APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s TECHNICAL GRADE PESTICIDES MANUFACTURING UNIT
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/HR/IND2/92940/2019
Project Cost 2000 lacs
2.
S. No. in the schedule5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Project Sector Industrial Projects - 2
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 6480 TPA consisting of 3360 TPA Technical Grade Pesticides (Herbicides- 1200 TPA, Fungicides- 420 TPA, Insecticides- 1200 TPA, Other pesticides- 540 TPA) & 3120 TPA Pesticide Intermediates ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 0 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectKilla no. 12 KA 3/1, 3/2, 8/2, Industrial Sector-29, Sonepat
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Killa no. 12 KA 3/1, 3/2, 8/2, Industrial Sector-29
Town / VillageVillage Joshi Jat`
State of the projectHaryana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)HaryanaSonipatSonipat
10.
Nearest railway station along with distance in kms Harsana Kalan Railway Station, 5.47 km
Nearest airport along with distance in kms Indira Gandhi International Airport, 45.74 km
11. Nearest Town/City/District Headquarters along with distance in kms Sonepat , 0.1 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Municipal Corporation of Sonipat Address- Railway Road, Indira Colony, Near PWD Rest house, Sonipat, Haryana 131001
13. Name of the Applicant Shambhu
14. Registered Address E- 17, 18, DSIDC Industrial Complex, New Delhi
15.
Address for correspondance:
Name of the Company BHARAT PRODUCTS LIMITED
Name of the Applicant Shambhu
Designation (Owner/ Partner/ CEO) CEO
Pin code 110041
E-mail agro@bpl.net.in
Telephone No. 11-47003312
Fax No. 11-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The change in land use has already been granted for the total site from DTCP vide memo no. ST-2293-PA(B)-2015/9010 dated 01.10.2015 for a total plot area of the project site is 15,246.86 m2 out of which 7,246.86 m2 has been used to make pet bottles. Rest 8000 m2 of land will be developed into Pesticide manufacturing industrial unit for the proposed project.
1.2 Clearance of existing land, vegetation and buildings? Yes Presently, the proposed 8000 m2 land is a vacant land with few herbs, shrubs & bushes; which shall be cleared before installation of the project.
1.3 Creation of new land uses? Yes Presently, the land is a vacant land for industrial land use. The change in land use has already been done. The land shall be developed into well-equipped Pesticide manufacturing facility. Hence, new land use will be created.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not required
1.5 Construction works? Yes Construction work will be done as per the requirement of proposed project.
1.6 Demolition works? No Not Required
1.7 Temporary sites used for construction works or housing of construction workers? No The workers will be available from nearby local areas during the construction phase, thus there will be no need of housing for workers.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes It will be as per the plant design.
1.9 Underground works including mining or tunnelling? Yes Underground works maybe required for UG storage tanks & foundation work for sheds, Lab, office building etc. if necessary
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Industry will manufacture herbicides, fungicides, insecticides, pesticides intermediates. Details are given in Pre-feasibility Report.
1.14 Facilities for storage of goods or materials? Yes All Solids (Raw Materials) will be stored in warehouse and taken to manufacturing area in closed containers. All the liquid (Raw Materials) will be stored in leak proof MS/SS/PP/FRP tanks at a secured and contained location with proper safety measures. Storage of all chemicals shall not exceed their threshold limit, wherever threshold is exceeded. Clearance shall be as per obtained taken as MSIHC Rules, 1989.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Municipal solid waste: Total 15 kg/day Municipal solid waste will be generated out of which 6 kg/day of Bio-Degradable waste will be given to authorized vendor, Recyclable Waste of 9 kg/day shall be given to Authorized Recycler. Hazardous Wastes shall be generated from the process and shall be disposed to approved TSDF site. Industrial effluent & domestic waste water will be treated in ETP followed by RO- 3 stage & MEE.
1.16 Facilities for long term housing of operational workers? No The workers will be available from nearby local areas thus there will be no need of housing for staff.
1.17 New road, rail or sea traffic during construction or operation? No Existing transportation facilities will be used.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing and proposed routes will be used for transportation.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No such closure or diversion of existing transport is required.
1.20 New or diverted transmission lines or pipelines? No No new or diversion of transmission lines or pipelines will be done.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? No No abstraction of water from ground or surface water source. Water supplied by HUDA supply.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Surrounding water bodies and land surface will not be affected due to proposed project. Sewage & Industrial effluent will be treated in the Effluent Treatment Plant followed by RO & MEE. It will be a zero discharge complex.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes All raw materials will be transported using road trucks from various parts of India and imported raw materials will be transported using ship and then road trucks. All the finished products will be transported using road trucks to various parts of India and ship for exports.
