APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Mahuda Coal Washery
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/JH/CMIN/81608/2018
Project Cost 1365 lacs
2.
S. No. in the schedule2(a) Coal washeries
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 0.63 MTPY ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 14.2 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the project23°44’31.20” N, 86°09’53.02” E; 23°44’29.42” N, 86°09’58.37” E; 23°44’25.79” N, 86°09’56.23” E; 23°44’25.70” N, 86°09’56.72” E
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.516
Town / VillagePaddugora
State of the projectJharkhand
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)JharkhandDhanbadDhanbad-Cum-Ken-duadih-Cum-Jagta
10.
Nearest railway station along with distance in kms Mohuda, 1.5 km
Nearest airport along with distance in kms Ranchi, 180 km
11. Nearest Town/City/District Headquarters along with distance in kms Dhanbad , 20 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Dhanbad Zila Parishad, Hatia More Dhanbad-826001 Tel. no.-0326-2203178
13. Name of the Applicant Anuj
14. Registered Address Koyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005
15.
Address for correspondance:
Name of the Company BHARAT COKING COAL LIMITED
Name of the Applicant Anuj
Designation (Owner/ Partner/ CEO) PO
Pin code 828305
E-mail anujprasadkaran1960@gmail.com
Telephone No. 326-2236798
Fax No. 326-2230161
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No
1.2 Clearance of existing land, vegetation and buildings? No Land : Total land required is available. Vegetation : There is almost no vegetation except few plants & local shrubs Habitation : Nil
1.3 Creation of new land uses? No Washery is under running condition
1.4 Pre-construction investigations e.g. bore houses, soil testing? No
1.5 Construction works? No
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? No
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes Dry separation( as per quality of coal) & Wet processing of coal with closed water circuit system
1.14 Facilities for storage of goods or materials? Yes Raw coal stored in Raw Coal Bunker. Clean Coal stored in clean coal bunker. Middling/washed coal power stored in middling yard
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid waste i.e. Hand Pick Rejects (HPR) generated 0.5% of raw coal feel which is dumped nearby area inside the premises The wet processing of coal in the washery is based on closed water circuit system. The water fed into the system is collected after use and re-circulated and no effluent is allowed to escape into the natural drainage system or outside premises
1.16 Facilities for long term housing of operational workers? Yes The residential and welfare facilities for BCCL personnel has already been given
1.17 New road, rail or sea traffic during construction or operation? No No alteration of existing routes is proposed.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No No alteration of existing system
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? No In Mohuda Washery mine water is used as makeup water and used for sprinklers to control dust pollution
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? No
1.26 Long-term dismantling or decommissioning or restoration works? Yes The closure activities form an integral part of washery plan. The residential quarters along with dispensary, sub-stations, pump house, filtration plant for providing basic amenities to workers will be maintained till the employees are required to stay. Service buildings namely, coal handling arrangement, washery, workshop, stores, office building etc will be demolished, if redundant, after washery closure and all useable items will be shifted to area store.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes Solid waste generated during demolition of service and residential buildings after cessation of industrial activity will have an impact on the environment. Care will be taken to dump the solid waste in the nearby area inside the premises.
1.28 Influx of people to an area in either temporarily or permanently? Yes Both type of workers employed i.e. permanent and temporarily worker are working Mohuda Coal washery. This will continue throughout the life of the washery.
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Approximately 14.2 Ha of land for the washery has already been under possession of BCCL.
2.2 Water (expected source & competing users) unit: KLD Yes The water requirement of approx. 54 KLD used as a makeup water and for control of air pollution.
2.3 Minerals (MT) Yes Magnetite in washing process. Approx. 3.8 kg per tonne feed of raw coal.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The electrical power supply at 11 KV from Madhuban Sub- Station via. Murulidih 20/21 Pit. The maximum electrical demand for the washery is 1MVA. This network is exclusively for use of BCCL and there are no competing users.
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Scholarships provided to under-priviledged students in nearby schools time to time. Dispensary of mahuda washery is there for serving nearby people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes Solid waster i.e. Hand Pick Rejects (HPR) generated 0.5% of raw coal feel. The reject have ash content of more than 90% and is dumped in nearby area inside the premises.
