APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Expansion of Ferro Alloys plant from 11,500 TPA to 37,500 TPA (product mix of Silico manganese, Ferro manganese and Ferro silicon within the allowed capacity) by M/s Shree Bholey Alloys Private Limited | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/JH/IND/75919/2018 | Project Cost | 2900 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 37,500 TPA ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/JH/IND/75918/2009 | MoEFCC file number(Previous EC) | J-11011/317/2009-IA II (I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 11500 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Phase – IV/C- 1 (P) 3 Industrial Area, Village – Goradih/ Balidih, PO: Bokaro Steel City, Dist.- Bokaro Jharkhand-827104. | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Phase – IV/C- 1 (P) 3 Industrial Area | Town / Village | Village – Goradih/ Balidih, PO: Bokaro Steel City, Dist.- Bokaro Jharkhand-827104. | State of the project | Jharkhand | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Bokaro | Chas | | 10. | |
Nearest railway station along with distance in kms | Tupkadih Railway Station, 3.15 km | Nearest airport along with distance in kms | Bokaro Airport, 9.40 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Chas , 11.80 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Gorabalidih | | 13. | Name of the Applicant | Rakesh | | 14. | Registered Address | Barwaadda, PO Kalyanpur, Dhanbad | | 15. | |
Address for correspondance: | Name of the Company | SHREE BHOLEY ALLOYS PRIVATE LIMITED | Name of the Applicant | Rakesh | Designation (Owner/ Partner/ CEO) | Director | Pin code | 826004 | E-mail | shreebholey2018@gmail.com | Telephone No. | 120-4044630 | Fax No. | 120- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | No change in the land use as project falls in industrial area and no additional land is required for the expansion project. | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not Required | 1.3 | Creation of new land uses? | No | Not Required | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not Required | 1.5 | Construction works? | No | Not Required | 1.6 | Demolition works? | No | Not Required | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No housing for construction workers envisaged inside the plant boundary. Local people will be engaged. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | New 15 MVA SAF will be installed above ground. Storage capacity of stock yard will be increased. Earth cuttings generated from civil work related to foundation will be used for land leveling | 1.9 | Underground works including mining or tunnelling? | No | Not required | 1.10 | Reclamation works? | No | Not required | 1.11 | Dredging? | No | Not required | 1.12 | Offshore structures? | No | Not required | 1.13 | Production and manufacturing processes? | Yes | Production of Ferro Alloys using Submerged Arc Furnace (SAF). Details are given in PFR | 1.14 | Facilities for storage of goods or materials? | Yes | Existing Facilities will used for Storage of Raw materials & finished product. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | Disposal of Solid waste:
Bag filter dust will be reused and any surplus will be given for road making. Slag will be given for road making. | 1.16 | Facilities for long term housing of operational workers? | No | No residential facility envisaged | 1.17 | New road, rail or sea traffic during construction or operation? | No | No new road & rail network construction required | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | 1.22 | Stream crossings? | No | Not applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Ferro Alloy making using SAF is a dry process. Water is required only for cooling of furnace shell and electrodes.
Permission for 251.5 m3/day water is available from Bokaro Industrial Area – Authority. Existing water consumption is 50 m3/day. Water consumption in the project after expansion will be 100 m3/day. Domestic water consumption will be 10 m3/day (max). | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | No nalla or drain passes through the project site | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | No | Approach road is available | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Trained Manpower is available in Bokaro Steel City | 1.29 | Introduction of alien species? | No | Nil | 1.30 | Loss of native species or genetic diversity? | No | Nil | 1.31 | Any other actions? | No | Nil | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The land is industrial category land | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Permission for 251.5 m3/day water is available from Bokaro Industrial Area – Authority. Existing water consumption is 50 m3/day. Water consumption in the project after expansion will be 100 m3/day. Domestic water consumption will be 10 m3/day (max). | 2.3 | Minerals (MT) | Yes | Manganese ore
Coal /Coke
Dolomite
Quartz | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Shall be purchased from local retailers | 2.5 | Forests and timber (source – MT) | No | Not applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power requirement (Total): 22 MW
Source: Damodar Valley Corporation
DG Sets: 2 x 250 KVA | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Diesel stored in drums for use in DG sets during emergency | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Nil | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Local people will get employment in the project | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Nil | 3.5 | Any other causes | No | Nil | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Commercial wastes will be disposed as per local regulation | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used Oil will be sold to authorized re-processors | 4.4 | Other industrial process wastes | Yes | Slag and dust will be given for road making
Unutilised dust and slag will be stored in scientifically designed dump yard. | 4.5 | Surplus product | No | Nil | 4.6 | Sewage sludge or other sludge from effluent treatment | No | Nil | 4.7 | Construction or demolition wastes | No | Nil | 4.8 | Redundant machinery or equipment | No | Nil | 4.9 | Contaminated soils or other materials | No | Nil | 4.10 | Agricultural wastes | No | N/A | 4.11 | Other solid wastes | No | Nil | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | Nil | 5.2 | Emissions from production processes | Yes | Furnace emission will be collected using suction hood and treated in bag filter. Outlet PM emission will be kept below 50 mg/Nm3. | 5.3 | Emissions from materials handling including storage or transport | Yes | Fugitive dust emission will be controlled using water sprinklers | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive dust emission will be controlled using water sprinklers | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Nil | 5.6 | Emissions from incineration of waste | No | Nil | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Nil | 5.8 | Emissions from any other sources | No | Nil | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Furnace will be operated inside shed | 6.2 | From industrial or similar processes | No | Nil | 6.3 | From construction or demolition | No | Nil | 6.4 | From blasting or piling | No | Nil | 6.5 | From construction or operational traffic | Yes | This being an Industrial area, standards (70 dBA) will be achieved even if there is increase in traffic | 6.6 | From lighting or cooling systems | No | Nil | 6.7 | From any other sources | No | Nil | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Hazardous wastes (Used Oil) shall be sold to registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Toilet waste will be treated in septic tanks and disposed in soak pits | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Bag filters will be provided to control dust pollution. | 7.4 | From any other sources | No | Not applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Nil | 8.2 | From any other causes | No | Nil | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Area falls under Seismic Zone III. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Bokaro is a major steel making city.
Most of the Ferro Alloy produced will get sold locally | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Nil | 9.3 | Set a precedent for later developments | No | Nil | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Bokaro Steel Plant and many other steel units are existing in the area. However, PM from the existing plant will be restricted to 50 mg/Nm3. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Nil | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Protected Forest exists on the 7-8 km area in north side. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Nil | 4 | Inland, coastal, marine or underground waters | Yes | Inland water streams
Damodar River – 7 km, N
Khanjo Nadi – 4.76 km, W
Garga Nadi and Dam – 6 km, S | 5 | State, National boundaries | No | 11-12 km S - West Bengal | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Nil | 7 | Defence installations | No | Nil | 8 | Densely populated or built-up area | Yes | Bokaro Steel City 8 km | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | K.R Public School 1.60 km, SSE
St Mary Public School 1.80 km, S
Government Women Polytechnic Collage 4.35 km, S
Vaishno Mata Mandir 1.0 km, E
Bokaro General Hospital 8.45 km, ESE | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Nil | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Nil | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Nil | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Rakesh | Designation | Director | Name of Company (Applicant Name should not be given here) | SHREE BHOLEY ALLOYS PRIVATE LIMITED | Address | Barwaadda, PO Kalyanpur, Dhanbad |
| |
|