APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed Expansion Project by adding Beneficiation Plant, Sponge Iron Plant, Induction Furnace, Captive Power Plant and Rolling Mill in the Existing Sponge Iron Plant of M/s. Bhadrashree Steel and Power Ltd. | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/KA/IND/91002/2019 | Project Cost | 22528 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Ore Beneficiation Plant -0. 6 MTPA, Sponge Iron 2 X 100 TPD, Induction Furnace 2 X 15 TPD,Rolling Mill 120000 TPA,Captive Power Plant 15 MW (WHRB – 8 MW + AFBC – 7 MW) ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/KA/IND/91001/2008 | MoEFCC file number(Previous EC) | FEE 81 ECO 2008 | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 200 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Kunikeri village, Koppal Taluk & District | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 114, 115 & 116 | Town / Village | Kunikeri village, Koppal | State of the project | Karnataka | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Karnataka | Koppal | Koppal | | 10. | |
Nearest railway station along with distance in kms | Ginigera Railway Station, 8 km | Nearest airport along with distance in kms | Hubballi, 130 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Koppal , 10 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Koppal Zilla Parishad, DC Office Complex, Koppal-583231, Ph: 08539220844 | | 13. | Name of the Applicant | Mudit | | 14. | Registered Address | Plot No 16, Ananda Nilaya, Jain Colony, Near Baldota Park | | 15. | |
Address for correspondance: | Name of the Company | BHADRASHREE STEEL & POWER LIMITED | Name of the Applicant | Mudit | Designation (Owner/ Partner/ CEO) | ManagingDirector | Pin code | 583201 | E-mail | bhadrashreeltd@gmail.com | Telephone No. | 08394-230808 | Fax No. | 08394- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | As it is in existing project site with necessary land conversion. The project site has already broken for allied activities. | 1.2 | Clearance of existing land, vegetation and buildings? | No | It is a vacant agricultural land. | 1.3 | Creation of new land uses? | No | Additional plant structures will come-up as this is expansion project. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not applicable as it is an existing project site | 1.5 | Construction works? | Yes | Construction work for the proposed expansion project including building, office, plant & machinery and related required amenities. | 1.6 | Demolition works? | No | No demolition works will be carried out as the land is vacant. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Nil | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Major construction work will be above ground except foundation, pipeline work and underground tank and reservoir | 1.9 | Underground works including mining or tunnelling? | No | None | 1.10 | Reclamation works? | No | Not required | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Detailed Project cum Pre Feasibility Report in this connection. | 1.14 | Facilities for storage of goods or materials? | Yes | Separate area for raw material and finished product will be identified and demarcated | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Tailing, Flyash and Slag-Temporary storage in the storage area. Tailing and Fly Ash shall be sold for Brick manufacturing and to cement plants.
Slag will be utilized for strengthening of internal roads and sold to cement plants.
Biodegradable waste from canteen and sludge from Sewage Treatment plant will be composted and utilized for green belt in the plant premises, Process water will be recycled and reused. | 1.16 | Facilities for long term housing of operational workers? | Yes | Housing quarters for operational staff & workers will be provided | 1.17 | New road, rail or sea traffic during construction or operation? | No | Existing Road network will cater to the requirements of the plant. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Existing transportation network will cater to the requirements of the plant. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | None | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | As hydrology of water course or aquifers not change due to tailing pond | 1.22 | Stream crossings? | No | No water stream flows through the purchased property boundary. | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Entire water will be drawn from the Bore well which will be collected in underground reservoirs. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | The proposed changes in the land shall not affect the drainage pattern or runoff | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction material will be brought from outside.