4.2 Municipal waste (domestic and or commercial wastes) Yes There are soak pits and septic tanks in the colony of Mohuda washery where solid waste is being treated. There is no commercial waste generated.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Burnt oil is expected to be generated. These shall be recycled through authorized recycling agents.
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment No
4.7 Construction or demolition wastes No
4.8 Redundant machinery or equipment Yes Old equipment and machinery will become redundant after the end of useful life and will be surveyed off and sold as scrap as per norms
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No
5.2 Emissions from production processes Yes During processing process coal dust is generated which will be suppressed by sprinkling of water
5.3 Emissions from materials handling including storage or transport Yes During transportation of coal from belt conveyor, dumper or during crushing of coal, fine dust generated which is suppressed by water sprinkling. 50 Nos. of automatic water sprinkles are installed around the washery plant
5.4 Emissions from construction activities including plant and equipment No
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust will be generated during handling of coal which will be taken care by sprinkling water.
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise is generated during coal loading, unloading, crushing, handling and transportation. However, the ambient noise level at different locations inside washery premises is not likely to exceed the permissible limit for industrial area. However ear plug have been provided to the workers working near crusher/ screens
6.2 From industrial or similar processes Yes Noise is generated during coal processing due to operation of pumps, screens, belt conveyors etc. Proper maintenance with suitable packing, liners etc will keep the equipment minimum noise generating. As such, the ambient noise level at different locations inside washery premises is not likely to exceed the permissible limit for industrial area.
6.3 From construction or demolition No
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes Noise will be generated due to coal transportation. The level will be measured through regular monitoring and will be brought within permissible limits with control measures.
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No
7.3 By deposition of pollutants emitted to air into the land or into water Yes Control measures like spraying at all dust generating points is adopted. In view of this, fugitive dust emission into air is insignificant.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No
8.2 From any other causes Yes The different dynamic operations inside the washey may cause industrial hazards. All standard safety precautions shall be followed while the plant is in operation.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The area under study falls in Zone-III, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficient in horizontal and vertical directions respectively. There are no chances of flood and landslide.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Socio-economic growth associated with washery activity will lead to semi-urbanisation. This supports development of ancillaries and other related activities. Roads, power supply, water supply & water treatment plant & other community development. Ancillary & supply industries may develop, which will in turn generate employment indirectly & need to growth in the income generation.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes After use of Community development like health care facility & self employment scheme will improve the Environment and quality of life.
9.3 Set a precedent for later developments Yes The proposed washery infrastructure may be used in future also by other nearby projects. As such, the likelihood of precedence for later developments cannot be ruled out. Activities at 9.1 & 9.2 above will lead to over all socio economic growth of the area. Socio-economic benefits of the Project will accrue to local population also.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes As indicated at 9.1, 9.2 and 9.3 along with other activities like power generation etc can not be ruled out. This could lead to cumulative impact on environment.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes PROTECTED FOREST 12.5 KM (NW) BRINDABANPUR PF 8KM(S) MAYRAKULI RF 11KM(SSW) TOPCHACHI RF 13KM(NE)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes DAMODA RIVER 2.75KM (S) KATRI RIVER 2KM (E) GARGA NADI 8.75 (SW) KHUDIA NALA 2KM (NE) JAMUNIA RIVER 9.5KM (W) IJRI RIVER 12.5KM (S)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries Yes No state/National Boundary
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes SOUTH-EASTER RAILWAY 0 KM EASTERN RAILWAY 6 KM MAHUDA RAILWAY STATION 1.5 KM NH-32 1 KM
7 Defence installations No
8 Densely populated or built-up area Yes BAGHMARA 9 KM (NW) JHARIA 14 KM (E) BHAUMRA 13.5 KM (SE)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospital, School, place of worship, community facility are all in general in the above town
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
5Uploaded Approval of mining PlanN/A
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThere seems no justification/rationale for admissibility of the proposal for regularization of the said EC. 21 Nov 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantAnuj
DesignationPO
Name of Company (Applicant Name should not be given here)BHARAT COKING COAL LIMITED
AddressKoyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005