APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Approval of Terms of Reference for Proposed Mixed landuse Project under TOD Policy (70% Residential + 30% Commercial) on land measuring 166.69 acres in Revenue Estate of village-Chauma, Sector-111, Gurugram, Haryana | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/HR/NCP/85242/2018 | Project Cost | 927800 lacs | |
| 2. | |
S. No. in the schedule | 8(b) Townships and Area Development projects.
| Project Sector | INFRA-1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | ... ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | .... ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | in Revenue Estate of village-Chauma, Sector-111, Gurugram, Haryana | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | ... | Town / Village | village-Chauma, | State of the project | Haryana | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Haryana | Gurgaon | Gurgaon | | 10. | |
Nearest railway station along with distance in kms | Gurgaon Railway Station, 4.11 km | Nearest airport along with distance in kms | Indira Gandhi International Airport, 5.59 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Gurugram , .. km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Gurugram | | 13. | Name of the Applicant | Satya | | 14. | Registered Address | GF 1, Vipul Plaza, Village Haiderpur, Sector 54, Gurgaon | | 15. | |
Address for correspondance: | Name of the Company | M/S MASK REALCON PVT. LTD. | Name of the Applicant | Satya | Designation (Owner/ Partner/ CEO) | Manager | Pin code | 122002 | E-mail | maskrealconeia@gmail.com | Telephone No. | 011-27571410 | Fax No. | 011- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Proposed development is as per the provision of Gurugram Manesar Urban Complex 2031 | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Tree survey of entire area is ongoing and the outcome of the survey will decide if any tree needs to be relocated/cut. | 1.3 | Creation of new land uses? | No | No new land use is proposed. The proposed site is for Mixed Landuse development as per master plan. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Geotechnical Soil investigation has been carried out. | 1.5 | Construction works? | Yes | The major construction works are given below:
Site Development
Road Development
• Internal roads
Utilities/Services
• Water Supply
• Sewerage
• Drainage
• Rain Water Harvesting Structures and Pits
• Power supply and back up facility,
Buildings
• Residential Block
• Club
• Commercial (Retail)
• Basement for parking & services
• EWS, Club,
• Commercial
• Offices, community facilities | 1.6 | Demolition works? | No | Demolition work is not involved in the project, as the site has no existing building or constructed area. | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Mostly, local labors will be employed. However temporary labour camps will be established for labourers and a dormitory for the site supervisors during the construction stage. All the construction activities including storage of raw materials will be confined to the storage spaces earmarked on project site only. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Above ground building structures will include building for Proposed Project.
The earthwork is involved for foundation and laying of underground services etc. Excavated soil will be used for site leveling, back filling/filling and road construction. Top 200 mm layer of soil will be separately stored and used for landscaping/ horticulture development work. | 1.9 | Underground works including mining or tunnelling? | Yes | Underground works includes excavation of earth for construction of foundation, water storage tank and STP. | 1.10 | Reclamation works? | No | Not involved. | 1.11 | Dredging? | No | Not involved. | 1.12 | Offshore structures? | No | Not involved. | 1.13 | Production and manufacturing processes? | No | This is a development of Mixed Landuse project hence, no production or manufacturing activities will be involved. | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary storage facilities will be created during construction phase for storage of construction materials. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid Waste
Construction Stage :
During construction stage generated solid waste will comprise mainly of construction waste. The construction waste will be reused within the site for various constructions filling work.
In addition to that there will be generation of small quantity of municipal waste (195 Kg/Day) from approx. 800 construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins.
Operation Stage:
Solid waste generation | 1.16 | Facilities for long term housing of operational workers? | No | Not applicable | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not applicable | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | 1.22 | Stream crossings? | No | Not applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No ground water will be extracted during the construction of the project. Water will be sourced through tanker supplies and treated water will be used after testing and confirmation of fitness for construction.
During operation phase, water will be supplied by HUDA. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | Surface drainage may affect due to construction of the project.
By considering run off prior to development & run off after development there is some increment in storm water runoff. However runoff generated from the project site during monsoon season will be used to recharge ground aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff.
Terrace as well as surface runoff will be recharged to ground. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours.