1.26 Long-term dismantling or decommissioning or restoration works? Yes Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes There will be temporary influx of 50 nos. per day of labor during installation phase. During operational phase, there will be influx of approx. 100 people including management, staff & workers.
1.29 Introduction of alien species? No There is no alien species at the proposed site.
1.30 Loss of native species or genetic diversity? No No loss of native species or genetic diversity.
1.31 Any other actions? No No additional action will be implemented.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Change of land use has already been granted for the total site from DTCP vide memo no. ST-2293-PA(B)-2015/9010 dated 01.10.2015. Land use of 8000 m2 has already been changed from agricultural to Industrial use for Pesticide Manufacturing Unit. The copy of Change in Land use is enclosed in enclosure- VI
2.2 Water (expected source & competing users) unit: KLD Yes Source of Water: HUDA Water Supply. Total water required will be 157 KLD out of which 94 KLD will be treated water and 63 KLD will be fresh water.
2.3 Minerals (MT) Yes Iron, Steel, Aluminium and Glass etc. will be used for construction as per the requirements & shall be bought from local market.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Cement, stone, steel etc. will be used for construction activities as per the requirements & shall be bought from local market.
2.5 Forests and timber (source – MT) Yes No forest products will be used for construction work as well as during the operational phase. Timber may be used for office furniture only.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Electricity- 500 KVA Source: UHBVN DG set- 1 x 400 KVA Fuel: 2 TPH Coal for Boiler Low Sulphur Diesel for DG sets Natural Gas for Incinerator
2.7 Any other natural resources (use appropriate standard units) No None
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Storage of all chemicals shall not exceed their threshold limit, wherever threshold is exceeded Clearance shall be as per obtained taken as MSIHC Rules, 1989. Details of material to be used and their threshold limit has been given in pre-feasibility report.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures shall be adopted. This restricts stagnation of water or accumulation of water. No occurrence of diseases is anticipated.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project affects the nearby people in positive ways through employment generation.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No No vulnerable group of people will be affected by the project.
3.5 Any other causes No None
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Total 15 kg/day Municipal solid waste will be generated out of which 6 kg/day of Bio-Degradable waste will be given to authorized vendor, Recyclable Waste of 9 kg/day shall be given to Authorized Recycler.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous Wastes generated from the processes and manufacturing operations shall be disposed to approved TSDF facility. 200 kg/month of ETP sludge & 100 Kg/month MEE sludge shall be generated which shall be disposed to TSDF site.
4.4 Other industrial process wastes Yes Industrial non-hazardous process wastes and residues shall be treated and disposed off through in-house mini incinerator.
4.5 Surplus product Yes Only in extenuating circumstances; Off specification production/ excess product etc. shall be incinerated or disposed as hazardous waste as the case maybe.
4.6 Sewage sludge or other sludge from effluent treatment Yes 200 kg/month of ETP sludge & 100 Kg/month MEE sludge shall be generated which shall be disposed to TSDF site.
4.7 Construction or demolition wastes No Not required
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No No other types of solid wastes will be generated.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes • Boiler: Use of Coal based steam Boiler of 2 TPH. 30 m chimney shall be provided with cyclone dust collector followed by Bag House Filter to this pollution source. • Incinerator: Incinerator shall be provided with wet scrubber with adequate stack • Process Reactors: Process reactor shall be channelized and provided with wet scrubber and also the stack shall be provided • DG sets: HSD in DG sets (400 KVA). DG sets will be kept provided with proper stack height as per CPCB norms.
5.2 Emissions from production processes Yes Flue gases shall be generated in the production processes of different products and by-product which contains Hydrogen Sulfide (H2S), Hydrochloric acid (HCl), Sulphur Dioxide (SO2) and Total Particulate Matter (TPM). For control of emissions from various processes, Air Pollution Control Devices shall be installed based upon pollution load and suitability with contaminant.
5.3 Emissions from materials handling including storage or transport No Not applicable
5.4 Emissions from construction activities including plant and equipment Yes Dust is likely to be generated from materials handling including transportation. Water sprinkling will be used for dust suppression.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes There will be generation of particulate matters due to construction activities. However, care will be taken to make it minimum. Domestic waste water along with effluent will be treated in effluent treatment plant and ventilation shall be provided to ensure minimum malodour. Plant manufacturing area will be neat and clean. All the reactions will be carried out in closed vessels.
5.6 Emissions from incineration of waste No None
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No None
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise pollution from the plant will be pumps & motors, machineries, cooling tower, DG set etc. Adequate sound enclosures will be provided to all equipments and machineries generating high noise & ear protecting devices will be provided to the workers working in areas where noise levels will be high. Greenbelt will be developed to abate the noise levels.
