal / Biofuel will be used in proposed & existing boilers and about 300 lit/hr diesel will be used in proposed and existing DG Sets. Please refer Table 15 of PFR for Emission details.
5.2 Emissions from production processes Yes Please refer Table 14 of PFR for emissions from process reactions of the proposed expansion products.
5.3 Emissions from materials handling including storage or transport Yes Pumps will be used for handling liquid raw materials and trolleys will be used for Solid / Powder type raw materials. Vent condensers will be provided for all storage tanks, Centrifuges, catch pots.
5.4 Emissions from construction activities including plant and equipment Yes It will be temporary and insignificant during the construction phase of project.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will be generated due to construction activities and transportation of goods and materials. It will be reduced by water spray at construction waste and on roads.
5.6 Emissions from incineration of waste No Existing incinerator is removed in the proposal. Proposed to send Incinerable Hazardous waste to TSDF for incineration or SPCB Authorized Cement industries.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not envisaged. All construction debris will be used as filling material for roads and other waste materials are sold as scrap.
5.8 Emissions from any other sources No Not envisaged.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated from the utilities section. Silencers will be provided for DG Sets and other utilities equipment and these will be installed in separate room.
6.2 From industrial or similar processes Yes Noise will be generated from the pumps, motors, centrifuges etc., which will be controlled by proper maintenance and procuring the sound proof equipments
6.3 From construction or demolition Yes Noise will be generated during construction phase, which will be temporary and for short time
6.4 From blasting or piling No Not envisaged.
6.5 From construction or operational traffic Yes Noise will be generated from the transportation vehicles.
6.6 From lighting or cooling systems No Nil
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Accidental spillages may occur. Spillages such as wastewater/solid wastes/raw materials are possible and the risk of this would be limited to within the premises of the manufacturing facility. Precautionary measures are implementing in the existing industry and will continue for proposed project also for spillage control and to avoid contamination of land or water from the pollutants or raw materials. Suggestions from the safety consultants will be followed to avoid the risk and prevent acciden
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Process effluents will be pumped to the above ground level R.C.C lined tanks for storage and neutralization then sent to ETP – ZLD. In-house treatment (ZLD) with primary treatment, secondary treatment and Tertiary treatment. Domestic wastewater will be sent to ETP Biological treatment.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Possibility of deposition of pollutants emitted to air into the land or into water cannot be ruled out and the precautions taken by the industry to control such emissions by adopting the suitable controlling equipment.
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes All safety precautions are taken by the industry to avoid such accidents.
8.2 From any other causes Yes Proper earthing for Static Electricity provided for all equipment and same will be continued in the proposed project also.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not envisaged.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting infrastructure such as Roads, Power supply, waste or wastewater treatment etc., may have impacts on the project activities. However the impact from such activities will be limited. All employees will be coming from nearby villages. Not envisaged. Raw material supplies will be increased. Not envisaged.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not envisaged.
9.3 Set a precedent for later developments No Not envisaged.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not envisaged.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes • RF near Kallur Tanda (open scrub)-3.1 km (S) • RF near Pandaragera (Dense scrub)-5.8 km (SW)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not envisaged.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not envisaged.
4 Inland, coastal, marine or underground waters Yes • Pond Near Dhumansur Tanda at 6.1 km (NE) • Pond Near Hallikhed at 7.6 km (S) • Mullamari Reservoir at 9.1 km (SW) • Chandri Halla at 2 Km (N)
5 State, National boundaries Yes Nil
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes National Highway No. 65 – 1.4 km (N).
7 Defence installations No -
8 Densely populated or built-up area Yes Humnabad – 2.3 km (NE)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals, schools, temples and other general community facilities exist in the settlements in the study area.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The project area falls under seismic zone II (Least Active).
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantBabuRao
DesignationSeniorWorksManager
Name of Company (Applicant Name should not be given here)NICHINO CHEMICAL INDIA PVT LTD
AddressNichino Chemical India Pvt. Ltd.