Parking will be provided on surface & basement in operation phase. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Construction phase –
Temporary influx of 800 people from the nearby areas is expected.
Operation phase – 190694 persons | 1.29 | Introduction of alien species? | No | Not applicable | 1.30 | Loss of native species or genetic diversity? | No | Not applicable | 1.31 | Any other actions? | No | None | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The proposed project site has been designated for Mixed land use development. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water requirement during construction phase will be met through tanker water supply from nearby STP.
During operation phase fresh water demand will be met from Haryana Urban Development Authority (HUDA). Treated water demand for flushing, gardening, and DG Set cooling shall be met from treated water from STP installed at Site. | 2.3 | Minerals (MT) | No | Not applicable | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials such as Cement, Steel, Bricks, Stone aggregates, and Sand would be required for the project. These will be preferably procured from local reputed licensed vendors. | 2.5 | Forests and timber (source – MT) | No | Limited use of timber will be done and it will be restricted to selected locations. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Power for the proposed project will be supplied by Dakshin Haryana Bijli Vitran Nigam Limited (DHBVNL). Maximum power Demand for the proposed project is 163363 KW. DG sets 158825 KVA will be used as power backup during power failure. HSD (ultra low sulphur variety as per availability) fuel will be used for DG sets. | 2.7 | Any other natural resources (use appropriate standard units) | No | -- | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not applicable. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not applicable. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not applicable. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable. | 3.5 | Any other causes | No | Not applicable. | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Top soil, generated during earth excavation, will be stacked, covered and preserved for reuse. Top layer of the soil will be used in horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Construction Phase:
Municipal solid waste – 195 kg/day
Operation Phase:
Municipal solid wastes – 55.45 TPD
The solid waste includes paper, card board, plastic cans etc. and kitchen wastes from houses. Recyclable wastes like card boards and plastic cans will be sold to vendors. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Waste oil 189.28 Lts on daily basis from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recyclers authorized by CPCB/SPCB.
Suitable care will be taken so as to prevent spills/ leaks of used oil from storage. | 4.4 | Other industrial process wastes | No | Not applicable | 4.5 | Surplus product | No | Not applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Dried sludge from the STP will be used as manure for horticulture development. Surplus manure will be sold to end users: farmers/Nursery. | 4.7 | Construction or demolition wastes | Yes | Demolition work is not involved.
Construction Work: Excavated soil will be used for back filling. Other construction waste like bricks, concrete etc will be used in sunder/ road works/ manholes etc. Gunny bags, cardboards will be sent to authorize recycler. The inert waste will be sent to land fill site. | 4.8 | Redundant machinery or equipment | No | Not applicable | 4.9 | Contaminated soils or other materials | No | Not applicable | 4.10 | Agricultural wastes | No | Not applicable | 4.11 | Other solid wastes | No | Not applicable | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emission will be from
? Stationary Sources: DG sets of 158825 KVA
? Mobile Sources: Vehicular emissions
CPCB approved DG sets with acoustic canopy will be used only during power failure. | 5.2 | Emissions from production processes | No | Not applicable | 5.3 | Emissions from materials handling including storage or transport | No | Fugitive dust emission due to handling and loading - unloading activities is envisaged during construction. Frequent water sprinkling will be done to minimize the fugitive emissions. | 5.4 | Emissions from construction activities including plant and equipment | Yes | During the construction phase, major emission will be in the form of fugitive dust, use of DG sets and transportation of construction material. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase:
• RMC use will reduce the handling of cement, sand and concrete thus dust emission will be minimized.
• Tarpaulins will be used to cover trucks carrying debris.
• Water sprinkling will be practiced at regular intervals to reduce dust emissions.
• Dust is likely to be generated during operation phase due to movement of vehicles and blowing of ai | 5.6 | Emissions from incineration of waste | No | Not applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Burning of any substances including biomass, slash materials and/ or construction debris will be prohibited | 5.8 | Emissions from any other sources | No | Nil | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets and traffic. The indicated noise levels from certain construction plants/equipment are indicated below:
? Concrete Mixer - 85 dBA
? Generator - 95 dBA
? Pumps - 90 - 95 dBA
? Trucks - 85 – 90 dBA
For control of noise following measures shall be adopted:
• Properly maintained equipment with mufflers will be used.