6.2 From industrial or similar processes Yes Sources of noise pollution from the plant will be pumps & motors, machineries, cooling tower, D.G. Set etc. Adequate sound enclosure shall be provided where noise will be high.
6.3 From construction or demolition Yes Noise generated from the construction activities will be mitigated by use of adequate PPE and noise barriers shall be proposed if required.
6.4 From blasting or piling No No blasting or piling will be done.
6.5 From construction or operational traffic Yes Noise will be generated from vehicular movement in the installation/construction and operational phase & will be within permissible limit. Green belt developed at the periphery of the project site will act as barrier to noise.
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Industry will provide adequate storage area for the safe storage of products, raw materials and hazardous chemicals. Proper care shall be taken to avoid any spillage. Proper care for handling of hazardous material will be taken as per the MSIHC rules & Hazardous Waste management Rules, 2016.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Sewage & generated effluent will be treated in Effluent Treatment Plant & it will be a ZLD unit.
7.3 By deposition of pollutants emitted to air into the land or into water No No major impact is anticipated by deposition of pollutants emitted to air, into the land or into water due to all the necessary air pollution control measures to be adopted for controlling the air pollution within the norms specified by Central/State Pollution Control Board.
7.4 From any other sources No None
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No major impact is anticipated due to fact that all necessary steps will be provided to control air pollution, water pollution and noise levels within the Central/State Pollution Control Board Norms.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes During the construction work, no hazardous substances will be used, handled and stored. Therefore, no risk of accidents is anticipated due to hazardous substances. During operation phase, Industry will carry out a detailed risk assessment study/ disaster management plan and all recommended safety measures will be incorporated in the plant.
8.2 From any other causes No None
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes May effect by earthquakes because industry will be located in seismic zone-IV.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes No impact on the surrounding environment is envisaged due to following facts: • Existing roads and transportation facilities will be utilized. • Power demand will be met through Uttar Haryana Bijli Vitran Nigam (UHBVH). • Industrial wastewater will be treated in our ETP and it will be a ZLD unit. • housing development- Not Applicable • extractive industries- Not Applicable • supply industries- Not Applicable • other- Not Applicable
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes Yes, it will set a precedent for later developments
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Old Mughal Kos Minars, Baiyanpur- 5.41 km SWW Old Mughal Kos Minars, Sonipat- 7.23 km NW Old Mughal Kos Minars, Akbarpur-Barota- 8.31 km SSW Tomb of Khawaja Khizr, Sonipat- 8.34 km NW Old Mughal Kos Minars, Jawahri- 10.37 km NNW Old Mughal Kos Minars, Rajpur- 13.80 km NNW
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Water Bodies 1 L Minor- 1.85 km E Rajpur Distributary- 1.93 km W Harsana Distributary- 3.82 km SW Main Drain No. 6- 4.50 km W East Juan Drain- 5.10 km SW Drain No.8- 6.56 km S Nahri Major Distributary- 8.56 km SSW Rohat Drain- 9.43 km SWW Yamuna River- 9.68 km NE Western Yamuna Canal (Delhi Branch)- 1071 km SW Fatehpur Distributary- 10.77 km SW Kakroi Distributary- 10.80 km SWW Mandaura Drain- 13.29 km SW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters No None
5 State, National boundaries Yes Delhi Boundary- 9.47 km SSW Uttar Pradesh Boundary- 10.47 km E
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Roads/Highway NH-1- 0.24 m E HS-11- 0.64 km SWW Railway Station Harsana Kalan Railway Station- 5.47 km SWW Indira Gandhi International Airport Delhi- 45.74 km S
7 Defence installations No None
8 Densely populated or built-up area Yes Bahalgarh - 0.65 km S
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospital near Project Area- 0.58 km W Post Office near Lawanspur- 1.23 km SSE Temple near Lawanspur - 0.87 km SSE Rukmini Devi Public School near Sec.-7 Sonipat- 1.55 km N
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Old Mughal KosMinars, Baiyanpur- 5.41 km SWW Old Mughal Kos Minar, Sonipat- 7.23 km NW Old Mughal Kos Minar, Akbarpur-Barota- 8.31 km SSW Tomb of Khawaja Khizr, Sonipat- 8.34 km NW Old Mughal Kos Minar, Jawahri- 10.37 km NNW Old Mughal Kos Minar, Rajpur- 13.80 km NNW
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No No Critically Polluted area within 15 km Radius
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The project area falls in seismic zone –IV.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) NIL
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantShambhu
DesignationCEO
Name of Company (Applicant Name should not be given here)BHARAT PRODUCTS LIMITED
AddressE- 17, 18, DSIDC Industrial Complex, New Delhi
Print