APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Expansion of M/s Sundaram Steels Private Limited by enhancement of Sponge Iron production from 54,000 TPA to 174,000 TPA, Installation of 3 x 20 Ton Induction Furnaces with Billet Caster for production of 180,000 TPA Billets, Rolling Mill for production of 174,000 TPA Rolled Products along with 24 MW Captive Power Plant at B-7, Phase-III, Bokaro Industrial Area, Balidih, Bokaro, Jharkhand | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/JH/IND/102711/2019 | Project Cost | 15900 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Sponge Iron (2x200 TPD kiln) – 1,20,000 TPA Billets (3x20T IF & 2-Strand 6/11m Radius CCM) – 1,80,000 TPA WHRB Boiler – 12 MW AFBC Boiler- 12 MW ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/JH/IND/102710/2010 | MoEFCC file number(Previous EC) | J-11011/128/2010-IA-II(I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 10.10 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | B-7, Phase-III, Bokaro Industrial Area, Balidih, Bokaro, Jharkhand | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Plot No. B-7, Bokaro Industrial Area | Town / Village | B-7, Phase-III, Bokaro Industrial Area, Balidih | State of the project | Jharkhand | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Jharkhand | Bokaro | Chas | | 10. | |
Nearest railway station along with distance in kms | Bokaro Steel City, 2 km | Nearest airport along with distance in kms | Birsa Munda Airport, Ranchi, 85 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Bokaro , 2 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Chas District Headquarters
9.6 km in SE | | 13. | Name of the Applicant | Mohit | | 14. | Registered Address | B-7, Phase-III, Bokaro Industrial Area, Balidih, district Bokaro, Jharkhand | | 15. | |
Address for correspondance: | Name of the Company | SUNDARAM STEELS PRIVATE LIMITED | Name of the Applicant | Mohit | Designation (Owner/ Partner/ CEO) | Owner | Pin code | 827014 | E-mail | sundaramsteels2019@gmail.com | Telephone No. | 0654-2253446 | Fax No. | 0654- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | No additional land is required for the proposed expansion project. The project will be executed in vacant land of the existing plant which is already in possession of proponent. No change in land use as the existing land is already developed as industrial area | 1.2 | Clearance of existing land, vegetation and buildings? | No | Not required | 1.3 | Creation of new land uses? | No | The proposed expansion project will be installed in the existing plant premises therefore there will be no new land use creation. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not Required | 1.5 | Construction works? | Yes | Additional civil or Structural works are involved for the installation of additional units. | 1.6 | Demolition works? | No | No Demolition works is required. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | No Temporary sites or Housing of construction workers are required since the construction workers will be sourced from the nearby villages.
Being existing operating plant, provision for rest shelters, drinking water, washroom etc. are already available at site. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | No building, structures or earthworks are required. | 1.9 | Underground works including mining or tunnelling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | Yes | Production process is:
Production TMT Bar by rolling of MS Billets produced in Steel Melting Shop through Induction Furnace and CCM. Coal based DRI Kiln is used for production of Sponge Iron and Captive power Plant comprising of WHRB & AFBC boiler for utilization of waste products. Dolochar from DRI Kiln will be used in AFBC Boiler and utilization of sensible heat of DRI Gases in WHRB for power generation | 1.14 | Facilities for storage of goods or materials? | Yes | Storage facilities are available for the existing plant operation. Additional storage facilities for storage of raw materials and shed for finished products will be created under the expansion | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | The treatment facilities for rolling mill waste water, softening plant back wash and DM Plant waste water shall be installed. DM Treatment & disposal facilities for solid wastes like IF Slag, Bag Filter dust and Mill scale shall be created | 1.16 | Facilities for long term housing of operational workers? | No | Operational workers will be hired from nearby villages. No long term housing for operational workers, proposed. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not Required | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Required | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Required | 1.20 | New or diverted transmission lines or pipelines? | No | Not Required | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | No stream crossing | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Water requirement for the proposed expansion shall be 1480 KLD. Water will be sourced from BIADA through surface pipeline after the proposed expansion | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | No change envisaged. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transportation of material for construction and operations are required. No decommissioning envisaged. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No dismantling or decommissioning works required. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable. | 1.28 | Influx of people to an area in either temporarily or permanently? | No | Additional workforce will be hired from the nearby villages, hence no influx of people, temporary or permanent is expected | 1.29 | Introduction of alien species? | No | None | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity due to the project | 1.31 | Any other actions? | No | No | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | No additional land will be required for the proposed project. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Present water requirement is 90 KLD. Total water requirement after the proposed expansion will be 1570 KLD. Water will be sourced from BIADA through pipeline. | 2.3 | Minerals (MT) | Yes | The details of raw materials required for the project are;
Iron Ore-193,200 TPA, Coal – 157,200 TPA, Dolomite- 4,800 TPA and Ferro Alloys - 3600 TPA. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The construction material used during construction phase of the proposed project will be sourced from the local market | 2.5 | Forests and timber (source – MT) | No | Not Applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Total power requirement after the proposed expansion will be 23 MW. Present power requirement of 1 MW is being met from DVC. Additional Power requirement shall be met from CPP.