Personnel will be predominantly from local community and specialized skilled manpower from outside. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | None. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | None | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporary Const./Ere.: 80- 100 Persons
Permanent Operation stage: 500 Persons | 1.29 | Introduction of alien species? | No | None | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species is anticipated. | 1.31 | Any other actions? | No | None | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | 30 Acres of land has been purchased & the
entire land will be converted from Agricultural to Non-agricultural land for industrial use. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Bore wells-62500 | 2.3 | Minerals (MT) | Yes | Iron ore, Coal, Dolomite | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Stone, aggregates, sand / soil and Bricks for construction during construction phase | 2.5 | Forests and timber (source – MT) | No | Nil | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | During construction phase and till commissioning of plant, Power requirement will be met from GESCOM and also from stand by DG sets will be availed and once plant commissioned the power will be met through captive power plant of 15 MW | 2.7 | Any other natural resources (use appropriate standard units) | Yes | High Speed Diesel to run stand by DG Set and movement of vehicles. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Hazardous materials will not be above the thresh hold limit of MSIHC rules. Details are given in PFR. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not envisaged | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The project will help in improving the socio-economic condition of the region through direct and indirect employment. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | There will not be any impact on human settlement. | 3.5 | Any other causes | No | Not envisaged from the proposed project | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Biodegradable waste from canteen will be composted and utilized for green belt in the plant premises. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used / Spent oil will be given to approved recyclers/ reprocessors. | 4.4 | Other industrial process wastes | Yes | Adequate measures shall be adopted to limit the emission of pollutants within the stipulations of statutory norms. | 4.5 | Surplus product | No | None | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge will be composted and utilized for green belt in the plant premises. | 4.7 | Construction or demolition wastes | Yes | Only construction waste debris will be recycled and used in leveling of own land. | 4.8 | Redundant machinery or equipment | No | Only construction waste debris will be recycled and used in leveling of own land. | 4.9 | Contaminated soils or other materials | No | None | 4.10 | Agricultural wastes | No | None | 4.11 | Other solid wastes | No | None | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions from the process will be ensured that the parameters meet the statutory guidelines. | 5.2 | Emissions from production processes | Yes | Emissions from the process will be ensured that the parameters meet the statutory guidelines. | 5.3 | Emissions from materials handling including storage or transport | Yes | Flue gas from the Kiln, Boilers. Air pollution control measures like Bag filters, ESP, Gas coolers, Cyclones and Chimney will be adopted. | 5.4 | Emissions from construction activities including plant and equipment | Yes | There will be dust emission from movement of vehicles during construction activity which will be temporary. Water will be sprayed to suppress the dust etc. at the time of construction activities. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | There will not be any odour in the entire process. However there will be fugitive emissions during construction and dust suppression measures will be adopted | 5.6 | Emissions from incineration of waste | No | None | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | None | 5.8 | Emissions from any other sources | No | None | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise will be generated from HEMM’s, trucks, wheel loaders, Belt conveyor and other equipments during operation of plant.
All the employees working in the critical location will be provided with PPEs. Effective control measures will also be adopted. | 6.2 | From industrial or similar processes | Yes | Noise will be generated from operation of plant and equipments. Suitable effective control measures will be adopted to ensure noise levels are well within the stipulated norms. | 6.3 | From construction or demolition | Yes | Minimal during construction activity. Construction will be predominantly during day time only | 6.4 | From blasting or piling | No | No blasting activity is involved | 6.5 | From construction or operational traffic | Yes | Noise will be generated during construction phase due to many HEMM’s working at a time. Also, there will be increase in movement of vehicles during operation phase for incoming raw materials and outgoing finished products. Suitable effective control measures will be adopted to ensure noise levels are well within the stipulated norms. | 6.6 | From lighting or cooling systems | Yes | Personnel Protective equipments (PPEs) would be used. | 6.7 | From any other sources | No | None | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | There will not be any risk of contamination of land or water from hazardous materials. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Process water will be recycled and reused in the process. Generated wastewater from cooling tower shall be utilized for dust suppression at various locations. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Not envisaged. | 7.4 | From any other sources | No | Nil | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not envisaged | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Spillages if any will be collected and utilized within the plant. Fire is identified hazard. Risk assessment and the post disaster management plan will be proposed and prepared. | 8.2 | From any other causes | No | Nil | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | There is no recorded event of natural disaster over last 50 years in this area. The area is not prone to floods, earthquakes, landslides and cloud bursts | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Installation of steel plant help- market for mining industries, revenue & employment installation of captive power plant will reduce the stress on the grid, the unit shall promote education, health care, self employment programs. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | None. | 9.3 | Set a precedent for later developments | No | No such precedents are anticipated | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Employment opportunity, opportunity for entrepreneurial activity and Community development initiatives towards Education, Health, Sanitation and Self help group activities, will improve as a cumulative effect. Lot of similar type of industries is in operation within the study area of 10 km radius. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | No ecological, cultural, landscape and protected area are present within the study area. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | The project is located at a 5.5 km (aerial distance) from the Tungabhadra Reservoir backwater. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | No protected species of flora and fauna for breeding, nesting, foraging, resting present in the study area. | 4 | Inland, coastal, marine or underground waters | No | No inland, coastal, marine or underground waters | 5 | State, National boundaries | No | There are no inter-State, National boundaries within study region | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None | 7 | Defence installations | No | No defense installation within study region. | 8 | Densely populated or built-up area | Yes | Kunikeri Village having 3,471 populations, which is at a distance of 1.5 km. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, schools, colleges places of worships and community facilities are present within the study region. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | There are no areas containing important, high quality or scarce resource in the region. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The area is not susceptible for natural hazards like earthquake, subsidence, landslides, flooding etc, and there are no records of such incidents over the past 50 years. | | (IV) | Proposed Terms of Reference for EIA studies | | Additional Attachments, if any |
---|
Attached File |
---|
ADS Letter |
| | Essential Detail Sought : NIL | | Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | State Government has been clarified the clarification sought by MOEF&CC.
Request Letter has been uploaded to reopen our proposal. | 11 Nov 2020 | 2. | NA | ADS | 27 Feb 2019 | 3. | NA | ADS | 27 Feb 2019 | 4. | NA | ADS | 27 Feb 2019 | 5. | NA | ADS | 27 Feb 2019 | 6. | NA | ADS | 27 Feb 2019 | | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Mudit | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | BHADRASHREE STEEL & POWER LIMITED | Address | Plot No 16, Ananda Nilaya, Jain Colony, Near Baldota Park |
|
|