APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Ferro Alloys plant from 11,500 TPA to 37,500 TPA (product mix of Silico manganese, Ferro manganese and Ferro silicon within the allowed capacity) by M/s Shree Bholey Alloys Private Limited
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/JH/IND/75919/2018
Project Cost 2900 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 37,500 TPA ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/JH/IND/75918/2009
MoEFCC file number(Previous EC)J-11011/317/2009-IA II (I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 11500 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectPhase – IV/C- 1 (P) 3 Industrial Area, Village – Goradih/ Balidih, PO: Bokaro Steel City, Dist.- Bokaro Jharkhand-827104.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Phase – IV/C- 1 (P) 3 Industrial Area
Town / VillageVillage – Goradih/ Balidih, PO: Bokaro Steel City, Dist.- Bokaro Jharkhand-827104.
State of the projectJharkhand
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)JharkhandBokaroChas
10.
Nearest railway station along with distance in kms Tupkadih Railway Station, 3.15 km
Nearest airport along with distance in kms Bokaro Airport, 9.40 km
11. Nearest Town/City/District Headquarters along with distance in kms Chas , 11.80 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Gorabalidih
13. Name of the Applicant Rakesh
14. Registered Address Barwaadda, PO Kalyanpur, Dhanbad
15.
Address for correspondance:
Name of the Company SHREE BHOLEY ALLOYS PRIVATE LIMITED
Name of the Applicant Rakesh
Designation (Owner/ Partner/ CEO) Director
Pin code 826004
E-mail shreebholey2018@gmail.com
Telephone No. 120-4044630
Fax No. 120-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No No change in the land use as project falls in industrial area and no additional land is required for the expansion project.
1.2 Clearance of existing land, vegetation and buildings? No Not Required
1.3 Creation of new land uses? No Not Required
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Required
1.5 Construction works? No Not Required
1.6 Demolition works? No Not Required
1.7 Temporary sites used for construction works or housing of construction workers? No No housing for construction workers envisaged inside the plant boundary. Local people will be engaged.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes New 15 MVA SAF will be installed above ground. Storage capacity of stock yard will be increased. Earth cuttings generated from civil work related to foundation will be used for land leveling
1.9 Underground works including mining or tunnelling? No Not required
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Production of Ferro Alloys using Submerged Arc Furnace (SAF). Details are given in PFR
1.14 Facilities for storage of goods or materials? Yes Existing Facilities will used for Storage of Raw materials & finished product.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No Disposal of Solid waste: Bag filter dust will be reused and any surplus will be given for road making. Slag will be given for road making.
1.16 Facilities for long term housing of operational workers? No No residential facility envisaged
1.17 New road, rail or sea traffic during construction or operation? No No new road & rail network construction required
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Ferro Alloy making using SAF is a dry process. Water is required only for cooling of furnace shell and electrodes. Permission for 251.5 m3/day water is available from Bokaro Industrial Area – Authority. Existing water consumption is 50 m3/day. Water consumption in the project after expansion will be 100 m3/day. Domestic water consumption will be 10 m3/day (max).
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No nalla or drain passes through the project site
1.25 Transport of personnel or materials for construction, operation or decommissioning? No Approach road is available
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? No Trained Manpower is available in Bokaro Steel City
1.29 Introduction of alien species? No Nil
1.30 Loss of native species or genetic diversity? No Nil
1.31 Any other actions? No Nil
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is industrial category land
2.2 Water (expected source & competing users) unit: KLD Yes Permission for 251.5 m3/day water is available from Bokaro Industrial Area – Authority. Existing water consumption is 50 m3/day. Water consumption in the project after expansion will be 100 m3/day. Domestic water consumption will be 10 m3/day (max).
2.3 Minerals (MT) Yes Manganese ore Coal /Coke Dolomite Quartz
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Shall be purchased from local retailers
2.5 Forests and timber (source – MT) No Not applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement (Total): 22 MW Source: Damodar Valley Corporation DG Sets: 2 x 250 KVA
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Diesel stored in drums for use in DG sets during emergency
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Nil
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Local people will get employment in the project
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Nil
3.5 Any other causes No Nil
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Commercial wastes will be disposed as per local regulation
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil will be sold to authorized re-processors
4.4 Other industrial process wastes Yes Slag and dust will be given for road making Unutilised dust and slag will be stored in scientifically designed dump yard.
4.5 Surplus product No Nil
4.6 Sewage sludge or other sludge from effluent treatment No Nil
4.7 Construction or demolition wastes No Nil
4.8 Redundant machinery or equipment No Nil
4.9 Contaminated soils or other materials No Nil
4.10 Agricultural wastes No N/A
4.11 Other solid wastes No Nil
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No Nil
5.2 Emissions from production processes Yes Furnace emission will be collected using suction hood and treated in bag filter. Outlet PM emission will be kept below 50 mg/Nm3.
5.3 Emissions from materials handling including storage or transport Yes Fugitive dust emission will be controlled using water sprinklers
5.4 Emissions from construction activities including plant and equipment Yes Fugitive dust emission will be controlled using water sprinklers
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Nil
5.6 Emissions from incineration of waste No Nil
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Nil
5.8 Emissions from any other sources No Nil
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Furnace will be operated inside shed
6.2 From industrial or similar processes No Nil
6.3 From construction or demolition No Nil
6.4 From blasting or piling No Nil
6.5 From construction or operational traffic Yes This being an Industrial area, standards (70 dBA) will be achieved even if there is increase in traffic
6.6 From lighting or cooling systems No Nil
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous wastes (Used Oil) shall be sold to registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Toilet waste will be treated in septic tanks and disposed in soak pits
7.3 By deposition of pollutants emitted to air into the land or into water No Bag filters will be provided to control dust pollution.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Nil
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Area falls under Seismic Zone III.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Bokaro is a major steel making city. Most of the Ferro Alloy produced will get sold locally
9.2 Lead to after-use of the site, which could have an impact on the environment No Nil
9.3 Set a precedent for later developments No Nil
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Bokaro Steel Plant and many other steel units are existing in the area. However, PM from the existing plant will be restricted to 50 mg/Nm3.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Nil
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Protected Forest exists on the 7-8 km area in north side.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil
4 Inland, coastal, marine or underground waters Yes Inland water streams Damodar River – 7 km, N Khanjo Nadi – 4.76 km, W Garga Nadi and Dam – 6 km, S
5 State, National boundaries No 11-12 km S - West Bengal
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil
7 Defence installations No Nil
8 Densely populated or built-up area Yes Bokaro Steel City 8 km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes K.R Public School 1.60 km, SSE St Mary Public School 1.80 km, S Government Women Polytechnic Collage 4.35 km, S Vaishno Mata Mandir 1.0 km, E Bokaro General Hospital 8.45 km, ESE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Nil
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Nil
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantRakesh
DesignationDirector
Name of Company (Applicant Name should not be given here)SHREE BHOLEY ALLOYS PRIVATE LIMITED
AddressBarwaadda, PO Kalyanpur, Dhanbad
Print