APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Madhuban Coal Washery
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/JH/CMIN/81595/2018
Project Cost 271.68 lacs
2.
S. No. in the schedule2(a) Coal washeries
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 2.5 MTPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0.68 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectDomcholkaro
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.168
Town / VillageDomchalkaro
State of the projectJharkhand
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)JharkhandDhanbadBaghmara-Cum-Katras
10.
Nearest railway station along with distance in kms Khanudih, 1 km
Nearest airport along with distance in kms Ranchi, 271 km
11. Nearest Town/City/District Headquarters along with distance in kms DHANBAD , 40 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Domchalkaro Dist Dhanbad
13. Name of the Applicant Shreebhagwan
14. Registered Address Koyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005
15.
Address for correspondance:
Name of the Company BHARAT COKING COAL LIMITED
Name of the Applicant Shreebhagwan
Designation (Owner/ Partner/ CEO) PO
Pin code 828307
E-mail pomadhubanoffice@gmail.com
Telephone No. 326-2236798
Fax No. 326-2230161
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No No change in land we since the proposal is for an existing project over Leasehold area of 112.75 ha
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Existing Project
1.5 Construction works? No No new construction regarded as it is an existing project
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? No Existing Project
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No
1.9 Underground works including mining or tunnelling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? Yes Wet processing of coal beneficiation with closed water circuit system
1.14 Facilities for storage of goods or materials? Yes Bunkers, silo & stores
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Scrap materials , Burnt oil, Scrap batteries are sent to regional store , Block II Area.
1.16 Facilities for long term housing of operational workers? Yes Quarter are provided by BCCL
1.17 New road, rail or sea traffic during construction or operation? No
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water is abstracted from mine discharge of Jamunia OCP & Block II OCP
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? No
1.26 Long-term dismantling or decommissioning or restoration works? No Service building namely local handling arrangements washery, workshop etc. Will be demolished if redundant after washery closure& all useable items will be shifted to Area stores.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? No
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Existing Project
2.2 Water (expected source & competing users) unit: KLD Yes 1.5 KL/Ton of Raw coal
2.3 Minerals (MT) No Existing coal washery of 2.5 MT/Yr capacity
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Existing Project
2.5 Forests and timber (source – MT) No
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 342516 kwh/Month Source: From Chandrapura thermal power station.
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Slurry, Coal dust
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? No
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) No
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Old scrapped batteries are sent to regional registered store, Block II
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes Slurry ponds sludge for final efftnent treatment
4.7 Construction or demolition wastes No
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials Yes Pucca pond are build for storage of slurry
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No
5.2 Emissions from production processes Yes SOX , NOX, PM2.5, PM10
5.3 Emissions from materials handling including storage or transport Yes Coal Dust
5.4 Emissions from construction activities including plant and equipment No
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Coal Dust
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise is generated during raw coal unloading, crushing , reclaiming , transportation of coal.
6.2 From industrial or similar processes Yes Noise is generated during loading& unloading by pay-loader & washing process in plant.
6.3 From construction or demolition No
6.4 From blasting or piling No
6.5 From construction or operational traffic No
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Qty of used oil, rejected batteries in a year expected & their measure for prevention of spilage , handling.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Through close water circuit no effluent is going outside.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Water sprinklers and mobile tankers are used for setting of coal dust.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No
8.2 From any other causes No The various operation inside the washery may cause industrial hazards. Standard safety precautions are taken to avoid the industrial hazards during washing operation.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Socio economic growth associated with washery activity will lead to semi-urbanisation. this supports development of ancillaries and other related activities. Roads power supply , water supply and water treatment plant and other community development. Ancilllaries and supply industries may devlope which will inturn generate employement indirectly and need to growth in the income generation.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes After use community development like health facilities and self employment scheme will improve the environment and quality of light.
9.3 Set a precedent for later developments Yes The washery infrastructure may be used in future also by other nearby projects.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes As indicated 9.1, 9.2, and 9.3 along the other activities like power generation etc cannot be ruled out this could lead to cumulative impact on environment.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Jamunia River 2 km from washery building.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No Not applicable
8 Densely populated or built-up area Yes Within 5 Km.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Regional hospital, 3.5 Km from the washery
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Semi arid
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
5Uploaded Approval of mining PlanN/A
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThere seems no justification/rationale for admissibility of the proposal for re-validation of the EC dated 31/1/1987. 21 Nov 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantShreebhagwan
DesignationPO
Name of Company (Applicant Name should not be given here)BHARAT COKING COAL LIMITED
AddressKoyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005