Fuel - 100 liters/hr of LDO shall be used for emergency power | 2.7 | Any other natural resources (use appropriate standard units) | No | No other natural resources are used. | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No hazardous substance as per MSIHC Rules will be used | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The proposed project shall improve the living conditions and welfare of the people | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable | 3.5 | Any other causes | No | Nil | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Sewage shall be treated in Septic tank followed by Soak Pits | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | No Hazardous waste shall be generated from the project, except Used Oil, approx. 35 KL per annum and shall be sold to the registered recycler. | 4.4 | Other industrial process wastes | Yes | Fine Iron ore and coal dust – 11000 TPA, Ash- 56000 TPA, Dolochar – 60000 TPA, Coal Fines – 9000 TPA, Bag filter dust- 2400 TPA, IF Slag – 29,600 TPA, Mill Scale & scrap – 6000 TPA.
All the waste generated shall be used / disposed-off suitably. | 4.5 | Surplus product | No | None | 4.6 | Sewage sludge or other sludge from effluent treatment | No | No sludge generation. If any, shall be used as manure. | 4.7 | Construction or demolition wastes | Yes | Minimal quantity of Construction waste will be generated which will be used for landfilling and leveling. | 4.8 | Redundant machinery or equipment | No | No Redundant machinery | 4.9 | Contaminated soils or other materials | No | No contamination of soil or other materials | 4.10 | Agricultural wastes | No | Not Applicable. | 4.11 | Other solid wastes | No | No other solid waste generation | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | No | Emission from Coal based DRI Kilns. Emission from vehicular movement during construction and operational phase.
LDO will be used in DG set during emergency power requirement | 5.2 | Emissions from production processes | No | Primary & Secondary emissions (fugitive) from Induction Furnace | 5.3 | Emissions from materials handling including storage or transport | Yes | Dust emission during transportation and storage, Gases emissions, SO2, NOx & HC during transportation | 5.4 | Emissions from construction activities including plant and equipment | Yes | From construction equipment aided with fossil fuel (diesel) are Cranes, Compressor, Mortar mixing drums etc | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | Dust generation as mentioned above. No odour problems. | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable | 5.8 | Emissions from any other sources | No | Not applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Overall noise level shall be limited to 85 dB(A) | 6.2 | From industrial or similar processes | Yes | Noise will be generated from Rolling Mill, Induction Furnace Exhauster, Compressor, DG Set etc. Suitable measures shall be taken to control the noise at source | 6.3 | From construction or demolition | Yes | Noise due to operation of Cranes, Trucks, Dumpers, Construction machineries etc. The noise generated from the construction activities will be confined to the plant premises. The workers will be provided with suitable PPE’s | 6.4 | From blasting or piling | No | Not Applicable. | 6.5 | From construction or operational traffic | Yes | Overall noise levels shall be limited to 85 dB (A). | 6.6 | From lighting or cooling systems | No | Not applicable | 6.7 | From any other sources | No | No other sources. | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Hazardous wastes (Used Oil) shall be suitably disposed-off through registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | For sewage discharge shall be treated in septic tanks with soak pits. Effluent from Rolling Mill shall be treated in ETP and recycled. Waste water from other sources shall be used in the plant for different purposes after treatment.
Zero Liquid Discharge (ZLD) from the plant. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | State of art pollution control facilities will be installed. Stacks of adequate height will be provided for proper dispersion of pollutants | 7.4 | From any other sources | No | No | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | No long term built-up of pollutants | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not applicable | 8.2 | From any other causes | No | No | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | No such event is known to have occurred in the area. Area falls under Seismic Zone III as per Indian Standard Seismic Zoning Map. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The development of the project does not envisage any impact on supporting facilities like road, power, housing, extractive or supply industries. Supporting facilities are available as it is an operating plant. No additional supporting facilities proposed.
The proposed project will have positive effect and enhance the growth of the region
The industry will provide employment to the locals and likely to improve the socio-economic status of the area | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | No impact on environment is envisaged due to after use of the site | 9.3 | Set a precedent for later developments | Yes | The proposed project will install state of art pollution control measures to reduce pollution and likely to set a precedent for later development using advanced control technologies. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not envisaged | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | None | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | None | 4 | Inland, coastal, marine or underground waters | No | None | 5 | State, National boundaries | No | None | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | None | 7 | Defence installations | No | None | 8 | Densely populated or built-up area | Yes | Bokaro steel City at 2.4 km in SSE direction from plant site | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | All Facilities are available at Bokaro Steel City which is 2.4 km in SSE direction | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | None | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | None | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | None
Area comes under Seismic Zone-III | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Mohit | Designation | Owner | Name of Company (Applicant Name should not be given here) | SUNDARAM STEELS PRIVATE LIMITED | Address | B-7, Phase-III, Bokaro Industrial Area, Balidih, district Bokaro, Jharkhand |
| |
|