• High noise generatin | 6.2 | From industrial or similar processes | No | Not applicable | 6.3 | From construction or demolition | Yes | Noise Pollution Control: Noise pollution will be due to operation of machinery as well as transportation vehicles. As there is no habitation in nearby area hence there will be negligible impact. However following precautions shall be taken to control noise pollution :
High noise generating construction activities would be carried out only during day time.
Installation, use and maintenance of mufflers on equipment.
Workers working near high noise construction machinery would be supplied | 6.4 | From blasting or piling | No | Blasting & piling work is not involved in the project. | 6.5 | From construction or operational traffic | Yes | Construction Phase:
Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code.
Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.
Operation Phase: Parking is provided on surface & basement.
Vehicular movement is restricted to roads and parking areas. Provision of soft green peripheral road side | 6.6 | From lighting or cooling systems | No | Nil | 6.7 | From any other sources | No | Nil | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | The waste oil generated during operation phase from the DG sets will be collected and separately stored in HDPE drums over concrete floor within the premises before final disposal. All precautionary steps will be taken to avoid spillage It will be directly transferred to authorized recyclers. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Generated Sewage from the project will be treated in the STP proposed onsite, and recycled within the proposed project facility for gardening, flushing & DG cooling. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Dust generation during construction phase from earthworks and movement of vehicles is a temporary phenomenon and will have short term impact during construction phase.
Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts.
DG exhaust will be discharged at height stipulated by CPCB. | 7.4 | From any other sources | No | Nil | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | No. | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | During construction phase, no such risk is anticipated. However, the contractors shall comply with the safety procedures, norms and guidelines as applicable) mentioned in the National Building Code of India and Bureau of Indian Standards.
During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard. | 8.2 | From any other causes | No | Nil | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | Gurgaon district has no history of natural disasters such as Floods, landslides, cloudburst etc.
The site lies in Seismic Zone IV. The construction will be carried out as per the guidelines prescribed for Seismic Zone IV.
All the civil structures will be seismically resistant and designed in accordance with provisions recommended related IS codes:
IS 4326: 1993
IS 1893 (Part I),2002 | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The project will be equipped with dedicated internal road, parking, internal water distribution system, fire fighting system, internal sewage collection network, lighting facilities, solar lighting, and power backup facility.
Increase in water and power demand | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | No | 9.3 | Set a precedent for later developments | Yes | This is a Mixed Landuse development; there will be generation of employment during construction & operation phase. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Sultanpur Bird Sanctuary, 14.12 km/SW
Aravali Bio-Diversity Park, 13.66 km/NE
Central Ridge Forest, 14.91 km/NE | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Najafgarh Drain, 2.34 km/NW | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Sultanpur Bird Sanctuary, 14.12 km/SW | 4 | Inland, coastal, marine or underground waters | No | Not located within 15 km of the proposed project location. | 5 | State, National boundaries | Yes | Delhi Haryana border is at 0.17 km, North- East from the project site
. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | NH-8 approx. 6.54 KM in E direction
NH-236 approx. 7.08 KM in SE direction
SH-13 approx. 8.80 KM in S direction
SH-15 approx. 7.47 KM in S direction | 7 | Defence installations | Yes | CRPF Camp, Jharoda Kalan approx. 13.51 KM in NW direction
BSF Chawla Camp, 3.56 km/NW
Air Force Station, Sohna Road, 9.29 km/S | 8 | Densely populated or built-up area | Yes | Density of surrounding development is as per master plan. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Manmade community facilities such as, schools, places of worship are planned but are not close to the site. These installations will not have any impact due to construction of proposed project. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Ground water resource in Gurgaon is depleting at very fast rate. The region is declared as a region of scarce ground water resource region. | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Nothing specific | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The project is located at Seismic Zone-IV according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as per code.
There are no possibilities of the proposed project site getting flooded and landslides as per available records. | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Satya | Designation | Manager | Name of Company (Applicant Name should not be given here) | M/S MASK REALCON PVT. LTD. | Address | GF 1, Vipul Plaza, Village Haiderpur, Sector 54, Gurgaon |
| |
|